An application made for this job — a tailored resume and cover letter that speak straight to the posting.
Jora Malaysia is seeking an HVAC/Mechanical Engineer for Data Centre Construction in JB to oversee the cooling systems essential for server reliability.
The role focuses on large-scale chilled water infrastructure, precise airflow management, and rigorous testing to ensure uninterrupted data centre operations.
Jora Malaysia will close on 16th September 2026. Thank you for being with us, we are cheering you on as you continue your career journey.
Job Description: HVAC / Mechanical Engineer
Position Purpose
The HVAC / Mechanical Engineer is responsible for the massive cooling systems needed to keep servers from overheating. This role handles large-scale chilled water infrastructure and precision airflow systems.