Electrical Project Estimator - Field-Based Change Orders

The Superior Group

Port Washington (WI)

Hybrid

USD 100,000 - 140,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Health Insurance
Dental Plan
Long Term Disability
Short Term Disability
Life Insurance
Vacation/PTO
401K Plan
Health Savings Account
Maternity and Parental Leave

Job summary

The Superior Group seeks a Construction Project Estimator focused on electrical estimating for field-based projects in Port Washington, Wisconsin. You will interpret drawings, read specifications, and perform takeoffs to capture scope changes in collaboration with project operations, field supervision, subcontractors, and clients.

Responsibilities include developing change orders, pricing using labor units and historical data, and maintaining a change order log.

Qualifications

  • Must have proven experience as an Electrical Project Estimator in construction/related field.
  • Strong knowledge of electrical systems, installation methods and industry standards.
  • Proficient in estimating software such as Accubid, Trimble, Bluebeam or similar.

Responsibilities

  • Read and understand contract drawings and project specifications.
  • Review RFIs, bulletins, and field directives to identify scope changes.
  • Perform quantity takeoffs from updated drawings and field conditions.
  • Develop scopes of work for change orders including labor, materials, equipment and subcontractors.
  • Support change order pricing using labor units, historical data and field productivity.
  • Coordinate with field teams to validate installation methods and production rates.
  • Track and document change events from identification through resolution.
  • Maintain change order log (pending, approved, disputed).
  • Prepare clear cost backup for change order submissions.
  • Identify schedule impacts related to scope changes.
  • Support time-and-material tracking and field tickets.

Skills

Electrical project estimator
Electrical systems knowledge
Estimating software (Accubid Trimble,

Education

Associate or bachelor’s degree in Construction Systems Management or related field

Job description

The Superior Group seeks a Construction Project Estimator focused on electrical estimating for field-based projects in Port Washington, Wisconsin. You will interpret drawings, read specifications, and perform takeoffs to capture scope changes in collaboration with project operations, field supervision, subcontractors, and clients.

Responsibilities include developing change orders, pricing using labor units and historical data, and maintaining a change order log.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Electrical Construction Estimator — Field & Change-Order Expert
Electrical Construction Estimator — Field & Change-Order Expert

Superior • Wisconsin

On-site
USD 100,000 - 140,000
Health Insurance
Dental Plan
Long Term Disability, Short Term DI, &
+4
Electrical Construction Project Manager Port Washington WI
Electrical Construction Project Manager Port Washington WI

The Superior Group • Port Washington (WI)

Hybrid
USD 105,000 - 140,000
Health Insurance
Dental Plan
Disability Insurance
+5
Construction Project Estimator
Construction Project Estimator

Superior • Wisconsin

On-site
USD 100,000 - 140,000
Health Insurance
Dental Plan
Long Term Disability, Short Term DI, &
+4
Electrical Construction Assistant PM — On-Site Impact & Benefits
Electrical Construction Assistant PM — On-Site Impact & Benefits

The Superior Group • Port Washington (WI)

Hybrid
USD 65,000 - 110,000
Health Insurance
Dental Plan
Long Term Disability
+6
Construction Project Estimator
Construction Project Estimator

The Superior Group • Port Washington (WI)

Hybrid
USD 100,000 - 140,000
Health Insurance
Dental Plan
Long Term Disability
+6
Electrical Construction Assistant Project Manager (On-Site)
Electrical Construction Assistant Project Manager (On-Site)

Superior • Wisconsin

On-site
USD 70,000 - 99,000
Health insurance
Dental plan
Disability insurance
+3
Electrical Construction Project Lead
Electrical Construction Project Lead

Fourgen Holdings, Inc. • Port Washington (WI)

Hybrid
USD 90,000 - 140,000
Medical, dental, and vision insurance
401(k) with company match
Profit sharing
+2
Electrical Estimator | Industrial & Data Center
Electrical Estimator | Industrial & Data Center

The State Group • Janesville (WI)

On-site
USD 90,000 - 130,000
100% paid medical insurance
Paid time off
401(k) with company match
+1
Electrical Estimator/ Puchasing Agent
Electrical Estimator/ Puchasing Agent

SARASOTA ELECTRIC LLC • Sarasota (FL)

On-site
USD 70,000 - 110,000
Electrical Project Estimator: Build Safe Solutions
Electrical Project Estimator: Build Safe Solutions

nVent • Madison (WI)

On-site
USD 70,000 - 90,000
Medical, dental, and vision plans
401(k) retirement plan with company 2%
Tuition reimbursement
+3