Spotter/Laborer - Data Center Construction

Ella SA Contracting

El Paso (TX)

On-site

USD 28,000 - 42,000

Full time

11 days ago

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Ella SA Contracting is seeking a dedicated Spotter/Laborer for data center construction sites. The role involves guiding heavy equipment, assisting with trenching, utility installation, and material handling in outdoor environments while adhering to safety protocols.

The ideal candidate is physically capable, detail-oriented, and committed to working safely in various weather conditions. OSHA 10 or 30, Confined Space Entry, and Traffic Control/Flagging certifications are preferred.

Qualifications

  • High school diploma or GED preferred.
  • Experience in construction or utility work is a plus but not required.
  • Ability to perform physically demanding tasks in various weather conditions.
  • Familiarity with basic construction tools and equipment.

Responsibilities

  • Spotter duties: guide heavy equipment, maintain eye contact, prevent collisions, check for hazards.
  • Site preparation & maintenance: clear debris, trenches, barricades, keep the site organized and hazard-free.
  • Trenching & excavation: manual digging with hand tools and trenching equipment, safe around machinery.
  • Utility installation & repair: assist in laying, aligning, and connecting pipes; support repair of underground systems.
  • Material & equipment handling: load/unload transport tools and materials; store properly.
  • Safety & compliance: follow safety protocols and wear PPE, report potential hazards.

Skills

Physical stamina
Construction tools
Teamwork
Safety procedures

Education

High school diploma or GED

Job description

Position Overview:

We are seeking a dedicated and safety-conscious Spotter/Laborer to support data center construction. This role involves assisting with the installation, maintenance, and repair of essential infrastructure systems, including water, sewer, gas, and telecommunications. The ideal candidate is physically capable, detail-oriented, and committed to working safely in diverse outdoor environments.

Primary Responsibilities:
Spotter Duties
  • Guide heavy equipment and truck operators during backing or tight turns.
  • Maintain clear hand and eye contact with the operator at all times.
  • Prevent collisions with workers, structures, or other vehicles.
  • Check work areas for blind spots and ground hazards.
Site Preparation & Maintenance
  • Clear work areas of debris and prepare trenches and barricades.
  • Maintain a clean, organized, and hazard-free job site.
Trenching & Excavation
  • Perform manual digging using hand tools and trenching equipment.
  • Operate safely around heavy machinery and adhere to trench safety standards.
Utility Installation & Repair
  • Assist in laying, aligning, and connecting utility pipes.
  • Support repair and replacement of damaged underground systems.
Material & Equipment Handling
  • Load, unload, and transport tools, materials, and equipment.
  • Store materials properly to prevent damage or loss.
Safety & Compliance
  • Follow all safety protocols and wear required personal protective equipment (PPE).
  • Identify and report potential hazards to supervisors.
Qualifications:
Education & Experience:
  • High school diploma or GED preferred.
  • Previous experience in construction or utility work is a plus but not required.
Skills & Competencies:
  • Ability to perform physically demanding tasks in various weather conditions.
  • Familiarity with basic construction tools and equipment.
  • Strong teamwork and communication skills.
  • Ability to understand and follow safety procedures and job instructions.
Preferred Certifications:
  • OSHA 10 or 30
  • Confined Space Entry
  • Traffic Control/Flagging
Physical Requirements:
  • Extended periods of standing, bending, and kneeling.
  • Ability to lift up to 50 pounds regularly.
  • Willingness to work in noisy, dusty, and potentially hazardous environments
Work Environment:
  • Outdoor job sites in varying weather conditions.
  • Exposure to heavy machinery, loud noise, and hazardous materials.
Ideal Candidate Profile:

This position is well-suited for individuals who enjoy hands‑on work, thrive in team settings, and prioritize safety and quality in every task.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Spotter/Laborer - Data Center Construction
Spotter/Laborer - Data Center Construction

Ella-Sa-Contracting • El Paso (TX)

On-site
USD 32,000 - 42,000
Spotter/Laborer - Data Center Construction
Spotter/Laborer - Data Center Construction

ELLA Contracting, Lp • El Paso (TX)

On-site
USD 42,981,000 - 63,039,000
Spotter & Laborer: Safe, Hands-On Data Center Site
Spotter & Laborer: Safe, Hands-On Data Center Site

Ella SA Contracting • El Paso (TX)

On-site
USD 28,000 - 42,000
Laborer – Underground Utilities Construction
Laborer – Underground Utilities Construction

ELLA Contracting, Lp • San Antonio (TX)

On-site
USD 21,000 - 30,000
Spotter & Laborer: Safe, Hands-On Utility Construction
Spotter & Laborer: Safe, Hands-On Utility Construction

Ella-Sa-Contracting • El Paso (TX)

On-site
USD 32,000 - 42,000
Laborer – Underground Utilities Construction
Laborer – Underground Utilities Construction

Ella-Sa-Contracting • San Antonio (TX)

On-site
USD 25,000 - 33,000
Data Center Installer
Data Center Installer

Essel • Meridian (MS)

On-site
USD 35,000 - 52,000
Competitive pay
Training provided
Safety-focused environment
Field Spotter & Laborer - Safety-Driven, Hands-On
Field Spotter & Laborer - Safety-Driven, Hands-On

ELLA Contracting, Lp • El Paso (TX)

On-site
USD 42,981,000 - 63,039,000
Underground Laborer
Underground Laborer

Priority Dispatch Corp. • Kingdom City (MO)

On-site
USD 21,000 - 34,000
Field Safety Representative
Field Safety Representative

Five Star Infrastructure Services, dBA InterCon/Five Star Energy Services/M&C Utility • Madison (WI)

On-site
USD 60,000 - 90,000