Stand out for this role — generate a tailored resume and cover letter in about a minute.
Northrop Grumman Aeronautics Systems in Melbourne, FL is seeking a Program Cost and Schedule Control Analyst (Level 3) or Senior (Level 4) to provide financial and administrative support within an IPT. On-site role with responsibilities for EVMS-based budgeting, variance analysis, and performance reporting.
The role requires a Secret clearance eligibility, strong analytical skills, and experience with SAP/Cobra, and budget baseline development. On-site in Melbourne, FL with travel as needed.
Northrop Grumman Aeronautics Systems in Melbourne, FL is seeking a Program Cost and Schedule Control Analyst (Level 3) or Senior (Level 4) to provide financial and administrative support within an IPT. On-site role with responsibilities for EVMS-based budgeting, variance analysis, and performance reporting.
The role requires a Secret clearance eligibility, strong analytical skills, and experience with SAP/Cobra, and budget baseline development. On-site in Melbourne, FL with travel as needed.