Clinical Lab Scientist II — Generalist, Full-Time Impact

Beth Israel Lahey Health, Inc.

Peabody (MA)

On-site

USD 53,000 - 71,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Beth Israel Lahey Health, Inc. is seeking a Medical Laboratory Scientist II in Peabody to perform a variety of clinical assays, ensure quality control, and report results for diagnostic use.

The role includes instrument maintenance, training responsibilities, and rotating weekends/holidays with phlebotomy duties required. Qualified candidates have a NAACLS-accredited baccalaureate with internship and certification eligibility by ASCP, NCA, or AMT within 12 months.

Qualifications

  • Bachelor's degree including laboratory internship at NAACLS-accredited program.
  • Eligible for certification by ASCP, NCA or AMT within 12 months of hire.
  • Ability to perform complex tests and report results accurately.

Responsibilities

  • Perform clinical assays across disciplines and report results.
  • Conduct QC/QA procedures and document results.
  • Maintain and troubleshoot instruments and equipment.
  • Assist in training new staff and students.

Skills

Clinical tests knowledge
Analytical ability
Concentration under pressure
Manual dexterity
Interpersonal communication

Education

NAACLS internship included in baccalaureate degree

Tools

Laboratory instruments
Quality control equipment

Job description

Beth Israel Lahey Health, Inc. is seeking a Medical Laboratory Scientist II in Peabody to perform a variety of clinical assays, ensure quality control, and report results for diagnostic use.

The role includes instrument maintenance, training responsibilities, and rotating weekends/holidays with phlebotomy duties required. Qualified candidates have a NAACLS-accredited baccalaureate with internship and certification eligibility by ASCP, NCA, or AMT within 12 months.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Clinical Lab Scientist II — Generalist (Multi-Discipline)
Clinical Lab Scientist II — Generalist (Multi-Discipline)

Beth Israel Lahey Health • Peabody (MA)

On-site
USD 54,000 - 72,000
Senior Medical Laboratory Scientist – Day Shift & Generalist
Senior Medical Laboratory Scientist – Day Shift & Generalist

Beth-Israel-Lahey-Health • Peabody (MA)

On-site
USD 54,000 - 72,000
Clinical Lab Scientist II: Impactful Diagnostics & Growth
Clinical Lab Scientist II: Impactful Diagnostics & Growth

Beth Israel Deaconess Medical Center, Inc. • Boston (MA)

On-site
USD 55,000 - 73,000
Clinical Laboratory Scientist II - Impactful Diagnostics
Clinical Laboratory Scientist II - Impactful Diagnostics

Socket.dev • Boston (MA)

On-site
USD 54,000 - 73,000
Senior Medical Lab Scientist II: Impactful, Precise Testing
Senior Medical Lab Scientist II: Impactful, Precise Testing

Beth Israel Lahey Health • Boston (MA)

On-site
USD 55,000 - 73,000
Medical Laboratory Scientist II, Peabody, 40 Hours, Dayshift
Medical Laboratory Scientist II, Peabody, 40 Hours, Dayshift

Beth Israel Lahey Health • Peabody (MA)

On-site
USD 54,000 - 72,000
Medical Laboratory Scientist II, Peabody, 40 Hours, Dayshift
Medical Laboratory Scientist II, Peabody, 40 Hours, Dayshift

Beth-Israel-Lahey-Health • Peabody (MA)

On-site
USD 54,000 - 72,000
Clinical Lab Scientist — Delivering Timely Diagnostics
Clinical Lab Scientist — Delivering Timely Diagnostics

Beth Israel Lahey Health • Winchester (VA)

On-site
USD 52,000 - 72,000
Entry-Level Medical Laboratory Scientist - Make a Difference
Entry-Level Medical Laboratory Scientist - Make a Difference

Beth Israel Lahey Health • Winchester (VA)

On-site
USD 50,000 - 66,000
Entry-Level Medical Laboratory Scientist (MLS)
Entry-Level Medical Laboratory Scientist (MLS)

Beth Israel Lahey Health, Inc. • Northern (KY)

Hybrid
USD 75,000 - 100,000