Swid Process Technologies Pvt. Ltd. in Pune seeks a Site Engineer for solar EPC site execution. You will study drawings, BoM, scope and safety requirements to plan daily outputs and deliverables.
Responsibilities include preparing work fronts, coordinating materials and tools, supervising progress, and ensuring safety, quality and commissioning support with daily DWR updates.
Source: SWID Interactive Master Role Bank, IV4; revised 15 October 2026. Source workbook supplied on 12 November 2026.
Operations
Project Manager
Another Project Engineer or the Project Manager
Plan and execute assigned site works safely, correctly and on schedule, converting approved drawings and resources into measurable daily output.
This role remains accountable for the outputs listed above even when work is delegated. During absence or vacancy, the named backup may perform essential transactions within documented authority. Technical approvals, commercial commitments, safety waivers and quality acceptance may be exercised only by a competent and authorized person. Handover must include current trackers, pending actions, access credentials under approved custody, documents and due dates.
Review performance monthly using the specified KPI periods and evidence. Weights total 100% and express relative importance. Assess each KPI against its stated target and approved weight. Non-Sales roles have no exceeds-expectations band. Mandatory requirements remain applicable regardless of weight. Where no activity is due, record not applicable with the reason; do not record zero or invent achievement.
Start = later of customer project approval or receipt of at least 10% of signed order value. Let B = ceiling(project kWp / (150 x approved assigned teams)); teams must be at least one. Generation-initiation duration D = min(60, 15 x B) calendar days. Punch points raised by Quality or customer: close by start + D + 15 days. DISCOM/CEIG approvals: obtain by start + D + 30 days. Handover occurs on approval receipt with all punch points closed. Customer-payment delays extend dates only for documented days blocking planned work; count overlapping blocked days once. All project days include weekends and holidays. Example: 900 kWp with three teams gives 30/45/60 days. Staff the approved plan to meet the 60-day cap. Blockers close within 48 elapsed hours.
DWR is mandatory for every role: update every working day. It is monitored as a separate compliance requirement with no additional weight; existing KPI weights remain unchanged.
100%
Approved targets retained; hierarchy revised
Weekly target achievement
Department: Operations
Target: >= 90%
Review: Weekly
Measurement method: Actual achieved ÷ approved target for the period × 100.
Weight: 35%
Status: Approved targets retained; hierarchy revised
First-pass inspection
Department: Operations
Target: >= 95%
Review: Daily / milestone
Measurement method: Items accepted at first review/inspection ÷ total items submitted × 100.
Weight: 20%
Status: Approved targets retained; hierarchy revised
Rework
Department: Operations
Target: <= 2%
Review: Monthly
Measurement method: Affected items ÷ total items checked or completed × 100.
Weight: 10%
Status: Approved targets retained; hierarchy revised
Material wastage
Department: Operations
Target: <= 1%
Review: Project
Measurement method: Wasted material quantity / issued quantity for each material x 100; do not aggregate unlike units.
Weight: 10%
Status: Approved targets retained; hierarchy revised
DWR and measurement records
Department: Operations
Target: 100% same-day evidence-based DWR and next-day plan
Review: Daily
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 15%
Status: Approved targets retained; hierarchy revised
Major safety violation
Department: Operations
Target: Zero
Review: Continuous
Measurement method: Count verified occurrences in the review period using the incident or exception register.
Weight: 10%
Status: Approved targets retained; hierarchy revised
DWR updation and accuracy
Department: Operations
Target: 100% of working days with a complete, accurate DWR
Review: Daily
Measurement method: Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
Weight: 0%
Status: Mandatory requirement; no separate weight
1. Engineering degree/diploma, preferably Electrical or Mechanical.
2. 3+ years in solar EPC/site execution; industrial rooftop exposure preferred.
3. Ability to read layouts, SLDs, cable schedules and structure drawings.
4. Knowledge of installation, testing, electrical safety and work-at-height controls.
5. Manpower leadership, measurement, reporting and basic cost awareness.
6. Comfort with ERP/mobile reporting, Excel / Equivalent and extended site deployment.