On-site AI Data Center Construction Lead

Bitdeer (NASDAQ: BTDR)

Abilene (TX)

Sur place

USD 150 000 - 230 000

Plein temps

Il y a 11 heures
Soyez parmi les premiers à postuler

Obtenez une réponse de cet employeur

Votre CV et votre lettre de motivation, adaptés exactement à ce que l’employeur recherche.

Passez les filtres ATS

Résumé du poste

Bitdeer seeks an AI Datacenter Construction Manager to lead on-site delivery of Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will be Bitdeer’s senior representative on site, accountable for safety, schedule, quality, and cost from mobilization through energization, commissioning, and turnover.

You will manage the general contractor and trade partners, coordinate discipline leads, and keep the site moving to plan.

Qualifications

  • 10+ years in construction management, including 5+ years leading data center or mission-critical sites.
  • Experience delivering large, fast-track builds with multiple concurrent trades.
  • Technical breadth across civil, structural, MEP, and commissioning on data center projects.
  • Field leadership: manage general contractors and trade partners on site.
  • Certifications: OSHA 30-Hour, PMP, or CCM.
  • Willingness to be based on site and travel/relocate as needed.

Responsabilités

  • Owner’s Representative: on-site lead and single point of accountability for the build.
  • Contractor Management: direct GC and trade partners on safety, quality, productivity, and schedule.
  • Daily Coordination: run site coordination meetings and look-ahead planning.
  • Schedule Delivery: drive site schedule and flag critical-path slippage.
  • Cost Oversight: review change requests, quantities, and pay applications.
  • Turnover: support commissioning and turnover activities.

Connaissances

Construction management
Data center experience
Site leadership
Contractor management

Formation

Bachelor’s degree in Construction Management or Engineering

Description du poste

Bitdeer seeks an AI Datacenter Construction Manager to lead on-site delivery of Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will be Bitdeer’s senior representative on site, accountable for safety, schedule, quality, and cost from mobilization through energization, commissioning, and turnover.

You will manage the general contractor and trade partners, coordinate discipline leads, and keep the site moving to plan.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

On-Site AI Data Center Construction Lead
On-Site AI Data Center Construction Lead

Bitdeer (NASDAQ: BTDR) • Clarington (OH)

Sur place
USD 120 000 - 180 000
Onsite AI Data Center Build Lead
Onsite AI Data Center Build Lead

Bitdeer (NASDAQ: BTDR) • Columbus (OH)

Sur place
USD 140 000 - 210 000
Training and mentoring
On-Site AI Data Center Construction Lead
On-Site AI Data Center Construction Lead

Bitdeer Technologies Group • Austin (TX)

Sur place
USD 140 000 - 190 000
Onsite AI Data Center Build Lead
Onsite AI Data Center Build Lead

Bitdeer (NASDAQ: BTDR) • Cleveland (OH)

Sur place
USD 150 000 - 230 000
On-Site AI Datacenter Build Lead
On-Site AI Datacenter Build Lead

Bitdeer (NASDAQ: BTDR) • Houston (TX)

Sur place
USD 140 000 - 210 000
Training and mentoring
On-Site AI Data Center Construction Lead
On-Site AI Data Center Construction Lead

Bitdeer Technologies Group • Abilene (TX)

Sur place
USD 150 000 - 190 000
Training and mentoring
AI Data Center Construction Lead (On-Site)
AI Data Center Construction Lead (On-Site)

Bitdeer (NASDAQ: BTDR) • Massillon (OH)

Sur place
USD 140 000 - 190 000
AI Data Center Construction Lead - On-Site, Fast-Track
AI Data Center Construction Lead - On-Site, Fast-Track

Bitdeer (NASDAQ: BTDR) • Austin (TX)

Sur place
USD 120 000 - 190 000
Training and mentoring
Director, AI Data Center Construction
Director, AI Data Center Construction

Bitdeer (NASDAQ: BTDR) • Austin (TX)

Sur place
USD 250 000 - 360 000
Head of AI Data Center Construction & Deployments
Head of AI Data Center Construction & Deployments

Bitdeer (NASDAQ: BTDR) • Abilene (TX)

Sur place
USD 240 000 - 320 000
Training & mentoring