Document Control Specialist I: Change Order & BOM Expert

Werfenlife SA.

New York (NY)

On-site

USD 65,000 - 85,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Job summary

Werfen is seeking a Change Order Specialist I to prioritize and coordinate change order submissions, interfacing across functions to ensure changes are well documented and implemented. The role touches BOMs, drawings, routings, and ERP data, with emphasis on compliance and process improvement.

The position requires an Associate degree and 1 year of documentation control experience, plus strong communication skills and proficiency with SAP, Word, Excel, Visio, and Acrobat. Travel is not required.

Qualifications

  • Associates Degree in a business or technical discipline or equivalent.
  • Minimum of 1 year of documentation control experience.
  • Experience with electronic change control systems and ERP interfaces.
  • 3+ years of related experience in Operations, Quality, or R&D.
  • Strong written and verbal communication skills.

Responsibilities

  • Prioritize and coordinate Change Order submissions with cross-functional teams.
  • Review change orders for completeness and accuracy; document changes to BOMs and drawings.
  • Assist with AML processing, VP submissions, and ROHS project guidance.
  • Support customers in Change Order planning and implementation.

Skills

Oral and Written Communications
Action Oriented
Organization
Team Work

Education

Associates Degree in a business or technical discipline

Tools

Microsoft Word
Microsoft Excel
Visio
Adobe Acrobat
SAP

Job description

Werfen is seeking a Change Order Specialist I to prioritize and coordinate change order submissions, interfacing across functions to ensure changes are well documented and implemented. The role touches BOMs, drawings, routings, and ERP data, with emphasis on compliance and process improvement.

The position requires an Associate degree and 1 year of documentation control experience, plus strong communication skills and proficiency with SAP, Word, Excel, Visio, and Acrobat. Travel is not required.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Document Control & Change Management Specialist I
Document Control & Change Management Specialist I

Werfen • Orangeburg (SC)

On-site
USD 65,000 - 85,000
Document Control Specialist I
Document Control Specialist I

Werfen • Orangeburg (SC)

On-site
USD 65,000 - 85,000
Senior Change Control Lead – Cross-Functional Ops
Senior Change Control Lead – Cross-Functional Ops

Werfenlife SA. • New York (NY)

On-site
USD 100,000 - 120,000
Document Control Specialist I
Document Control Specialist I

Werfenlife SA. • New York (NY)

On-site
USD 65,000 - 85,000
Document Control Specialist
Document Control Specialist

Wellington Steele & Associates, Inc. • Carrollton (TX)

On-site
USD 70,000 - 75,000
Document Control Coordinator II: Change Orders & Compliance
Document Control Coordinator II: Change Orders & Compliance

Abbott • Los Angeles (CA)

On-site
USD 28,000 - 56,000
Free medical coverage for employees
Retirement savings plan with employer
Tuition reimbursement
+3
Document Control Lead: BOM & Change Mastery
Document Control Lead: BOM & Change Mastery

IDEX • Keene (NH)

On-site
USD 60,000 - 75,000
Engineering Documentation Change Specialist ENTRY LEVEL
Engineering Documentation Change Specialist ENTRY LEVEL

ContractStaffingRecruiters.com • Middletown (CT)

On-site
USD 45,000 - 55,000
Engineering Documentation Change Specialist
Engineering Documentation Change Specialist

ContractStaffingRecruiters.com • Middletown (CT)

On-site
USD 50,000 - 70,000
Document Control Clerk
Document Control Clerk

AppleOne Employment Services • Santa Clarita (CA)

On-site
USD 52,000 - 72,000