Field Engineer - Hyperscale Data Center Construction

Nexus Data Centers

Hubbard (TX)

On-site

USD 95,000 - 140,000

Full time

43 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Nexus Data Centers is hiring a Field Engineer to join our engineering group on a multi-gigawatt hyperscale AI data center campus in Hill County, TX. This role works with design and engineering to keep construction aligned with intent in real time on a large, fast-moving site.

You will translate drawings, perform field surveys, coordinate with engineers, manage RFIs, and keep accurate as-built records to feed the engineering team. This is an on-site, full-time position.

Qualifications

  • Bachelor's degree in Civil, Mechanical, or Electrical Engineering or equivalent field experience.
  • 5+ years of field engineering experience on heavy industrial, power generation, or utility-scale construction.
  • Proficiency with survey/layout tools, AutoCAD, Civil 3D, and Bluebeam.
  • Strong ability to read and interrogate design drawings and specs.

Responsibilities

  • Interpret and translate design drawings into field layout and construction execution.
  • Perform site survey, grading, and layout control for civil, structural, mechanical and electrical scopes.
  • Resolve discrepancies with engineering as field conditions arise.
  • Generate and track RFIs from the field and ensure responses are implemented.
  • Maintain as-built documentation and redlines for the engineering record.
  • Conduct field quality checks against tolerances and specs.
  • Support constructability reviews and flag design issues early.
  • Coordinate with Superintendents and Project Engineers to keep engineering scope on schedule.

Skills

Field engineering
Reading design drawings
Engaging design engineers
On-site coordination

Education

Bachelor's degree in Civil, Mechanical, or Electrical Engineering

Tools

AutoCAD
Civil 3D
Bluebeam
Total station / GPS

Job description

Nexus Data Centers is hiring a Field Engineer to join our engineering group on a multi-gigawatt hyperscale AI data center campus in Hill County, TX. This role works with design and engineering to keep construction aligned with intent in real time on a large, fast-moving site.

You will translate drawings, perform field surveys, coordinate with engineers, manage RFIs, and keep accurate as-built records to feed the engineering team. This is an on-site, full-time position.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Field Engineer
Field Engineer

Nexus Data Centers • Hubbard (TX)

On-site
USD 95,000 - 140,000
Junior Electrical Engineer
Junior Electrical Engineer

Nexus Data Centers • Hubbard (TX)

On-site
USD 65,000 - 90,000
Junior Electrical Engineer: Hands-On Power Systems
Junior Electrical Engineer: Hands-On Power Systems

Nexus Data Centers • Hubbard (TX)

On-site
USD 65,000 - 90,000
Hyperscale Data Center Field Engineer – Project Growth
Hyperscale Data Center Field Engineer – Project Growth

Instrata Technologies, LLC. • Chandler (AZ)

On-site
USD 70,000 - 100,000
Hyperscale Data Center Civil Engineer — Remote/Travel
Hyperscale Data Center Civil Engineer — Remote/Travel

FPSG • West (TX)

Remote
USD 150,000 - 190,000
Hyperscale Solutions Engineer (Hybrid)
Hyperscale Solutions Engineer (Hybrid)

Prime Data Centers • Lockhart (TX)

Hybrid
USD 200,000 - 300,000
401k match
Medical insurance
Dental insurance
+5
Construction Manager (Data Centers)
Construction Manager (Data Centers)

EPC Project Management Consulting, LLC • United States

On-site
USD 100,000 - 160,000
401(k) company match
100% covered medical, dental, and vision
Free tuition & education reimbursement
+2
Field Engineer – Data Center Construction
Field Engineer – Data Center Construction

Harder Mechanical Contractors Inc • Hereford (TX)

On-site
USD 60,000 - 80,000
Competitive salary
Medical, dental, vision benefits
Retirement plan with 10% contribution
+5
On-Site Hyperscale Data Center Project Engineer Wichita Falls
On-Site Hyperscale Data Center Project Engineer Wichita Falls

Rinvio • Wichita Falls (TX)

On-site
USD 93,676 - 121,228
Hyperscale Data Center Lead, Field Engineering
Hyperscale Data Center Lead, Field Engineering

Corning Inc. • Louisiana

On-site
USD 98,000 - 134,000
Company bonuses
401(k) matching
Health, dental, vision benefits
+1