Independent QA/QC Site Manager – Data Center Construction

Fleet Data Centers

Austin (TX)

On-site

USD 120,000 - 180,000

Full time

40 hours ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Medical, dental, vision insurance
401K program
Paid holidays
Unlimited PTO

Job summary

Fleet Data Centers is seeking a Site Quality Manager to own QA/QC on a mega-scale data center campus. You will report to the Quality Control Director and ensure work conforms to design documents, specs, and standards, providing independent verification away from schedule pressures.

On-site leadership includes overseeing QA/QC programs, witness/hold points, NCRs, turnover readiness, and collaboration with the Commissioning Manager to ensure smooth asset turnover.

Qualifications

  • Bachelor's degree or equivalent QA/QC experience on large-scale projects.
  • 10+ years QA/QC on mission-critical or heavy industrial sites.
  • Knowledge of CSA/MEP QA/QC, ITPs, NCR processes, turnover docs.
  • Procore proficiency and MS Office suite; codes/standards familiarity.

Responsibilities

  • Lead owner-side QA/QC on campus construction to ensure conformance with design documents.
  • Own the QA/QC program, inspections, witness/hold points and document verification.
  • Audit contractor QA/QC programs and verify nonconformance management and corrective actions.
  • Coordinate with Site Commissioning Manager for turnover readiness and documentation.
  • Mentor field staff on Fleet quality expectations.

Skills

QA/QC experience
Procore
Microsoft Office

Education

Bachelor's degree in Construction Management, Engineering, or related field
Equivalent practical QA/QC construction experience

Tools

Procore
Quality inspection tools

Job description

Fleet Data Centers is seeking a Site Quality Manager to own QA/QC on a mega-scale data center campus. You will report to the Quality Control Director and ensure work conforms to design documents, specs, and standards, providing independent verification away from schedule pressures.

On-site leadership includes overseeing QA/QC programs, witness/hold points, NCRs, turnover readiness, and collaboration with the Commissioning Manager to ensure smooth asset turnover.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Site Quality Manager — Mega Data Center QA/QC Lead
Site Quality Manager — Mega Data Center QA/QC Lead

Fleet Data Centers • Reno (NV)

On-site
USD 120,000 - 180,000
100% employer-covered medical, dental,
401K program
Paid holidays
+1
On-Site Quality Control Manager – Data Center Campus
On-Site Quality Control Manager – Data Center Campus

Fleet Data Centers • Sparks (NV)

On-site
USD 140,000 - 180,000
Benefits package
On-site role
On-Site QA/QC Lead for Mission-Critical Data Centers
On-Site QA/QC Lead for Mission-Critical Data Centers

DataX Connect • United States

On-site
USD 130,000 - 200,000
Medical plan
Dental & vision coverage
401(k) with company match
+4
Data Center QA/QC Manager - Zero-Defect Commissioning
Data Center QA/QC Manager - Zero-Defect Commissioning

Span Construction & Engineering, Inc. • Lebanon (IN)

On-site
USD 120,000 - 180,000
Onsite QA/QC Manager — Data Center Quality Champion
Onsite QA/QC Manager — Data Center Quality Champion

Hub71 Ltd • Houston (TX)

On-site
USD 85,000 - 130,000
Subsidized health, dental, and vision
Equity options
401(k) with 4% employer match
+5
Onsite QA/QC Lead - Data Center Construction
Onsite QA/QC Lead - Data Center Construction

Giga Energy • Houston (TX)

On-site
USD 110,000 - 140,000
Subsidized health insurance
401(k) with employer match
Unlimited PTO
+2
Director, Data Center Quality & Commissioning
Director, Data Center Quality & Commissioning

Serverfarm • United States

Remote
USD 190,000 - 225,000
Relocation assistance to the southernU
Paid time off and holidays
401k and full medical, dental, vision
Onsite QA/QC Lead for Mission-Critical Data Centers
Onsite QA/QC Lead for Mission-Critical Data Centers

Daksta | Connecting Mission Critical Talent • United States

On-site
USD 90,000 - 130,000
Senior QA/QC Manager — Data Center Construction
Senior QA/QC Manager — Data Center Construction

Hamilton Barnes Associates Limited • Kansas

On-site
USD 175,500 - 214,500
Medical Insurance
Health Savings Account
401(k) with employer match
+6
QA/QC Manager
QA/QC Manager

Thor • Town of Texas (WI)

On-site
USD 90,000 - 130,000