A complete application in a minute
Tailored resume and cover letter, ready to send.
Align seeks a Project Manager to oversee second-shift construction activities for hyperscale data center white space fit-outs within colocation environments. This role manages onsite execution, coordinates trades, ensures quality control, and maintains progress against the project schedule.
The position is based in the Detroit metro area and requires working onsite during the second shift, roughly 4:00 p.m. to midnight, with travel outside the Ann Arbor area as project needs dictate.
Align seeks a Project Manager to oversee second-shift construction activities for hyperscale data center white space fit-outs within colocation environments. This role manages onsite execution, coordinates trades, ensures quality control, and maintains progress against the project schedule.
The position is based in the Detroit metro area and requires working onsite during the second shift, roughly 4:00 p.m. to midnight, with travel outside the Ann Arbor area as project needs dictate.