Mechanical Project Engineer Data Center Construction

Faith Technologies Inc

United States

On-site

USD 90,000 - 130,000

Full time

5 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Faith Technologies, Inc. is seeking an experienced Mechanical Project Engineer to coordinate the mechanical scope across data-center projects.

You will support the Mechanical Project Manager and site leadership in day-to-day execution, tracking progress with field teams and trade partners to ensure timely, safe, and high-quality delivery. You will develop detailed work plans, monitor installation progress, and manage RFIs, submittals, and change processes.

Qualifications

  • Bachelor’s degree in Mechanical Engineering, Construction Management, or related field.
  • 2–6+ years of construction/engineering experience with a focus on mechanical systems.
  • Experience on mission-critical or data center projects preferred.
  • Foundational understanding of HVAC and piping systems; familiarity with coordination processes.
  • Travel: 10–20%.

Responsibilities

  • Coordinate with Mechanical Project Manager and site leadership in day-to-day execution of mechanical scope.
  • Track progress with superintendents, trade partners, and project controls to resolve issues.
  • Develop and track detailed work plans, schedules, and resource needs.
  • Monitor installation progress and identify risks to schedule, cost, and quality.
  • Prepare, track, and manage RFIs; resolve design and field issues.
  • Coordinate and review mechanical submittals, shop drawings, and equipment data for compliance.
  • Maintain submittal logs and ensure alignment with installation schedules.
  • Support change management tied to schedule, RFIs, and design updates.
  • Coordinate installation and coordination of MES & TWMUs, FSHAC & MSA, piping interconnections, and mechanical interfaces.
  • Assist in ensuring systems are installed per TakT team requirements and timing.
  • Coordinate with controls teams for system integration and commissioning readiness.
  • Support prefabrication and material management; track fabrication, delivery, and site integration.
  • Help track mechanical equipment and materials; maintain delivery paperwork, inspection reports, and invoicing.

Skills

Mechanical Systems
Project Coordination
RFIs and Submittals
Construction Management
Procore

Education

Bachelor's degree in Mechanical Engineering or Construction Management

Tools

Procore
ACC

Job description

You've discovered something special. A company that cares. Cares about leading the way in construction, engineering, manufacturing and renewable energy. Cares about redefining how energy is designed, applied and consumed. Cares about thoughtfully growing to meet market demands. And as “one of the Healthiest 100 Workplaces in America” is focused on the mind/body/soul of team members through our Culture of Care.

Minimum Requirements
  • Education: Bachelor’s degree in Mechanical Engineering, Construction Management, or related field (or equivalent experience).
  • Experience: 2 to 6+ years of construction or engineering experience, ideally with a focus on mechanical systems. Experience working on mission-critical or data center projects is preferred, along with a foundational understanding of HVAC and piping systems and familiarity with construction coordination processes.
  • Travel: 10-20%
  • Work Schedule: This position works between the hours of 6 am and 6 pm, Monday through Friday.
Key Responsibilities
  • Project Coordination & Execution Support
    • Support Mechanical Project Manager and site leadership in day-to-day execution of mechanical scope.
    • Coordinate with superintendents, trade partners and project controls to track progress and resolve issues.
    • Assist in development and tracking of detailed work plans, schedules and resource needs.
    • Monitor installation progress and identify risks impacting schedule, cost and quality.
    • Prepare, track, and manage RFIs to resolve design and field issues.
    • Coordinate and review mechanical submittals, shop drawings, and equipment data to ensure compliance with project requirements.
    • Maintain submittal logs and ensure processing aligned with installation schedules.
    • Support change management processes tied to schedule, RFIs and design updates.
  • Mechanical Systems Coordination
    • Support installation and coordination of: MES & TWMUs, FSHAC & MSA, Piping interconnections, Mechanical system interfaces.
    • Assist with ensuring systems are installed per Takt team requirements and timing.
    • Coordinate with controls teams for system integration and commissioning readiness.
    • Support prefabrication & Material Management: Support coordination of Excellerate prefabrication scope, including fabrication tracking, delivery, and site integration.
    • Assist in tracking of mechanical equipment and materials, maintain delivery paperwork, inspection reports and invoicing of mechanical MOFE equipment.
  • Field Support & Quality Assurance
    • Support field teams in resolving technical issues, design clarifications, and installation challenges.
    • Participate in site walks, inspections, and quality verification efforts.
    • Assist with tracking punch list items and ensuring closure prior to turnover.
    • Help ensure installations meet design specifications and quality standards.
  • Schedule, Reporting & Communication
    • Assist with updating and maintaining project schedules and progress reports.
    • Participate in coordination meetings and communicate issues, risks, and progress updates.
    • Maintain clear communication between field teams, design teams, and project leadership.
  • Safety & Compliance
    • Promote and enforce a strong safety culture across all mechanical activities.
    • Ensure compliance with company policies, site safety plans, and regulatory requirements.
    • Support implementation of project-specific safety plans and procedures.
    • Monitor field activities and report safety concerns.
  • Commissioning & Turnover
    • Support Assist with system startup, testing, and commissioning activities.
    • Support documentation, as-builts, and turnover packages.
  • Core Competencies
    • Strong organization and attention to detail (RFI, submittal, and tracking focus).
    • Ability to manage multiple priorities in a fast-paced environment.
    • Effective communication across field and engineering teams.
    • Problem‑solving mindset with willingness to learn complex systems.
    • Familiarity with document control and coordination platforms (ACC, Procore, etc.).
    • Performs other related duties as required and assigned.

Benefits are the Game-Changer We provide industry-leading benefits as an investment in the lives of team members and their families. You’re invited to review the full list of FTI benefits available to regular/full-time team members. Start here. Grow here. Succeed here.

Faith Technologies, Inc. is an Equal Opportunity Employer – veterans/disabled.

Employment is contingent upon successfully passing a background and drug test.

FTI participates in E-Verify; please review the E-Verify Participation and Department of Justice, Immigrant and Employee Rights Section (IER) Right to Work posters to review your legal rights and protections as a prospective employee: E-Verify Participation Poster (English/Spanish) IER Right-to-Work Poster (English/Spanish)

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Mechanical Project Engineer Data Center Construction
Mechanical Project Engineer Data Center Construction

Faith Technologies Inc • Tulsa (OK)

On-site
USD 65,000 - 90,000
Mechanical Project Manager Data Center Construction
Mechanical Project Manager Data Center Construction

FTI • Tulsa (OK)

On-site
USD 100,000 - 140,000
Mechanical Project Manager Data Center Construction
Mechanical Project Manager Data Center Construction

FTI • Montgomery (AL)

On-site
USD 120,000 - 180,000
Mechanical Project Engineer Data Center Construction
Mechanical Project Engineer Data Center Construction

FTI • Montgomery (AL)

On-site
USD 90,000 - 115,000
Mechanical Project Manager Data Center Construction
Mechanical Project Manager Data Center Construction

Faith Technologies Inc • United States

On-site
USD 120,000 - 180,000
Mechanical Project Manager Data Center Construction
Mechanical Project Manager Data Center Construction

Faith Technologies Inc • Tulsa (OK)

On-site
USD 120,000 - 180,000
Mechanical QAQC Technician
Mechanical QAQC Technician

FTI • El Paso (TX)

On-site
USD 65,000 - 90,000
Mechanical Commissioning Technician
Mechanical Commissioning Technician

FTI • Lebanon (IN)

On-site
USD 70,000 - 100,000
Assistant Project Manager- Mechanical
Assistant Project Manager- Mechanical

Faith Technologies • Olathe (KS)

On-site
USD 75,000 - 105,000
Mechanical Commissioning Technician
Mechanical Commissioning Technician

FTI • El Paso (TX)

On-site
USD 65,000 - 90,000
Benefits package
Career development
Equal Opportunity Employer
+1