Senior Engineer

Rohan Group

Chhatrapati Sambhajinagar District

On-site

INR 600,000 - 1,200,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Rohan Group in India seeks a diligent Planning & Execution professional to drive project planning, scheduling and resource optimization across major construction works. You will study BOQ, technical specs, prepare detailed plans and coordinate with execution teams to meet daily, weekly and monthly targets.

You will manage subcontractors, ensure safety, monitor progress, reduce wastage, and support QA/QC activities.

Responsibilities

  • Study the major aspects of the assigned part of the project to understand scope of work.
  • Study BOQ and technical specifications.
  • Study GFC drawings and prepare detailed planning for the assigned works in line with the base line schedule for a daily, weekly and monthly basis.
  • To work out the resources with respect to the planning.
  • Finalize work sequence and organize work in line with targets and ensure productivity.
  • Ensure availability and understanding of (WMS) work method statement with the execution team and get mock up approved from the client / PMC wherever required.
  • Guide the team assigned to the work on technicalities involved in the work, workmanship and Quality requirements and how to achieve the same without creating a re-work situation.
  • Have an overall view of the safety requirements of the site/area assigned and support safety to achieve safe work place at all stages of work.
  • Identify any unique or challenging part of the structures to be focused on.
  • Deploy the optimum team/workforce for desired productivity.
  • Have the team aligned to focus of wastage reduction and housekeeping.
  • Create the awareness in the team and make sure that the Plant & Machinery does not remain idle at work place.
  • Create a discipline in the team for daily progress reporting & planning for next days work in advance.
  • Discuss liquidation plan with team and PM under special circumstances to tide over the setbacks.
  • Ensuring timely preparation, certification and submission of relevant JMRs to the billing engineer.
  • Identify surplus material and shift or return the same to optimize rentals.
  • Monitor & optimize repetitions of shuttering material. Control wastage and damages.
  • Create, delegate and monitor uninterrupted work front to respective contractors with necessary resources to meet the targets.
  • Ensure daily TBT is done.
  • Timely preparation submission and approval of BBS for assigned structures. Ensuring the execution is in line to the approved BBS.
  • Ensure recording of site instructions if any and timely submission to the QS engineer.
  • Control wastage to contain it within the permissible limits. Encourage use of cut pieces and scrap wherever possible. Explore gainful use of surplus / waste concrete.
  • Support the QS engineer in formulating the Rate Analysis for any Non Tender item required to be executed as per approved drawings. Ensure the rate is approved prior to execution of the work and amendment issued.
  • Keep up to date record of all the reasons attributable to client for delay in his work area and ensure that the same is available when required for Extension of Time & realizing overrun charges.
  • Preparation and submission of daily progress data to planning engineer.

Job description

Key Responsibilities
1. Planning & Execution
  • Study the major aspects of the assigned part of the project to understand scope of work.
  • Study of BOQ and technical specifications.
  • Study GFC drawings and prepare detailed planning for the assigned works in line with the base line schedule for a daily, weekly and monthly basis.
  • To work out the resources with respect to the planning.
  • Finalize work sequence and organize work in line with targets and ensure productivity.
  • Ensure availability and understanding of (WMS) work method statement with the execution team and get mock up approved from the client / PMC wherever required.
  • Guide the team assigned to the work on technicalities involved in the work, workmanship and Quality requirements and how to achieve the same without creating a re-work situation.
  • Have an overall view of the safety requirements of the site/area assigned and support safety to achieve safe work place at all stages of work.
  • Identify any unique or challenging part of the structures to be focused on.
  • Deploy the optimum team/workforce for desired productivity.
  • Have the team aligned to focus of wastage reduction and housekeeping.
  • Create the awareness in the team and make sure that the Plant & Machinery does not remain idle at work place.
  • Create a discipline in the team for daily progress reporting & planning for next days work in advance.
  • Discuss liquidation plan with team and PM under special circumstances to tide over the setbacks.
  • Ensuring timely preparation, certification and submission of relevant JMRs to the billing engineer.
  • Identify surplus material and shift or return the same to optimize rentals.
  • Monitor & optimize repetitions of shuttering material. Control wastage and damages.
  • Create, delegate and monitor uninterrupted work front to respective contractors with necessary resources to meet the targets.
  • Ensure daily TBT is done.
  • Timely preparation submission and approval of BBS for assigned structures. Ensuring the execution is in line to the approved BBS.
  • Ensure recording of site instructions if any and timely submission to the QS engineer.
  • Control wastage to contain it within the permissible limits. Encourage use of cut pieces and scrap wherever possible. Explore gainful use of surplus / waste concrete.
  • Support the QS engineer in formulating the Rate Analysis for any Non Tender item required to be executed as per approved drawings. Ensure the rate is approved prior to execution of the work and amendment issued.
  • Keep up to date record of all the reasons attributable to client for delay in his work area and ensure that the same is available when required for Extension of Time & realizing overrun charges.
  • Preparation and submission of daily progress data to planning engineer.
2. Sub-Contractor Management
  • Raising requisitions in advance and follow up with PM for brought out items and third party works.
  • Monitor labour supply contractors for adequate manpower supply in line with the project targets.
  • Monitor third party works for timely supply and release of fronts in line with project schedule.
  • Ensure timely submission of bills for respective labor contractors and third parity works and follow-up for its payments.
  • Ensuring daily weekly productivity of respective contractors.
3. Special jobs and innovative approach
  • Have focus on special jobs requiring specialized agencies and equipment. Align and execute on the common understanding for these works.
  • Adopt new methodologies for improving productivity and cost optimization wherever possible.
  • Ensure proper protocols and clearances before execution of any works from concerned stakeholders’.
  • Preparation, submission and documentation of handing over protocols for all completed structures.
  • Expeditious liquidation of snag list for final demobilization from the assigned area.
4. Team Building
  • Keep the team motivated and inculcate spirit of team work.
  • Use work in hand to impart technical and practical knowledge to improve productivity and quality.
  • Have regular interactions with the team members and identify area for training to improve their performance.
  • Ensure interdepartmental coordination for the timely and smooth functioning.
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Assistant Engineer
Assistant Engineer

Rohan Group • Chhatrapati Sambhajinagar District

On-site
INR 600,000 - 900,000
Project Engineer
Project Engineer

Harla Arts • Raipur

On-site
INR 600,000 - 900,000
Project Manager - Civil
Project Manager - Civil

E C R Buildtech • Unnao District

On-site
INR 2,000,000 - 4,000,000
Civil Engineer - AM/DM
Civil Engineer - AM/DM

Jindal Power • Raigarh

On-site
INR 1,200,000 - 2,400,000
Senior Civil Engineer
Senior Civil Engineer

Sagar Skyscrapers Llp • Kondhwa Budruk

Hybrid
INR 500,000 - 750,000
Project Lead/ Project Manager
Project Lead/ Project Manager

Anarock Property Consultants • Mumbai

On-site
INR 1,800,000 - 3,000,000
Senior Manager - Execution, Seawoods
Senior Manager - Execution, Seawoods

Larsen & Toubro • Mumbai

On-site
INR 900,000 - 1,300,000
PLANNER / SCHEDULER - SURFACE
PLANNER / SCHEDULER - SURFACE

Afcons Infrastructure Limited • Mumbai

On-site
INR 600,000 - 900,000
Site Supervisor
Site Supervisor

City Trade Arcade • Khordha

On-site
INR 700,000 - 1,200,000
Project Manager (Commercial Building)
Project Manager (Commercial Building)

Pragati Infra Pvt. Ltd. • Chhatrapati Sambhajinagar District

On-site
INR 900,000 - 1,300,000