Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Swid Process Technologies Pvt. Ltd. is seeking a Site Engineer for DC-side solar installation and frontline workforce control in Pune. You will oversee installation, testing and termination up to inverter/DCDB limits, with responsibility for safety, quality and daily progress reporting.
The role emphasizes supervising technicians, coordinating permits, and maintaining accurate DWRs, while ensuring adherence to drawings and safety standards on site.
Department: Operations
Solar Technician and Installer
Project Engineer or another competent Site Engineer DC
Own DC-side solar installation and frontline workforce control from structure/module installation through DC cabling, testing and termination at the inverter or DCDB battery limit.
The Site Engineer DC owns the DC work package up to the DC connection at the inverter or DCDB, as defined by the approved SLD. The role must jointly hand over polarity, string test, insulation, torque, labelling and red-line evidence to Site Engineer AC and Quality before energization. Physical mounting and earthing of inverter/DCDB/ITB and the AC output onward remain with Site Engineer AC. Reserved approvals, safety waivers and energization may be exercised only by authorized competent persons.
Review performance monthly using the specified KPI periods and evidence. Weights total 100% and express relative importance. Assess each KPI against its stated target and approved weight. Non-Sales roles have no exceeds-expectations band. Mandatory requirements remain applicable regardless of weight. Where no activity is due, record not applicable with the reason; do not record zero or invent achievement.
Start = later of customer project approval or receipt of at least 10% of signed order value. Let B = ceiling(project kWp / (150 x approved assigned teams)); teams must be at least one. Generation-initiation duration D = min(60, 15 x B) calendar days. Punch points raised by Quality or customer: close by start + D + 15 days. DISCOM/CEIG approvals: obtain by start + D + 30 days. Handover occurs on approval receipt with all punch points closed. Customer-payment delays extend dates only for documented days blocking planned work; count overlapping blocked days once. All project days include weekends and holidays. Example: 900 kWp with three teams gives 30/45/60 days. Staff the approved plan to meet the 60-day cap. Blockers close within 48 elapsed hours.
DWR is mandatory for every role: update every working day. It is monitored as a separate compliance requirement with no additional weight; existing KPI weights remain unchanged.
100%
Approved targets retained; hierarchy revised
Daily target achievement
Department: Operations
Target: >= 90%
Review: Daily
Measurement method: Actual achieved ÷ approved target for the period × 100.
Weight: 35%
Status: Approved targets retained; hierarchy revised
Workforce utilization
Department: Operations
Target: >= 85%
Review: Daily
Measurement method: Productive deployed labour hours / available assigned labour hours x 100.
Weight: 10%
Status: Approved targets retained; hierarchy revised
Drawing/inspection compliance
Department: Operations
Target: >= 95% first pass
Review: Daily
Measurement method: Compliant/on-time items ÷ total applicable items × 100.
Weight: 20%
Status: Approved targets retained; hierarchy revised
Measurement accuracy
Department: Operations
Target: >= 98%
Review: Daily
Measurement method: Correct records/items ÷ records/items checked × 100.
Weight: 15%
Status: Approved targets retained; hierarchy revised
Tool/material loss
Department: Operations
Target: Zero
Review: Monthly
Measurement method: Count of verified incidents/exceptions during the review period.
Weight: 10%
Status: Approved targets retained; hierarchy revised
Attendance and records
Department: Operations
Target: 100% daily attendance, progress report and next-day plan
Review: Daily
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 10%
Status: Approved targets retained; hierarchy revised
DWR updation and accuracy
Department: Operations
Target: 100% of working days with a complete, accurate DWR
Review: Daily
Measurement method: Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
Weight: 0%
Status: Mandatory requirement; no separate weight