Head Asset Management

Swid Process Technologies Pvt. Ltd.

Pune

On-site

INR 4,000,000 - 6,000,000

Full time

4 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Swid Process Technologies Pvt. Ltd. is seeking a Head of Asset Management in Pune to own the post-commissioning portfolio for solar assets. You will oversee customer service, monitoring, performance metrics, and SCADA operations, ensuring maximum plant availability and contract adherence.

The role requires 10+ years in solar O&M/asset management with portfolio leadership, strong knowledge of PV performance, SCADA, and ERP/ticketing. Leadership and cross-functional coordination are essential.

Qualifications

  • Engineering degree/diploma (Electrical preferred).
  • 10+ years in solar O&M/service/asset management with portfolio leadership.
  • Strong understanding of PV performance, PR/yield, inverters, SCADA, electrical systems and field maintenance.
  • Knowledge of customer contracts/SLA, warranty, spares, budgeting and team deployment.
  • Experience with monitoring portals, ERP/ticketing, Excel and analytics.

Responsibilities

  • Own post-commissioning portfolio, customer service, monitoring, performance, SCADA and preventive/breakdown maintenance for maximum plant availability.
  • Set portfolio monitoring, preventive maintenance, cleaning, service and reporting standards.
  • Review generation, availability, alarms, ticket SLA, downtime and financial impact; drive improvements.
  • Direct backend, Service, SCADA and Solar Care functions; prioritize resources by safety, loss and SLA.
  • Manage AMC/O&M scope, budgets, spares, warranty escalation, vendors and profitability.
  • Lead customer reviews and escalations; approve RCA and performance improvement plans.
  • Coordinate with Engineering, Quality and Projects on defects and design improvements.
  • Maintain and update the Daily Work Report (DWR) daily with tasks and evidence.

Skills

PV performance
PR/yield
SCADA
Inverters
Electrical systems
Field maintenance
Leadership

Education

Engineering degree/diploma, preferably Electrical

Tools

Monitoring portals
ERP/ticketing
Excel

Job description

Master Role Bank – Head Asset Management

Source: SWID Interactive Master Role Bank, IV4; revised 15 October 2026. Source workbook supplied on 12 November 2026.

Designation

Head Asset Management

Department

Operations

Reports To

Head Operations

Direct Reports

Asset Performance and Customer Support Engineer; Service Engineer; SCADA Engineer; Solar Care Manager

Backup Coverage

Head Operations or nominated senior maintenance professional

Role Purpose

Own the post-commissioning portfolio, customer service, monitoring, performance, SCADA, preventive/breakdown maintenance and module-cleaning operations to maximize plant availability, generation, contract compliance and customer retention.

Job Description and Responsibilities
  1. Accept formal project handover only with required technical, warranty, access and customer records.
  2. Set portfolio monitoring, preventive maintenance, cleaning, service and reporting standards.
  3. Review generation, PR, availability, alarms, ticket SLA, downtime, financial loss and repeat failures.
  4. Direct the backend, Service, SCADA and Solar Care functions and prioritize resources by safety, loss and SLA.
  5. Manage AMC/O&M scope, budgets, spares, warranty escalation, vendors and profitability.
  6. Lead customer reviews and escalations and approve root-cause/performance improvement plans.
  7. Coordinate with Engineering, Quality and Projects on systemic defects and design improvements.
  8. Maintain and update the Daily Work Report (DWR) every working day with tasks, progress, results, pending actions, blockers and supporting evidence.
Daily Modus Operandi
  1. Review portfolio dashboard, offline plants, critical alarms, PR/yield and open tickets at generation start.
  2. Prioritize incidents by safety, generation/revenue loss and contractual SLA.
  3. Deploy/redirect Service, SCADA and Solar Care resources and confirm tools/spares/access.
  4. Review PM/cleaning schedule, overdue visits, warranty claims and repeat failures.
  5. Approve customer updates, RCA and recovery plans for critical cases.
  6. Review team closure evidence and verify plant recovery before ticket closure.
  7. Issue the maintenance performance summary and DWR.
  8. Update DWR daily in the company-provided software and share with the reporting manager.
Role Boundary

This role remains accountable for the outputs listed above even when work is delegated. During absence or vacancy, the named backup may perform essential transactions within documented authority. Technical approvals, commercial commitments, safety waivers and quality acceptance may be exercised only by a competent and authorized person. Handover must include current trackers, pending actions, access credentials under approved custody, documents and due dates.

Key Result Areas
  1. Portfolio availability and generation
  2. Ticket and maintenance SLA
  3. Preventive maintenance and cleaning
  4. Customer satisfaction and retention
  5. O&M cost, warranty and spares
  6. Performance improvement and team utilization
  7. Daily Work Report completeness and accuracy
Key Performance Indicators
  1. Normal generation restored across affected equipment within 48 hours | Target: Within 48 elapsed hours of alert/complaint receipt | Review: Monthly
  2. Service response within six hours | Target: Within six elapsed hours of alert/complaint receipt | Review: Monthly
  3. Six-month preventive-maintenance completion | Target: Every six months; 100% scheduled PM completed | Review: Monthly
  4. Cleaning within 15 days or shorter customer-order interval | Target: Every 15 calendar days or shorter customer-order interval; >=98% schedule adherence | Review: Monthly
  5. Repeat-fault prevention | Target: Repeat faults <=3% | Review: Monthly
  6. Customer communication and performance reports | Target: 100% monthly reports; satisfaction >=90% | Review: Monthly
  7. DWR updation and accuracy | Target: 100% of working days with a complete, accurate DWR | Review: Daily
KPI Measurement Method
  1. Normal generation restored across all affected equipment within 48 hours / applicable incidents due x 100.
  2. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
  3. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
  4. Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
  5. Repeat faults / resolved faults x 100.
  6. On-time reports / due x 100; favourable customer responses / valid responses x 100.
  7. Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
KPI Weights
  1. Normal generation restored across affected equipment within 48 hours: 35%
  2. Service response within six hours: 15%
  3. Six-month preventive-maintenance completion: 15%
  4. Cleaning within 15 days or shorter customer-order interval: 15%
  5. Repeat-fault prevention: 10%
  6. Customer communication and performance reports: 10%
  7. DWR updation and accuracy: 0%
Performance Framework

Review performance monthly using the specified KPI periods and evidence. Weights total 100% and express relative importance. Assess each KPI against its stated target and approved weight. Non-Sales roles have no exceeds-expectations band. Mandatory requirements remain applicable regardless of weight. Where no activity is due, record not applicable with the reason; do not record zero or invent achievement.

Total KPI Weight

100%

Approval Status

Approved targets retained; hierarchy revised

KPI Register – Detailed Records

Normal generation restored across affected equipment within 48 hours
Department: Operations
Target: Within 48 elapsed hours of alert/complaint receipt
Review: Monthly
Measurement method: Normal generation restored across all affected equipment within 48 hours / applicable incidents due x 100.
Weight: 35%
Status: Approved targets retained; hierarchy revised

Service response within six hours
Department: Operations
Target: Within six elapsed hours of alert/complaint receipt
Review: Monthly
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 15%
Status: Approved targets retained; hierarchy revised

Six-month preventive-maintenance completion
Department: Operations
Target: Every six months; 100% scheduled PM completed
Review: Monthly
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 15%
Status: Approved targets retained; hierarchy revised

Cleaning within 15 days or shorter customer-order interval
Department: Operations
Target: Every 15 calendar days or shorter customer-order interval; >=98% schedule adherence
Review: Monthly
Measurement method: Items completed within the specified deadline / items due in the review period x 100; use timestamped records.
Weight: 15%
Status: Approved targets retained; hierarchy revised

Repeat-fault prevention
Department: Operations
Target: Repeat faults <=3%
Review: Monthly
Measurement method: Repeat faults / resolved faults x 100.
Weight: 10%
Status: Approved targets retained; hierarchy revised

Customer communication and performance reports
Department: Operations
Target: 100% monthly reports; satisfaction >=90%
Review: Monthly
Measurement method: On-time reports / due x 100; favourable customer responses / valid responses x 100.
Weight: 10%
Status: Approved targets retained; hierarchy revised

DWR updation and accuracy
Department: Operations
Target: 100% of working days with a complete, accurate DWR
Review: Daily
Measurement method: Working days with a complete and accurate DWR / working days due x 100; verify work evidence, progress, blockers and manager review.
Weight: 0%
Status: Mandatory requirement; no separate weight

1. Engineering degree/diploma, preferably Electrical.
2. 10+ years in solar O&M/service/asset management with portfolio leadership.
3. Strong understanding of PV performance, PR/yield, inverters, SCADA, electrical systems and field maintenance.
4. Customer contracts/SLA, warranty, spares, budgeting and team-deployment skills.
5. Monitoring portals, ERP/ticketing, Excel / Equivalent and analytics proficiency.
6. Leadership, emergency escalation, customer communication and travel readiness.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Asset Performance and Customer Support Engineer
Asset Performance and Customer Support Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Solar Care Manager
Solar Care Manager

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 800,000
Service Engineer
Service Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 550,000 - 900,000
Head Operations
Head Operations

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 2,500,000 - 4,200,000
Head Projects
Head Projects

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 4,000,000 - 7,000,000
Service Technician
Service Technician

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 167,000 - 312,000
Project Engineer
Project Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 600,000 - 900,000
Project Manager
Project Manager

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 1,200,000 - 2,400,000
Solar Technician and Installer
Solar Technician and Installer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 240,000 - 420,000
Sr. Solar + BESS Design Engineer
Sr. Solar + BESS Design Engineer

Swid Process Technologies Pvt. Ltd. • Pune

On-site
INR 1,800,000 - 3,000,000