Document Control & Change Order Specialist II

Werfenlife SA.

Bedford, Northern (MA, KY)

Hybrid

USD 80,000 - 100,000

Full time

13 days ago
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Werfen is seeking a change order coordinator to facilitate and process change orders across engineering, manufacturing, field service and marketing. You will manage SAP BOMs and the software library, ensuring proper documentation and traceability of changes.

The role requires a sound understanding of CO initiation, strong communication, and cross‑functional collaboration to maintain compliance and support lean improvements.

Qualifications

  • Bachelor's degree, preferably in Business or technical discipline, or equivalent.
  • Minimum 3 years in a document management and/or change order environment. Knowledgeable in the Change Order SAP tool.
  • Fluently understands the CO initiation process and its requirements.
  • Experience in mechanical drafter/designer utilizing engineering drafting and design software a plus.

Responsibilities

  • Facilitate, coordinate and process change orders across functions.
  • Manage software submissions and maintain the software library integrity.
  • Provide expert assistance with material disposition, BOMs, and change documentation.

Skills

Communication
Action oriented
Organization
Teamwork

Education

Bachelor's degree in business or technical
Equivalent experience in document management/CO

Tools

SAP CO tool

Job description

Werfen is seeking a change order coordinator to facilitate and process change orders across engineering, manufacturing, field service and marketing. You will manage SAP BOMs and the software library, ensuring proper documentation and traceability of changes.

The role requires a sound understanding of CO initiation, strong communication, and cross‑functional collaboration to maintain compliance and support lean improvements.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Document Control Specialist I: Change Order & BOM Expert
Document Control Specialist I: Change Order & BOM Expert

Werfenlife SA. • New York (NY)

On-site
USD 65,000 - 85,000
Document Control & Change Management Specialist I
Document Control & Change Management Specialist I

Werfen • Orangeburg (SC)

On-site
USD 65,000 - 85,000
Document Control Specialist II
Document Control Specialist II

Werfenlife SA. • Bedford (MA), Northern (KY)

On-site
USD 80,000 - 100,000
Document Control Specialist I
Document Control Specialist I

Werfen • Orangeburg (SC)

On-site
USD 65,000 - 85,000
Change Order Specialist: Project Controls & Documentation
Change Order Specialist: Project Controls & Documentation

divcon • Irving (TX)

On-site
USD 70,000 - 97,000
Growth opportunities
Medical, Dental, and Vision Insurance
401K with Employer Match
+3
Document Control Specialist I
Document Control Specialist I

Werfenlife SA. • New York (NY)

On-site
USD 65,000 - 85,000
Engineering Change & BOM Specialist
Engineering Change & BOM Specialist

Siemens Mobility • Fort Worth (TX)

On-site
USD 62,000 - 106,000
PLM Documentation & Change Order Specialist
PLM Documentation & Change Order Specialist

Applicantz • Fremont (CA)

On-site
USD 90,000 - 120,000
Document Control Coordinator II: Change Orders & Compliance
Document Control Coordinator II: Change Orders & Compliance

Abbott • Los Angeles (CA)

On-site
USD 28,000 - 56,000
Free medical coverage for employees
Retirement savings plan with employer
Tuition reimbursement
+3
Engineering Change Lead: BOM & Process Optimization
Engineering Change Lead: BOM & Process Optimization

Siemens Mobility • Fort Worth (TX)

On-site
USD 62,000 - 106,000