Data Center Construction Manager

GS2 | B Corp™

Austin (TX)

Presencial

USD 126.000 - 210.000

Jornada completa

Hace 2 días
Sé de los primeros/as/es en solicitar esta vacante
Generador de candidaturas

Destaca para este puesto — genera un currículum y una carta de presentación adaptados en cuestión de un minuto.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Annual bonus
Full benefits package
On-site role in Austin

Descripción de la vacante

GS2 | B Corp™ is seeking an Owner's Representative Construction Manager to lead an 85 MW data center ground-up build in Austin, TX. This on-site role requires stepping from a traditional GC position into the developer side, owning GMP management, GC oversight, and site direction.

You will supervise site teams, report progress to executives, and drive delivery in a fast-growth pipeline backed by private capital.

Formación

  • 2+ years in Data Center / Mission-Critical construction (Ground-up experience required).
  • Familiarity with MEP topologies and L1–L5 Commissioning / IST.
  • Active OSHA 30 certification; degree in CM or Engineering preferred.

Responsabilidades

  • Oversee 85 MW ground-up data center pipeline from site to closeout.
  • Act as on-site Owner's Representative, manage GC, safety, schedule and budget.

Conocimientos

Data Center Construction
Mission-Critical Projects
Site Leadership
MEP Knowledge
IST Commissioning

Educación

OSHA 30 Certification
Degree in CM/Engineering preferred

Descripción del empleo

Say goodbye to the General Contractor:Step into an Owner/Developer CM Role on an 85 MW Data Center Pipeline.

If you are a Construction Manager running mission-critical builds on the GC side and ready to jump to the developerside, this is the role for you!

I have exclusively partnered with a high-growth, privately-backed Data Center Developer expanding rapidly across Central Texas. They need an on-siteOwner's Representative Construction Manager to work on the delivery of a 85 MW pipeline in Austin, TX.

  • Location: Austin, TX (80% Onsite)
  • Comp: $170k – $210k Base + 20% Bonus + Full Package
  • Scope: work on an 85 MW pipeline Ground-Up Build
Why make the move?
  • The Developer Side Switch: Stop chasing bids and own the GMP, manage the GC, and run the site as the Owner.
  • True Job Security: Backed by massive private capital with an huge pipeline unaffected by market shifts.
  • Fast Career Track: Directly supervise site teams and report high-level progress to executive leadership.
What you bring?
  • 2+ years in Data Center / Mission-Critical construction (Ground-up experience required).
  • Familiarity with MEP topologies and L1–L5 Commissioning / IST.
  • Active OSHA 30 (Degree in CM/Engineering preferred).
Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Data Center Project Engineer
Data Center Project Engineer

GS2 | B Corp™ • Austin (TX)

Presencial
USD 130.000 - 160.000
Full Benefits Package
Onsite in Austin
Director of Field Operations
Director of Field Operations

MXI Partners • Austin (TX)

Híbrido
USD 270.000 - 330.000
Owner’s Rep: Data Center Construction Manager (Austin)
Owner’s Rep: Data Center Construction Manager (Austin)

GS2 | B Corp™ • Austin (TX)

Presencial
USD 126.000 - 210.000
Annual bonus
Full benefits package
On-site role in Austin
Construction Senior Project Manager - Data Centers
Construction Senior Project Manager - Data Centers

Metric DCX • Arkansas

Presencial
USD 120.000 - 160.000
Construction Senior Project Manager - Data Centers
Construction Senior Project Manager - Data Centers

Metric DCX • Louisiana (MO)

Presencial
USD 140.000 - 230.000
Construction Senior Project Manager - Data Centers
Construction Senior Project Manager - Data Centers

Metric DCX • Oklahoma

Presencial
USD 160.000 - 210.000
Vice President of Construction
Vice President of Construction

Storm4 • Town of Texas (WI)

Presencial
USD 150.000 - 250.000
100% company-paid medical insurance
Meaningful equity
Data Center MEP Director
Data Center MEP Director

GS2 | B Corp™ • Town of Texas (WI)

Presencial
USD 185.000 - 225.000
Bonus 25-30%
Data Center Construction PM - Owners Rep
Data Center Construction PM - Owners Rep

Data Center Frontier LLC • Richardson (TX), Northern (KY)

Híbrido
USD 120.000 - 160.000
Medical insurance
401(k) plan
Construction Manager
Construction Manager

Data Center TALNT • EE. UU.

Presencial
USD 180.000 - 260.000