Project Controller

Groupe Talents Handicap

Paris

Presencial

EUR 72.000 - 90.000

Jornada completa

Hace 5 días
Sé de los primeros/as/es en solicitar esta vacante

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Descripción de la vacante

Groupe Talents Handicap is seeking a Project Controller for Sizewell B, UK. The role covers cost control, planning and scheduling, RAID management and document control, with autonomy under supervision for a defined scope.

You will work with project managers to validate estimates, maintain schedules, generate reports, and support risk and change management processes across small to mid-size work packages.

Formación

  • APM Associate Membership or equivalent.
  • APM Project Fundamentals Qualification (PFQ) desirable.
  • APMG Project Planning & Controls Foundation
  • Microsoft Office Specialist: Excel Associate
  • Primavera P6 Fundamentals required.

Responsabilidades

  • Perform standard Project Controls activities across sub-disciplines per drumbeat and quality standards.
  • Use SAP to generate cost reports; validate actual costs; assist in ETC and EAC calculations.
  • Produce EVM and productivity reporting with accurate source data.

Conocimientos

APM Associate Membership
APM PFQ
APMG PPC Foundation
Microsoft Office Specialist: Excel 
-
Primavera P6 Fundamentals

Herramientas

Excel
Primavera P6

Descripción del empleo

We are seeking a Project Controller to join our team in Sizewell B.

What will you be doing?

Within this position you will be responsible for:

In accordance with the project drumbeat and quality standards, undertake standard Project Controls activities across all sub-disciplines, such as:

Cost Control
  • Utilise SAP to generate cost collection codes, extract data, and produce cost reports;
  • Gather and validate actual costs for work packages;
  • Work with project and work package managers to generate estimates of cost for new work packages and the remaining cost (Estimate to Complete, ETC), validating and challenging the EAC for their work packages/ projects.
  • Support the production of EVM and productivity reporting by ensuring source data captured and prepared accurately.
Planning & Scheduling
  • Extract reports, data, and periodic lookaheads for projects and work packages from the schedule;
  • Conduct periodic schedule updates for progress made and future reforecasting, including physically validating progress where necesssary;
  • Know the quality standards for a schedule and be able to assure schedules against these;
  • Develop, baseline and manage a fully cost and resource loaded schedule, producing reporting such as critical path analysis, delay analysis, EVM and schedule adherence;
  • Conduct resource management from the schedule including demand vs availability analysis, and resource smoothing/ levelling.
RAID Management
  • Understand the project RAID log and be able to describe the risks and their impacts to the relevant work packages;
  • Be able to produce standard RAID reports such as TopN, Due Mitigation Actions, and Contingency Drawdown Curves;
  • Update individual risks with risk owners including revising impacts and updating mitigation actions;
  • Be able to run risk workshops with various stakeholders to either identify new risks or manage existing ones.
Document Control
  • Interface with document control systems, uploading and downloading documentation, and extracting data for status reporting;
  • Issue, track and log transmittals;
  • Conduct non-technical documentation reviews.

The above will be undertaken autonomously, under limited supervision from Project Controls Manager, on a delegated area of responsibility such as a small project, a Control Account, or a collection of Work Packages.

Key outputs:
Cost Control
  • Periodically updated and validated EAC for relevant work packages
  • Work package level cost reporting
Planning & Scheduling
  • Periodically updated and validated schedule, including progress and forecast, for relevant work packages
  • Schedule reports and extracts including resource analysis
  • Peer review of schedule quality for other project controllers
RAID Management
  • New risks and full risk register updates
  • Periodically updated RAID items and actions
  • Work package level RAID reports
Document Control
  • Non- technical documentation reviews etc
What are we looking for?

Ideal experience for this position would include:"Project Controllers would be expected to already hold the following (or demonstrate capability to the level of):

  • "Project Controllers would be expected to already hold the following (or demonstrate capability to the level of):
    • APM Associate Membership
    • APM Project Fundamentals Qualification (PFQ)
    • APMG Project Planning & Controls (PPC) Foundation
    • Microsoft Office Specialist: Excel Associate
    • Primavera P6 Fundamentals
  • And would be expected to gain the following within 2 years:
    • APMG Project Planning and Controls- Practitioner
    • APM Project Risk Level 1
    • APMG Earned Value Foundation
    • Microsoft Office Specialist: Excel Specialist

An entrant into the Project Controller role is likely someone who has spent around two years in a project controls role and is either heavily experienced in one project controls sub-function, or has been responsible for multiple sub-functions. They are confident and capable in being able to undertake core project controls activities for small areas of project delivery with limited supervision, to a suitable standard. They must be actively interested in their own development and keen to become competent on more advanced project controls tools and techniques, and being responsible for project controls outputs on more complex or larger scopes. They are able to exercise judgement and to provide a limited level of challenge, validation, analysis and testing the information going into and coming out of project controls systems, and can present and explain their outputs to work package, control account and project managers.

An established Project Controller will be able to conduct more advanced project controls techniques under minimal supervision and will be suitably experienced to guide and support junior project controllers in their duties. They will be producing their outputs to a high standard, using advanced techniques to drive deeper accuracy and realism to their work, actively identifying the causes of inaccuracies and variances and implementing solutions to resolve these each month.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Cost Controller
Cost Controller

Groupe Talents Handicap • Paris

Presencial
EUR 54.000 - 84.000
Planner
Planner

Groupe Talents Handicap • Paris

Presencial
EUR 55.000 - 75.000
Project Controller
Project Controller

John Cockerill • Lille

Presencial
EUR 52.000 - 68.000
Project Cost Controller
Project Cost Controller

Data4 Group • Francia

Híbrido
EUR 65.000 - 90.000
Project Manager
Project Manager

EWI Recruitment • Paris

Presencial
EUR 60.000 - 90.000
Senior Project Controller
Senior Project Controller

EDF • Belfort

Presencial
EUR 70.000 - 90.000
Project Manager: Lead On-Time, On-Budget Deliveries
Project Manager: Lead On-Time, On-Budget Deliveries

EWI Recruitment • Paris

Presencial
EUR 60.000 - 90.000
Project Manager
Project Manager

Groupe Talents Handicap • Paris

Presencial
EUR 70.000 - 110.000
Project Administrator
Project Administrator

Groupe Talents Handicap • Paris

Presencial
EUR 32.000 - 48.000
Project Manager
Project Manager

Cumming Group UK & Europe • Paris

Presencial
EUR 65.000 - 90.000