Construction Scheduler: CPM Mastery in P6 & MS Project

Principle Perspective Engineering

Kuala Lumpur

On-site

MYR 80,000 - 110,000

Full time

4 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Jora Malaysia seeks a proactive civil scheduling engineer to lead CPM baselines for industrial infrastructure projects in Malaysia. You will build WBS-based schedules in Primavera P6 or MS Project, manage changes, and produce look-ahead plans for weekly planning meetings.

Strong knowledge of CPM, float management, and earned value is required. Applicants should have 3–4 years of hands-on scheduling experience, familiarity with CSA/M&E interfaces, and the ability to coordinate between site teams

Qualifications

  • 3 to 4 years of hands-on scheduling experience in industrial, infrastructure, or heavy construction.
  • Demonstrated experience building and owning CPM schedules across the full project lifecycle.
  • Experience with CSA and M&E works is strongly preferred.
  • Proficient in Primavera P6 as the core scheduling tool.
  • Competent in MS Project as a secondary tool.
  • Able to construct WBS, logic ties, milestones, history of S-curves from scratch.
  • Familiar with CPM critical path methodology, float management, and earned value concepts.
  • Understanding of delay analysis techniques (TIA, windows analysis, as-planned vs. as-built).
  • Knowledge of EOT processes and claims documentation in construction.

Responsibilities

  • Develop the construction method statement covering sequencing, phasing, access, logistics, lifting, and CSA/M&E interfaces.
  • Build the CPM baseline schedule in Primavera P6 or MS Project with logic ties and milestones.
  • Present and obtain sign-off on the baseline programme before construction mobilises.
  • Manage all changes to the baseline through a revision and approval process.
  • Publish 2-week and 4-week look-ahead plans weekly for planning meetings.
  • Collect actual progress data from project engineers and subcontractors at updates.
  • Recalculate float and critical path after every update and flag variances.
  • Load labour, plant, equipment, and materials into the schedule and generate histograms.
  • Produce and update S-curves at key milestones for reporting.
  • Maintain an interface register linking the programme to procurement, drawings, and subcontracts.

Skills

CPM scheduling
Critical path
Float management
Earned value
Delay analysis
EOT awareness

Education

Degree in Civil Engineering, Construction Management, Quantity Surveying, or equivalent

Tools

Primavera P6
MS Project

Job description

Jora Malaysia seeks a proactive civil scheduling engineer to lead CPM baselines for industrial infrastructure projects in Malaysia. You will build WBS-based schedules in Primavera P6 or MS Project, manage changes, and produce look-ahead plans for weekly planning meetings.

Strong knowledge of CPM, float management, and earned value is required. Applicants should have 3–4 years of hands-on scheduling experience, familiarity with CSA/M&E interfaces, and the ability to coordinate between site teams

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Construction Scheduling Lead | MS Project Expert
Construction Scheduling Lead | MS Project Expert

Creationz Alliance Group • Puchong

On-site
MYR 67,000 - 112,000
Construction Scheduler
Construction Scheduler

Principle Perspective Engineering • Kuala Lumpur

On-site
MYR 80,000 - 110,000
Lead Project Scheduler & Primavera P6 CPM Expert
Lead Project Scheduler & Primavera P6 CPM Expert

Airswift • Johor

On-site
MYR 90,000 - 150,000
Strategic Project Planner: Primavera & CPM Expert
Strategic Project Planner: Primavera & CPM Expert

Bina Schedulers • Kulim

On-site
MYR 67,000 - 123,000
Project Scheduler - Civil/Construction & MS Project Expert
Project Scheduler - Civil/Construction & MS Project Expert

Dynaciate Engineering • Kuala Selangor

On-site
MYR 67,000 - 100,000
Senior Project Scheduler – Civil Construction Planning
Senior Project Scheduler – Civil Construction Planning

Superb Impression Creationz • Puchong

On-site
MYR 100,000 - 145,000
Project Scheduler - Primavera P6 & MS Project
Project Scheduler - Primavera P6 & MS Project

Precision Control • Selangor

On-site
MYR 80,000 - 110,000
Project Planner
Project Planner

Precision Control • Selangor

On-site
MYR 80,000 - 110,000
Construction Scheduler: Lead CPM Master Plan & Delivery
Construction Scheduler: Lead CPM Master Plan & Delivery

Principle Perspective Engineering Sdn Bhd • Kuala Lumpur

On-site
MYR 100,000 - 167,000
Attractive remuneration and benefit包
Senior Project Scheduler (P6) – Civil/Infrastructure
Senior Project Scheduler (P6) – Civil/Infrastructure

Muhibbah International Labuan Ltd • Port Klang

On-site
MYR 70,000 - 110,000