School-Based SLPA: AAC Support, Part-Time Impact

BlazerJobs, Inc.

Montrose (CO)

On-site

USD 34,000 - 52,000

Full time

12 days ago

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Healthcare benefits
Housing assistance
Meals/incidentals

Job summary

BlazerJobs, Inc. seeks a Speech-Language Pathology Assistant for a contract role spanning three elementary campuses and one high school in Montrose, CO. The position is part-time, with a three-day minimum commitment each week and uses AAC with a high school student.

Collaborate with supervising SLPs, implement IEP goals, and maintain therapy logs in line with state requirements. The contract runs through May 21, 2027, offering meaningful professional experience and flexible hours.

Qualifications

  • Active Colorado SLPA license required.
  • Experience or interest in school-based settings.
  • Familiarity with AAC devices is a plus.
  • Exceptional communication with students and staff.
  • Commitment to student-centered therapy.

Responsibilities

  • Deliver speech-language services to three elementary campuses.
  • Provide direct services and progress monitoring for one high school student (AAC).
  • Collaborate with supervising SLPs to implement IEPs.
  • Maintain therapy logs and required documentation.
  • Foster inclusive environment to maximize participation.

Skills

SLPA license
School experience
AAC familiarity
Strong communication
Student-centered therapy

Job description

BlazerJobs, Inc. seeks a Speech-Language Pathology Assistant for a contract role spanning three elementary campuses and one high school in Montrose, CO. The position is part-time, with a three-day minimum commitment each week and uses AAC with a high school student.

Collaborate with supervising SLPs, implement IEP goals, and maintain therapy logs in line with state requirements. The contract runs through May 21, 2027, offering meaningful professional experience and flexible hours.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Speech Language Pathologist Assistant (SLPA) in Montrose, CO
Speech Language Pathologist Assistant (SLPA) in Montrose, CO

BlazerJobs, Inc. • Montrose (CO)

On-site
USD 34,000 - 52,000
Healthcare benefits
Housing assistance
Meals/incidentals
Travel SLPA: School-Based Speech Therapy + AAC in CO
Travel SLPA: School-Based Speech Therapy + AAC in CO

BlazerJobs, Inc. • Montrose (CO)

On-site
USD 34,000 - 52,000
Non-taxable stipends
Travel support
Healthcare benefits
+1
School-Based SLPA: Full-Time Impactful Contract Role
School-Based SLPA: Full-Time Impactful Contract Role

BlazerJobs, Inc. • Santa Clara (CA)

On-site
USD 40,000 - 67,000
Healthcare benefits
Housing assistance
Meals/incidental
School-Based Speech Language Pathologist Assistant - Montrose, Colorado
School-Based Speech Language Pathologist Assistant - Montrose, Colorado

Soliant • Montrose (CO)

On-site
USD 44,000 - 50,000
Health, dental, and vision insurance
Travel stipends
School-Based SLP: Flexible Full/Part-Time Role
School-Based SLP: Flexible Full/Part-Time Role

BlazerJobs, Inc. • Somersworth (NH)

On-site
USD 65,000 - 75,000
School-Based SLPA: Part-Time Speech Therapy Role
School-Based SLPA: Part-Time Speech Therapy Role

Point Quest, Inc. • Colorado

On-site
USD 27,000 - 45,000
Liability insurance
Healthcare benefits
401(k) with company match
+3
Impactful School SLP/SLPA — Flexible Onsite Roles
Impactful School SLP/SLPA — Flexible Onsite Roles

BlazerJobs, Inc. • Aurora (CO)

On-site
USD 58,000 - 80,000
Healthcare benefits
Housing
Meals/incidentals
Part-Time SLPA for High School Speech Therapy
Part-Time SLPA for High School Speech Therapy

ACM Staffers • Watertown (CT)

On-site
USD 62,000 - 69,000
1099 Contract position
Part-Time
$45-$50 per hour
Elementary SLPA: Impactful School Role with Flexible Hours
Elementary SLPA: Impactful School Role with Flexible Hours

Soliant • Montrose (CO)

On-site
USD 44,000 - 50,000
Health, dental, and vision insurance
Travel stipends
Speech-Language Pathologist Assistant (SLPA) - Colorado- School based
Speech-Language Pathologist Assistant (SLPA) - Colorado- School based

Princeton Staffing Solutions • Cañon City (CO)

On-site
USD 48,000 - 64,000
Referral bonus
Premium pay
Direct deposit
+7