Senior QA/QC Manager – Data Centre Construction

ECC Group

Paris

Sur place

EUR 70 000 - 110 000

Plein temps

Il y a 42 heures
Soyez parmi les premiers à postuler
Générateur de candidature

Une candidature sur mesure pour ce poste — un CV et une lettre de motivation personnalisés qui correspondent à l’offre.

Passez les filtres ATS

Résumé du poste

ECC Group is seeking an experienced QA/QC Manager to support the delivery of a major 40MW data centre development in the Paris region. This senior, hands-on quality role ensures construction activities meet designs, specifications and standards, coordinating with client teams, designers, contractors and commissioning teams.

You will own QA/QC across the programme, drive ITPs, NCRs and handover documentation, and champion safe, efficient project delivery.

Qualifications

  • Strong experience with complex MEP installations.
  • Data centre, mission-critical or similarly complex technical project experience.
  • Strong knowledge of ITPs, NCRs, inspections, technical documentation and handover.
  • Experience managing contractor and subcontractor quality performance.
  • Ability to interpret construction drawings, specifications and technical documentation.
  • Strong stakeholder management, communication and coordination skills.
  • Professional working proficiency in English.
  • French language capability is advantageous.
  • Ability to work on site at least three days per week.

Responsabilités

  • Own QA/QC activities across the construction programme and report on quality performance.
  • Implement and maintain the Project Quality Management Plan.
  • Manage site QA/QC processes, inspections, quality KPIs and reporting.
  • Review contractor and subcontractor Quality Plans.
  • Manage Inspection & Test Plans (ITPs), method statements, inspection requests, checklists and test records.
  • Manage NCRs, defects, observations and corrective/preventive actions.
  • Conduct root-cause analysis and drive issues through to closure.
  • Coordinate quality inspections with contractors, consultants, vendors and client representatives.
  • Support commissioning readiness, system walkdowns, punch lists and final acceptance.
  • Ensure quality handover packages, test certificates, inspection records and as-built documentation are complete.

Connaissances

QA/QC management
Quality management
ITPs
Inspections
NCRs
Root-cause analysis
Construction drawings
English proficiency
On-site coordination

Description du poste

ECC Group is seeking an experienced QA/QC Manager to support the delivery of a major 40MW data centre development in the Paris region. This senior, hands-on quality role ensures construction activities meet designs, specifications and standards, coordinating with client teams, designers, contractors and commissioning teams.

You will own QA/QC across the programme, drive ITPs, NCRs and handover documentation, and champion safe, efficient project delivery.

Obtenez votre examen gratuit et confidentiel de votre CV.
ou faites glisser et déposez votre fichier ici.
Similar jobs

Postes similaires à comparer

QA/QC Manager
QA/QC Manager

ECC Group • Paris

Sur place
EUR 70 000 - 110 000
Senior QA/QC Manager - Data Centre Construction (France)
Senior QA/QC Manager - Data Centre Construction (France)

CloudHQ, LLC • Île-de-France

Sur place
EUR 75 000 - 110 000
Travel opportunities
European project exposure
QA/QC Lead – Hyperscale Data Center (Paris)
QA/QC Lead – Hyperscale Data Center (Paris)

Jones Lang LaSalle Incorporated • Paris

Sur place
EUR 110 000 - 140 000
Senior QA/QC Lead – Data Center, France
Senior QA/QC Lead – Data Center, France

CloudHQ, LLC • France

Sur place
EUR 90 000 - 130 000
Senior Design Manager, Data Centre – Paris
Senior Design Manager, Data Centre – Paris

ECC Group • Paris

Sur place
EUR 90 000 - 120 000
QAQC Manager, France
QAQC Manager, France

CloudHQ, LLC • France

Sur place
EUR 90 000 - 130 000
QAQC Manager, France
QAQC Manager, France

CloudHQ, LLC • Lisses

Sur place
EUR 90 000 - 130 000
QAQC Manager, Lisses
QAQC Manager, Lisses

CloudHQ, LLC • Île-de-France

Sur place
EUR 75 000 - 110 000
Travel opportunities
European project exposure
France Data Centre QA/QC Lead
France Data Centre QA/QC Lead

CloudHQ, LLC • Lisses

Sur place
EUR 90 000 - 130 000
Senior MEP Design Leader for Mission-Critical Data Centres
Senior MEP Design Leader for Mission-Critical Data Centres

ECC Group • Paris

Sur place
EUR 90 000 - 130 000