Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Swid Process Technologies Pvt. Ltd. in Pune seeks an experienced Design Engineer to conduct site surveys, prepare layouts, SLDs, BoMs and drawings for solar projects.
You will size equipment, perform calculations, and maintain daily DWR to ensure constructible, approval-ready deliverables. Join a team that coordinates closely with the Project Manager for customer inputs and approvals, and to respond promptly to RFIs and site changes.
Source: SWID Interactive Master Role Bank, IV4; revised 15 October 2026. Source workbook supplied on 12 November 2026.
Operations
None
Another Design Engineer designated by Head Engineer
Conduct accurate surveys and prepare safe, optimized, constructible and approval-ready solar engineering deliverables and BoMs.
This role remains accountable for the outputs listed above even when work is delegated. During absence or vacancy, the named backup may perform essential transactions within documented authority. Technical approvals, commercial commitments, safety waivers and quality acceptance may be exercised only by a competent and authorized person. Handover must include current trackers, pending actions, access credentials under approved custody, documents and due dates.
Review performance monthly using the specified KPI periods and evidence. Weights total 100% and express relative importance. Assess each KPI against its stated target and approved weight. Non‑Sales roles have no exceeds‑expectations band. Mandatory requirements remain applicable regardless of weight. Where no activity is due, record not applicable with the reason; do not record zero or invent achievement.
Start = later of customer project approval or receipt of at least 10% of signed order value. Let B = ceiling(project kWp / (150 x approved assigned teams)); teams must be at least one. Generation‑initiation duration D = min(60, 15 x B) calendar days. Punch points raised by Quality or customer: close by start + D + 15 days. DISCOM/CEIG approvals: obtain by start + D + 30 days. Handover occurs on approval receipt with all punch points closed. Customer‑payment delays extend dates only for documented days blocking planned work; count overlapping blocked days once. All project days include weekends and holidays. Example: 900 kWp with three teams gives 30/45/60 days. Staff the approved plan to meet the 60‑day cap. Blockers close within 48 elapsed hours.
DWR is mandatory for every role: update every working day. It is monitored as a separate compliance requirement with no additional weight; existing KPI weights remain unchanged.
100%
Approved targets retained; hierarchy revised
Site survey completed within three days of assignment
Department: Operations
Target: Within three calendar days of assignment
Review: Per survey
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 20%
Status: Approved targets retained; hierarchy revised
Drawing preparation and timely submission for approval
Department: Operations
Target: Prepare within three days after survey; send within seven calendar days after survey
Review: Per project
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 25%
Status: Approved targets retained; hierarchy revised
Daily customer‑approval follow‑up
Department: Operations
Target: Daily until approval received
Review: Daily
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 10%
Status: Approved targets retained; hierarchy revised
BOM released within 24 hours of customer approval
Department: Operations
Target: Within 24 elapsed hours of customer approval
Review: Per phase
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 25%
Status: Approved targets retained; hierarchy revised
Design accuracy and avoidance of design‑caused rework
Department: Operations
Target: BOM accuracy ≥98%; first‑pass approval ≥90%; design rework ≤2%
Review: Monthly
Measurement method: Correct BOM items / checked items x 100; first‑pass approvals / submissions x 100; design rework cost / execution cost x 100.
Weight: 15%
Status: Approved targets retained; hierarchy revised
As‑built drawing completion
Department: Operations
Target: Within seven days of complete as‑built inputs
Review: Per project
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 5%
Status: Approved targets retained; hierarchy revised
DWR updation and accuracy
Department: Operations
Target: 100% of working days with a complete, accurate DWR
Review: Daily
Measurement method: Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
Weight: 0%
Status: Mandatory requirement; no separate weight