Stand out for this role — generate a tailored resume and cover letter in about a minute.
Jora Malaysia is seeking an HVAC/Mechanical Engineer in Johor Bahru to support data centre construction. You will oversee cooling plant installation, airflow management, and system balancing for reliable server operation.
The role focuses on large-scale chilled water systems, CRAH/CRAC units, and ductwork, with emphasis on precise installation, testing, and energy-efficient performance.
Jora Malaysia will close on 16th September 2026. Thank you for being with us, we are cheering you on as you continue your career journey.
Job Description: HVAC / Mechanical Engineer
Position Purpose
The HVAC / Mechanical Engineer is responsible for the massive cooling systems needed to keep servers from overheating. This role handles large-scale chilled water infrastructure and precision airflow systems.