SCADA Technician

Swid Process Technologies Pvt. Ltd.

Pune

On-site

INR 350,000 - 500,000

Full time

47 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Swid Process Technologies Pvt. Ltd. Pune invites a field technician to support SCADA field-work, including inspection, wiring, and configuration under supervision of the SCADA Engineer. This role focuses on hands-on hardware and field reporting.

You will review tickets, follow site permits, document Daily Work Reports, and ensure data accuracy in the backend portal. Requires 1+ year in SCADA or related fields and basic electrical safety training.

Qualifications

  • ITI/diploma in Electronics, Electrical, Instrumentation or Networking.
  • 1+ year in communication, SCADA, CCTV/networking or solar monitoring preferred.
  • Basic RS485, Ethernet, SIM/router, meter/logger and multimeter skills.
  • Ability to follow configuration instructions and maintain credential confidentiality.
  • Electrical/work-at-height safety training, travel and field readiness.

Skills

SCADA
Communication
Networking
Electrical safety

Education

ITI/diploma in Electronics, Electrical, Instrumentation or Networking

Tools

RS485
Ethernet
SIM/router
meter/logger
multimeter

Job description

Source: SWID Interactive Master Role Bank, IV4; revised 15 October 2026. Source workbook supplied on 12 November 2026.

Department

Operations

Backup Coverage

Another SCADA Technician or Service Technician with documented SCADA competence

Direct Reports

None

Role Purpose

Execute field-level inspection, wiring, replacement and configuration support for SCADA and communication systems under the SCADA Engineer.

Job Description and Responsibilities
  • Inspect power supplies, fuses, cables, connectors, RS485/network wiring, routers, SIMs, meters, gateways and data loggers.
  • Perform approved continuity, voltage, communication and network checks safely.
  • Replace/configure devices using settings supplied or approved by the SCADA Engineer.
  • Verify live portal data, timestamps and device status with the backend team.
  • Label wiring/devices and capture photographs, serials and configuration evidence.
  • Return defective devices and reconcile tools/spares.
  • Maintain and update the Daily Work Report (DWR) every working day with tasks, progress, results, pending actions, blockers and supporting evidence.
Daily Modus Operandi
  • Review ticket and step plan with SCADA Engineer.
  • Check PPE, tools, test equipment, device settings and spares.
  • Follow site permit/isolation requirements.
  • Inspect power, wiring, network and devices systematically.
  • Repair/replace/configure only as authorized and verify with backend portal.
  • Label, photograph and record serial/settings; reconcile defective/unused items.
  • Submit field report and DWR.
  • Update DWR daily in the company-provided software and share with the reporting manager.
Role Boundary

This role remains accountable for the outputs listed above even when work is delegated. During absence or vacancy, the named backup may perform essential transactions within documented authority. Technical approvals, commercial commitments, safety waivers and quality acceptance may be exercised only by a competent and authorized person. Handover must include current trackers, pending actions, access credentials under approved custody, documents and due dates.

Key Result Areas
  • Field communication restoration
  • Wiring and device workmanship
  • Test and evidence accuracy
  • Tool/spare accountability
  • Safe execution and escalation
  • Daily Work Report completeness and accuracy
Key Performance Indicators
  • Field support for outage detection within 24 hours | Target: Within 24 elapsed hours from outage occurrence | Review: Per outage
  • Field resolution within 48 hours of outage occurrence | Target: Within 48 elapsed hours from outage occurrence | Review: Per outage
  • First-visit resolution and installation quality | Target: First-visit resolution >=90%; rework <=2% | Review: Monthly
  • Closure evidence completeness | Target: 100% complete closure evidence | Review: Monthly
  • Tool and device control | Target: Zero avoidable tool/device loss | Review: Continuous
  • DWR updation and accuracy | Target: 100% of working days with a complete, accurate DWR | Review: Daily
KPI Measurement Method
  • Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
  • Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
  • First-visit resolutions / visits x 100; reworked installations / completed installations x 100.
  • Correct records or items / records or items checked x 100; retain the review evidence.
  • Count verified occurrences in the review period using the incident or exception register.
  • Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
KPI Weights
  • Field support for outage detection within 24 hours: 20%
  • Field resolution within 48 hours of outage occurrence: 45%
  • First-visit resolution and installation quality: 15%
  • Closure evidence completeness: 15%
  • Tool and device control: 5%
  • DWR updation and accuracy: 0%
Performance Framework

Review performance monthly using the specified KPI periods and evidence. Weights total 100% and express relative importance. Assess each KPI against its stated target and approved weight. Non-Sales roles have no exceeds-expectations band. Mandatory requirements remain applicable regardless of weight. Where no activity is due, record not applicable with the reason; do not record zero or invent achievement.

Target Rules
  • SCADA detection within 24 elapsed hours and resolution within 48 elapsed hours, both from outage occurrence.
  • DWR is mandatory for every role: update every working day. It is monitored as a separate compliance requirement with no additional weight; existing KPI weights remain unchanged.
Total KPI Weight

100%

Approval Status

Approved targets retained; hierarchy revised

KPI Register — Detailed Records
  • Field support for outage detection within 24 hours
    Department: Operations
    Target: Within 24 elapsed hours from outage occurrence
    Review: Per outage
    Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
    Weight: 20%
    Status: Approved targets retained; hierarchy revised
  • Field resolution within 48 hours of outage occurrence
    Department: Operations
    Target: Within 48 elapsed hours from outage occurrence
    Review: Per outage
    Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
    Weight: 45%
    Status: Approved targets retained; hierarchy revised
  • First-visit resolution and installation quality
    Department: Operations
    Target: First-visit resolution >=90%; rework <=2%
    Review: Monthly
    Measurement method: First-visit resolutions / visits x 100; reworked installations / completed installations x 100.
    Weight: 15%
    Status: Approved targets retained; hierarchy revised
  • Closure evidence completeness
    Department: Operations
    Target: 100% complete closure evidence
    Review: Monthly
    Measurement method: Correct records or items / records or items checked x 100; retain the review evidence.
    Weight: 15%
    Status: Approved targets retained; hierarchy revised
  • Tool and device control
    Department: Operations
    Target: Zero avoidable tool/device loss
    Review: Continuous
    Measurement method: Count verified occurrences in the review period using the incident or exception register.
    Weight: 5%
    Status: Approved targets retained; hierarchy revised
  • DWR updation and accuracy
    Department: Operations
    Target: 100% of working days with a complete, accurate DWR
    Review: Daily
    Measurement method: Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
    Weight: 0%
    Status: Mandatory requirement; no separate weight
  • 1. ITI/diploma in Electronics, Electrical, Instrumentation or Networking.
  • 2. 1+ year in communication, SCADA, CCTV/networking or solar monitoring preferred.
  • 3. Basic RS485, Ethernet, SIM/router, meter/logger and multimeter skills.
  • 4. Ability to follow configuration instructions and maintain credential confidentiality.
  • 5. Electrical/work-at-height safety training, travel and field readiness.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

SCADA Engineer
SCADA Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 900,000 - 1,500,000
Service Engineer
Service Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 550,000 - 900,000
Service Technician
Service Technician

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 167,000 - 312,000
Asset Performance and Customer Support Engineer
Asset Performance and Customer Support Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Project Engineer
Project Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Site Engineer DC
Site Engineer DC

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 350,000 - 650,000
Project Manager
Project Manager

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 1,200,000 - 2,400,000
Safety Supervisor
Safety Supervisor

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 450,000 - 750,000
Sr. Solar + BESS Design Engineer
Sr. Solar + BESS Design Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 1,800,000 - 3,000,000
Regulatory and Liaison Officer
Regulatory and Liaison Officer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000