Strategic Production Planner & Schedule Risk Analyst

Lockheed Martin

Silverdale (WA)

On-site

USD 82,000 - 151,000

Full time

6 days ago
Be an early applicant
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Job summary

Lockheed Martin in Washington state is seeking a skilled material planner to coordinate material with future production plans and schedules, using cross-functional MRP systems.

Responsibilities include maintaining schedules, conducting risk analysis, and providing time-phased critical-path insights to program management. You'll develop planning data and solutions to execution conflicts, interfacing with internal/external customers to drive production improvement.

Qualifications

  • Bachelor’s degree from an accredited college in a related discipline, or equivalent experience/combined education.
  • 2 to 4+ years of experience in inventory control, material planning, or production scheduling.
  • Intermediate proficiency with Microsoft Office applications.
  • Ability to obtain and maintain a DoD Secret clearance with an Interim Secret clearance obtained prior to start; U.S. citizenship is required.
  • Demonstrated critical thinking, analytical, problem-solving, and communication skills.
  • Well organized and detail-oriented.
  • Demonstrated success performing in a team environment.

Responsibilities

  • Coordinate material with future production plans and schedules.
  • Perform analysis and develop information using cross-functional MRP system.
  • Maintain schedules, perform risk analysis, and identify critical/driving paths while developing solutions for deviations.
  • Provide time-phased critical path predictive analysis and actionable planning data to program management.
  • Develop planning artifacts for solicitation response and ensure integration between schedules and program artifacts.
  • Interface with internal and external customers regarding production planning and improvement.

Skills

Analytical thinking
Problem solving
Communication skills
Team player
Detail oriented

Education

Bachelor's degree or equivalent experience

Tools

MS Office
SAP
Oracle

Job description

Lockheed Martin in Washington state is seeking a skilled material planner to coordinate material with future production plans and schedules, using cross-functional MRP systems.

Responsibilities include maintaining schedules, conducting risk analysis, and providing time-phased critical-path insights to program management. You'll develop planning data and solutions to execution conflicts, interfacing with internal/external customers to drive production improvement.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Strategic Material Planner & Scheduling Controller
Strategic Material Planner & Scheduling Controller

Lockheed Martin • Shelton (NE)

On-site
USD 67,000 - 125,000
Medical benefits
Dental benefits
Vision benefits
+11
Strategic Material Planner with Flexible Schedules
Strategic Material Planner with Flexible Schedules

Lehigh Heavy Forge Corporation • Shelton (CT)

On-site
USD 67,000 - 125,000
Medical
Dental
Vision
+11
Manufacturing Planner: MRP/SAP & Materials Flow Lead
Manufacturing Planner: MRP/SAP & Materials Flow Lead

Lockheed Martin • Palmdale (CA)

On-site
USD 82,000 - 151,000
Medical
Dental
401k
+5
MRP & Production Planner
MRP & Production Planner

Lockheed Martin • Lexington (KY)

On-site
USD 54,000 - 100,000
Medical, Dental, Vision
Flexible work arrangements
401(k) match
Strategic Aerospace Manufacturing Planner | 3-Day Weekends
Strategic Aerospace Manufacturing Planner | 3-Day Weekends

Lockheed Martin • Palmdale (CA)

Hybrid
USD 67,000 - 125,000
Medical, Dental, Vision
Flexible work arrangements
401(k) match
+9
Senior Manufacturing Planning & Materials Lead
Senior Manufacturing Planning & Materials Lead

Lockheed Martin • Grand Prairie (TX)

On-site
USD 73,000 - 135,000
Medical
Dental
Vision
+10
Remote Production Control Planner with MRP & SAP
Remote Production Control Planner with MRP & SAP

Lockheed Martin • Palmdale (CA)

On-site
USD 67,000 - 125,000
4x10 work schedule
401(k) match
Paid time off
+1
Manufacturing Planner: MRP & Material Flow
Manufacturing Planner: MRP & Material Flow

Lockheed Martin • Orlando (FL)

On-site
USD 50,000 - 92,000
Medical
Dental
Vision
+11
Senior Manufacturing Planner & Production Control Lead
Senior Manufacturing Planner & Production Control Lead

Lockheed Martin • Palmdale (CA)

On-site
USD 100,000 - 186,000
Medical, Dental, Vision
Flexible work arrangements
401(k) match
+1
Strategic Production Planner – Material Flow & Scheduling
Strategic Production Planner – Material Flow & Scheduling

Engineering Resource Group, Inc. • Ramsey (NJ)

On-site
USD 75,000 - 100,000