HVAC Site Engineer (Data Center Construction)

Branch of Sterling and Wilson Data Center Private

Riyadh

On-site

SAR 150,000 - 190,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Branch of Sterling and Wilson Data Center Private is seeking an experienced Mechanical Engineer to supervise and execute HVAC works for data center projects in Riyadh. You will review IFC shop drawings, coordinate with Civil, Electrical, Plumbing, Firefighting ELV and BIM teams, and ensure safety and quality.

You will manage installation of AHUs, FCUs, CRAC/CRAH units, chillers, pumps, and associated equipment, monitor progress, document testing, and support commissioning and handover with a

Qualifications

  • Diploma/B.E./B.Tech in Mechanical Engineering / HVAC or equivalent.
  • 6-10 years of relevant HVAC site execution experience, preferably Data Center / Mission Critical / Large EPC projects.
  • Strong knowledge of HVAC installation, chilled-water systems, ventilation and critical cooling systems.

Responsibilities

  • Supervise and execute HVAC works per approved drawings, specifications, method statements and project schedule.
  • Review IFC shop drawings and coordinate with Civil, Electrical, Plumbing, Firefighting ELV and BIM teams to resolve clashes and interfaces.
  • Monitor subcontractors' manpower, materials, productivity and daily progress to ensure on-time delivery.
  • Ensure proper installation of ducting, piping, insulation, supports and associated services.
  • Coordinate pressure testing, flushing, duct leakage testing, TAB and testing commissioning activities.
  • Raise close WIR/IR/NCRs, punch points and inspection observations.
  • Support pre-commissioning, commissioning and integrated testing for Data Center systems.
  • Maintain progress reports, testing records, as-built drawings and handover documentation.

Skills

HVAC site execution
Data center experience
Site coordination
Problem solving

Education

Diploma/B.E./B.Tech in Mechanical Engineering / HVAC

Tools

AutoCAD
BIM/Navisworks/Revit

Job description

Supervise and execute HVAC works as per approved drawings specifications method statements and project schedule Manage installation of AHUs FCUs CRAC CRAH units chillers pumps cooling towers ducting piping valves and associated equipment Review IFC shop drawings and coordinate with Civil Electrical Plumbing Firefighting ELV and BIM teams to resolve clashes and interfaces Monitor HVAC subcontractors manpower materials productivity and daily progress Ensure proper installation of ducting chilled-water piping insulation supports equipment and associated services Coordinate pressure testing flushing duct leakage testing TAB and testing commissioning activities Ensure compliance with approved method statements ITPs QA QC and HSE requirements Raise close WIR IR NCRs punch points and inspection observations Support HVAC pre-commissioning commissioning and integrated testing particularly for critical Data Center systems Maintain progress reports testing records as-built drawings and handover documentation.

Diploma/B.E./B. Tech in Mechanical Engineering / HVAC / relevant discipline. 6-10 years of relevant HVAC site execution experience Data Center / Mission Critical / Large EPC project experience preferred Strong knowledge of HVAC installation, chilled-water systems, ventilation and critical cooling systems Experience with CRAH/CRAC units, chillers, cooling towers, pumps and associated controls preferred Good understanding of ASHRAE standards, project specifications and applicable codes Ability to read IFC, shop and MEP coordination drawings Experience in subcontractor and site execution management Proficiency in AutoCAD; BIM/Navisworks/Revit knowledge is an advantage Strong coordination, problem-solving and site management skills.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Lead HVAC Site Engineer — Construction & Commissioning
Lead HVAC Site Engineer — Construction & Commissioning

CLEAR • Riyadh

On-site
SAR 223,000 - 402,000
HVAC Engineer
HVAC Engineer

CLEAR • Riyadh

On-site
SAR 223,000 - 402,000
HVAC Engineer
HVAC Engineer

CLEAR Engineering Consultants • Riyadh

On-site
SAR 300,000 - 450,000
HVAC SME
HVAC SME

DataVolt • Riyadh

On-site
SAR 180,000 - 250,000
HVAC Supervisor
HVAC Supervisor

Arabian Castles for General Contracting Co. • Medina

On-site
SAR 120,000 - 180,000
HVAC Technician
HVAC Technician

Atkins Realis Group • Medina

On-site
SAR 84,000 - 144,000
Site Supervisor – HVAC MEP
Site Supervisor – HVAC MEP

Nesma Global • Saudi Arabia

On-site
SAR 167,400 - 279,000
HVAC Engineer
HVAC Engineer

Manpower Solutions LLC • Dhahran Compound

On-site
SAR 150,000 - 210,000
Site Engineer - Saudi
Site Engineer - Saudi

Tate • Saudi Arabia

On-site
SAR 180,000 - 300,000
MEP/HVAC Supervisor
MEP/HVAC Supervisor

Kafou Group • Saudi Arabia

On-site
SAR 120,000 - 180,000
Competitive salary with benefits