Substation Project Engineer - Physical Design

SEnergy

Boerne (TX)

On-site

USD 90,000 - 120,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Health Insurance
Retirement Plan (401k)
Paid Holidays
PTO with rollover
Short/Long Disability Insurance
Dental & Vision Insurance
Profit-Sharing Bonus

Job summary

SEnergy seeks an analytical, self-starter Substation Project Engineer to lead design and coordination of substation projects from 4kV to 345kV. Located in Boerne, TX, the role involves detail engineering, resource scheduling, and leading technical efforts across design teams.

Travel to project sites may be required. Ideal candidate has 3–5 years of physical design experience for electric substations, a Bachelor’s in engineering, and EIT or PE preferred.

Qualifications

  • Bachelor’s Degree in Electrical, Mechanical, or Civil Engineering.
  • EIT Certification or ability to obtain EIT Certification within 6 months of employment.
  • PE a plus!

Responsibilities

  • Perform design calculations, estimates and statistics using industry tools and methods.
  • Create drawings, visual aids and studies for substation projects including one-lines, three-lines, control schematics, wiring diagrams, relay panel arrangements, specifications, conduit, and cable sizing/routing.
  • Understand DC/AC circuits, logic design and power systems.
  • Apply the National Electrical Safety Code to the design process.
  • Develop bill of materials based on the design criteria.
  • Assist in preparing project schedules and budgets for timely completion.
  • Coordinate and assign tasks to construction or administrative staff.
  • Maintain project documentation and invoices including summaries for clients.
  • Attend project meetings with Clients to coordinate design and address issues.
  • Prepare project status reports and deliver to Client in a timely manner.
  • Quality control project work to ensure accurate CAD outputs and complete documentation.
  • Develop professional relationships with Client personnel and stakeholders.
  • Stay updated with design methodologies for Substation projects.
  • Represent SEnergy and Client in meetings with owners and other firms.
  • Ensure adherence to Client standards and scope of work.
  • Perform administrative duties as required.
  • Complete timesheets daily with project summaries for invoicing.

Skills

Analytical skills
Technical communication
Project management
Time management

Education

Bachelor's degree in Electrical, Mechanical, or Civil Engineering

Job description

Seeking analytical, self-starter with proven success in design and project coordination for electrical substations.

This position entails detail engineering and design of substation projects from conceptual design through construction from 4kV to 345kV.

The successful candidate will design, schedule resources, and lead technical efforts for electrical substation projects.

The position is located at our Boerne office and may require some overnight travel to project sites.

JOB RESPONSIBILITIES:

The principal duties and responsibilities of the Substation Project Engineer consist of, but are not limited to, the following:

  • Perform design calculations, estimates and statistics using industry tools and methods.
  • Perform engineering tasks creating drawings, visual aids and engineering studies for substation projects including one-lines, three-lines, control schematics, wiring diagrams, relay panel arrangements, specifications, conduit, and cable sizing/routing.
  • Understanding of DC/AC circuits, logic design and power systems.
  • Understand and apply the National Electrical Safety Code to the design process.
  • Develop bill of materials based on the design criteria.
  • Assist in preparing project schedules and budgets for timely completion.
  • Coordinate and assign tasks to construction or administrative staff.
  • Maintain good project documentation, including calculations, telephone conversations, design decisions, rationale and filing copies of all pertinent information.
  • Attend project meetings as necessary with Clients to coordinate design and address any issues.
  • Prepare project status reports and deliver to Client in a consistent and timely manner.
  • Quality control project work to maintain the expected standards for project deliverables, including CAD work ensuring accurate scales, proper spelling, proper formatting, and completeness.
  • Develop and maintain positive professional relationships with key Client personnel with whom project work is interfaced with.
  • Stay abreast with changing technology, work planning and design methodologies associated with Substation design.
  • Represent SEnergy and Client when meeting with other stakeholders including property owners, other engineering firms or construction services.
  • Ensure adherence to Client standards to develop detailed scope and engineering plans for projects. Partner with subject matter experts to prepare scope of work.
  • Perform administrative duties as required from time to time including mailings, office supply and documentation reproductions.
  • Complete timesheets daily with project summaries in the invoicing standard format. Prepare by deadline, accurate and complete invoice letter write-ups for project work in accordance with the Company’s standard format.
  • Other duties as assigned.
REQUIREMENTS:
EDUCATION:
  • Bachelor’s Degree in Electrical, Mechanical, or Civil Engineering
  • EIT Certification or ability to obtain EIT Certification within 6 months of employment.
  • PE a plus!
EXPERIENCE:
  • 3 - 5 years’ experience in physical design engineering for electric substations
SKILLS:
  • Possess strong analytical and technical problem-solving skills and able to communicate effectively, orally and in writing
  • Strong (effective) written and verbal communication skills, exceptional computer skills, with emphasis in project management, spreadsheet and word processing applications.
  • Strong skills of time management, organizational and multi-tasking.
PHYSICAL:
  • This position requires the ability to listen and hear, good eyesight, sitting, standing, walking, and use of hands and arms.
BENEFITS:
  • 100% Employer paid Health Insurance and 50% for first dependent
  • 200% 401(k) match up to 4.5%
  • Employer paid Short Term Disability, Long Term Disability, and Life Insurance
  • Dental & Vision Insurance
  • Paid Holidays
  • PTO starting at 3 weeks with rollover
  • Annual Employer Contribution to Health Savings Account through High-Deductible Health Plan
  • Annual Profit-Sharing Bonus based on Performance.
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Substation Project Engineer - Physical Design
Substation Project Engineer - Physical Design

Poweredbysenergy • Boerne (TX)

On-site
USD 85,000 - 120,000
100% Employer paid Health Insurance
401(k) match up to 4.5%
Disability & Life Insurance
+5
Senior Substation Engineer - Physical Design
Senior Substation Engineer - Physical Design

Poweredbysenergy • Boerne (TX)

On-site
USD 90,000 - 130,000
100% Employer paid health insurance
200% 401(k) match up to 4.5%
Employer paid Short-Term and Long-Term Disability
+5
Physical Design Manager - Substation
Physical Design Manager - Substation

SEnergy • Boerne (TX)

On-site
USD 90,000 - 130,000
100% Employer paid health insurance and 50% for first dependent
200% 401(k) match up to 4.5%
Paid Holidays
+2
Substation Physical Design Manager
Substation Physical Design Manager

The Greater BoerneChamber of Commerce • Boerne (TX)

On-site
USD 90,000 - 120,000
100% employer-paid health insurance
200% 401(k) match up to 4.5%
Paid holidays
+1
Physical Design Manager - Substation
Physical Design Manager - Substation

Poweredbysenergy • Boerne (TX)

On-site
USD 90,000 - 130,000
100% Employer paid health insurance
200% 401(k) match up to 4.5%
Paid Holidays
+1
Senior Project Manager - Substation
Senior Project Manager - Substation

Poweredbysenergy • Boerne (TX)

On-site
USD 80,000 - 100,000
100% Employer paid health insurance
50% for first dependent health insurance
200% 401(k) match up to 4.5%
+3
Substation Project Manager
Substation Project Manager

Poweredbysenergy • Boerne (TX)

On-site
USD 95,000 - 140,000
Health insurance
401(k) match
STD/LTD/Life Insurance
+5
Project Manager - Substation
Project Manager - Substation

The Greater BoerneChamber of Commerce • Boerne (TX)

On-site
USD 80,000 - 100,000
100% employer-paid health insurance
200% 401(k) match up to 4.5%
Paid holidays
+1
Substation Designer
Substation Designer

Poweredbysenergy • Boerne (TX)

On-site
USD 65,000 - 85,000
Employer paid health insurance
401(k) match
PTO with rollover
+1
Substation Designer
Substation Designer

SEnergy • Boerne (TX)

On-site
USD 70,000 - 90,000
100% Employer paid health insurance
50% for first dependent
200% 401(k) match up to 4.5%
+6