Sr. Solar + BESS Design Engineer

Swid Process Technologies Pvt. Ltd.

Pune

On-site

INR 1,800,000 - 3,000,000

Full time

47 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Swid Process Technologies Pvt. Ltd. in Pune, India, is seeking a Senior Design Engineer to own all engineering deliverables, technical standards and design decisions for solar projects.

You will plan workloads, allocate tasks to design engineers, approve critical designs and drive standardization, while coordinating with Projects, Supply Chain and Quality to ensure safe, cost-effective installations.

Qualifications

  • Bachelor’s degree in Electrical Engineering with solar design exposure.
  • 8+ years in solar engineering/design including rooftop systems.
  • Expertise in layouts, SLDs, cable sizing, protection, earthing, yield.
  • Proficient in AutoCAD or equivalent and solar design tools.
  • Ability to review civil/structural interfaces and coordinate validation.
  • Strong technical judgment, customer communication and site travel capability.

Responsibilities

  • Plan engineering workload for surveys, concepts, layouts, SLDs, calculations, BoMs, approvals and as-built drawings.
  • Allocate projects directly to Design Engineers and define delivery priorities and review gates.
  • Review and approve critical designs, structural/electrical calculations, equipment selection and BoMs.
  • Standardize engineering practices, drawing templates, design assumptions, component specifications and lessons learned.
  • Resolve technical queries from customers, Projects, Supply Chain, Quality and Asset Management.

Skills

Team leadership
Customer communication
Site travel capability

Education

Bachelor’s degree in Electrical Engineering

Tools

AutoCAD / Equivalent
Solar design/simulation tools
Excel

Job description

Source: SWID Interactive Master Role Bank, IV4; revised 15 October 2026. Source workbook supplied on 12 November 2026.

Department

Operations

Reports To

Head Operations

Backup Coverage

Nominated senior Design Engineer or Head Operations for allocation/escalation

Role Purpose

Own all engineering deliverables, technical standards and design decisions through a deliberately flat team of Design Engineers.

Job Description and Responsibilities

1. Plan engineering workload for surveys, concepts, layouts, SLDs, calculations, BoMs, approvals and as-built drawings.
2. Allocate projects directly to Design Engineers and define delivery priorities and review gates.
3. Review and approve critical designs, structural/electrical calculations, equipment selection and BoMs.
4. Standardize engineering practices, drawing templates, design assumptions, component specifications and lessons learned.
5. Resolve technical queries from customers, Projects, Supply Chain, Quality and Asset Management.
6. Evaluate design changes for safety, performance, cost, constructability and contractual impact.
7. Develop Design Engineers through review feedback, training and technical audits.
Maintain and update the Daily Work Report (DWR) every working day with tasks, progress, results, pending actions, blockers and supporting evidence.

Daily Modus Operandi

1. Review new requirements, due dates and customer/site dependencies.
2. Allocate surveys and design deliverables directly to Design Engineers.
3. Review critical layouts, SLDs, calculations, BoMs and deviations.
4. Resolve RFIs and constructability issues from active sites.
5. Track customer comments, revisions and approvals.
6. Assess cost/performance impact of proposed changes with Projects and Supply Chain.
7. Update standards/lessons learned and submit the engineering DWR.
Update DWR daily in the company-provided software and share with the reporting manager.

Role Boundary

This role remains accountable for the outputs listed above even when work is delegated. During absence or vacancy, the named backup may perform essential transactions within documented authority. Technical approvals, commercial commitments, safety waivers and quality acceptance may be exercised only by a competent and authorized person. Handover must include current trackers, pending actions, access credentials under approved custody, documents and due dates.

Key Result Areas

1. Engineering turnaround
2. Design and BoM accuracy
3. Technical approval and optimization
4. Standardization and constructability
5. Technical risk management
6. Design capability development
Daily Work Report completeness and accuracy

Key Performance Indicators

1. Site survey completed within three days of assignment | Target: Within three calendar days of assignment | Review: Per survey
2. Drawings issued for customer approval within seven days of survey | Target: Within seven calendar days after survey completion | Review: Per project
3. Daily customer-approval follow-up | Target: Daily until approval received | Review: Daily
4. BOM released within 24 hours of customer approval | Target: Within 24 elapsed hours of customer approval | Review: Per phase
5. BOM accuracy, drawing review and design rework | Target: BOM accuracy >=98%; first-pass approval >=90%; design rework <=2%; 100% critical drawing reviews | Review: Monthly
6. Technical query and blocker closure | Target: Technical queries within 48 elapsed hours | Review: Per query
7. DWR updation and accuracy | Target: 100% of working days with a complete, accurate DWR | Review: Daily

KPI Measurement Method

1. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
2. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
3. Documented follow-up days / days follow-up due x 100. Record customer responses and next actions.
4. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
5. Correct BOM items / checked items; first-pass approvals / submissions; design rework cost / execution cost; review log.
6. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
7. Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.

KPI Weights

1. Site survey completed within three days of assignment: 15%
2. Drawings issued for customer approval within seven days of survey: 25%
3. Daily customer-approval follow-up: 10%
4. BOM released within 24 hours of customer approval: 25%
5. BOM accuracy, drawing review and design rework: 20%
6. Technical query and blocker closure: 5%
7. DWR updation and accuracy: 0%

Performance Framework

Review performance monthly using the specified KPI periods and evidence. Weights total 100% and express relative importance. Assess each KPI against its stated target and approved weight. Non-Sales roles have no exceeds-expectations band. Mandatory requirements remain applicable regardless of weight. Where no activity is due, record not applicable with the reason; do not record zero or invent achievement.

Target Rules

Start = later of customer project approval or receipt of at least 10% of signed order value. Let B = ceiling(project kWp / (150 x approved assigned teams)); teams must be at least one. Generation-initiation duration D = min(60, 15 x B) calendar days. Punch points raised by Quality or customer: close by start + D + 15 days. DISCOM/CEIG approvals: obtain by start + D + 30 days. Handover occurs on approval receipt with all punch points closed. Customer-payment delays extend dates only for documented days blocking planned work; count overlapping blocked days once. All project days include weekends and holidays. Example: 900 kWp with three teams gives 30/45/60 days. Staff the approved plan to meet the 60-day cap. Blockers close within 48 elapsed hours.
DWR is mandatory for every role: update every working day. It is monitored as a separate compliance requirement with no additional weight; existing KPI weights remain unchanged.

Total KPI Weight

100%

Approval Status

Approved targets retained; hierarchy revised

KPI Register — Detailed Records

Site survey completed within three days of assignment
Department: Operations
Target: Within three calendar days of assignment
Review: Per survey
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 15%
Status: Approved targets retained; hierarchy revised

Drawings issued for customer approval within seven days of survey
Department: Operations
Target: Within seven calendar days after survey completion
Review: Per project
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 25%
Status: Approved targets retained; hierarchy revised

Daily customer-approval follow-up
Department: Operations
Target: Daily until approval received
Review: Daily
Measurement method: Documented follow-up days / days follow-up due x 100. Record customer responses and next actions.
Weight: 10%
Status: Approved targets retained; hierarchy revised

BOM released within 24 hours of customer approval
Department: Operations
Target: Within 24 elapsed hours of customer approval
Review: Per phase >Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 25%
Status: Approved targets retained; hierarchy revised

BOM accuracy, drawing review and design rework
Department: Operations
Target: BOM accuracy >=98%; first-pass approval >=90%; design rework <=2%; 100% critical drawing reviews
Review: Monthly
Measurement method: Correct BOM items / checked items; first-pass approvals / submissions; design rework cost / execution cost; review log.
Weight: 20%
Status: Approved targets retained; hierarchy revised

Technical query and blocker closure
Department: Operations
Target: Technical queries within 48 elapsed hours
Review: Per query
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 5%
Status: Approved targets retained; hierarchy revised

DWR updation and accuracy
Department: Operations
Target: 100% of working days with a complete, accurate DWR
Review: Daily
Measurement method: Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
Weight: 0%
Status: Mandatory requirement; no separate weight

1. Bachelor’s degree in Electrical Engineering; multidisciplinary solar design exposure required.
2. 8+ years in solar engineering/design, including industrial rooftop systems and team leadership.
3. Expertise in layouts, SLDs, cable sizing, protection, earthing, yield, BoM and applicable standards.
4. AutoCAD / Equivalent and solar design/simulation tools; strong Excel / Equivalent and document control.
5. Ability to review civil/structural interfaces and coordinate specialist validation.
6. Strong technical judgment, customer communication and site-travel capability.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Project Engineer
Project Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Project Manager
Project Manager

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 1,200,000 - 2,400,000
Site Engineer DC
Site Engineer DC

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 350,000 - 650,000
Head Operations
Head Operations

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 2,500,000 - 4,200,000
Regulatory and Liaison Officer
Regulatory and Liaison Officer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Service Engineer
Service Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 550,000 - 900,000
Asset Performance and Customer Support Engineer
Asset Performance and Customer Support Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Service Technician
Service Technician

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 167,000 - 312,000
Chief Operating Officer
Chief Operating Officer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 6,000,000 - 7,500,000
Head Supply Chain
Head Supply Chain

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 3,500,000 - 5,500,000