Electrical QA/QC Manager, Data Center Construction

IREN

Childress (TX)

On-site

USD 110,000 - 150,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Health insurance
401(k) plan with company match
Paid Time Off

Job summary

IREN is seeking a Construction QA/QC Manager – Electrical to lead the project-specific QA/QC program for electrical scopes on mission-critical data center builds in Childress, TX. You will oversee ITPs, testing, FATs/SATs, and ensure NEC/IEEE/NFPA/IEC compliance while coordinating with engineering, construction, and commissioning teams.

This role emphasizes leadership of QA/QC inspectors, documentation accuracy, and safety, with rotation shifts and on-site presence at projects, plus long-term

Qualifications

  • Bachelor’s degree in electrical engineering or related field or equivalent experience.
  • 8+ years of electrical QA/QC experience in mission-critical or data center construction.
  • Proficiency with NEC and electrical codes; ability to read electrical drawings and P&IDs.

Responsibilities

  • Lead QA/QC program for electrical scopes on the project.
  • Develop, review, and enforce ITPs, checklists, and quality procedures.
  • Oversee installation/testing of critical electrical systems (MV/LV, switchgear, UPS, PDU).
  • Witness FATs/SATs and document test results; manage punch lists.
  • Maintain QA/QC documentation and provide regular quality reports.
  • Supervise QA/QC inspectors and coordinate with subcontractors.

Skills

QA/QC leadership
Reading drawings & P&IDs
Coordination across teams
Problem solving & attention to detail
Communication skills

Education

Bachelor’s degree in electrical engineering or related field

Tools

QA/QC software
Commissioning platforms

Job description

IREN is seeking a Construction QA/QC Manager – Electrical to lead the project-specific QA/QC program for electrical scopes on mission-critical data center builds in Childress, TX. You will oversee ITPs, testing, FATs/SATs, and ensure NEC/IEEE/NFPA/IEC compliance while coordinating with engineering, construction, and commissioning teams.

This role emphasizes leadership of QA/QC inspectors, documentation accuracy, and safety, with rotation shifts and on-site presence at projects, plus long-term

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Electrical QA/QC Lead - Construction (Data Center)
Electrical QA/QC Lead - Construction (Data Center)

IREN • Childress (TX)

On-site
USD 90,000 - 120,000
Health insurance
401(k) retirement plan with company-mr
Paid time off (PTO) and holidays
+2
Electrical QA/QC Supervisor - Data Center Projects
Electrical QA/QC Supervisor - Data Center Projects

IREN • Childress (TX)

On-site
USD 85,000 - 120,000
401(k) match
Health, dental, vision insurance
Paid time off
+1
Remote Electrical QA/QC Superintendent – Data Center
Remote Electrical QA/QC Superintendent – Data Center

IREN • Childress (TX)

On-site
USD 85,000 - 116,000
Health insurance
401(k) with match
Paid time off
Electrical QA/QC Technician — Onsite Data Center Projects
Electrical QA/QC Technician — Onsite Data Center Projects

Facade Today • Sweetwater (TX)

On-site
USD 69,000 - 94,000
401(k) with company match
Paid time off
Company-paid health insurance
Data Center QA/QC Lead – Electrical Systems
Data Center QA/QC Lead – Electrical Systems

Technibus, Inc. • Pecos (TX)

On-site
USD 90,000 - 120,000
401(k) Retirement Plan with company
flexible medical-dental-vision
short-term/long-term disability
+3
Data Center QA/QC Specialist - Electrical Construction
Data Center QA/QC Specialist - Electrical Construction

IES Mission Critical • Pecos (TX)

On-site
USD 60,000 - 90,000
QA/QC Manager Data Center
QA/QC Manager Data Center

IES Commercial Inc. - C&I Division • Pecos (TX)

On-site
USD 70,000 - 90,000
401(k) Retirement Plan
Flexible medical-dental-vision insurance
Short-term/long-term disability insurance
+2
QA/QC Manager Data Center
QA/QC Manager Data Center

Ieselectricalva • Pecos (TX)

On-site
USD 75,000 - 95,000
401(k) Retirement Plan
Flexible medical-dental-vision insurance
Short-term/long-term disability insurance
+3
Senior QA/QC Lead – Mechanical (Liquid Cooling)
Senior QA/QC Lead – Mechanical (Liquid Cooling)

IREN • Childress (TX)

On-site
USD 80,000 - 87,000
Health insurance
Disability insurance
401(k) with match
+3
Electrical Construction Supervisor for Data Center Projects
Electrical Construction Supervisor for Data Center Projects

IREN • Childress (TX)

On-site
USD 81,000 - 87,000
Health insurance
401(k) retirement plan with company 1m
Paid PTO
+1