Spotter/Laborer - Data Center Construction

ELLA Contracting, Lp

El Paso (TX)

Vor Ort

USD 42.981.000 - 63.039.000

Vollzeit

14 Tage+
Bewerbungsgenerator

Eine komplette Bewerbung in einer Minute — maßgeschneiderter Lebenslauf und Anschreiben, fertig zum Versenden.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

ELLA Contracting, Lp in El Paso, TX seeks a dedicated Spotter/Laborer to support data center construction. The role covers installation, maintenance, and repair of essential infrastructure systems with safety as a priority.

The ideal candidate is physically capable, team‑oriented, and able to follow safety protocols in outdoor environments. OSHA 10/30, Confined Space Entry, and Traffic Control/Flagging certifications are a plus, with room for growth in a dynamic job site.

Qualifikationen

  • High school diploma or GED preferred.
  • Prior construction or utility work experience is a plus but not required.
  • Ability to perform physically demanding tasks in various weather conditions.

Aufgaben

  • Spotter duties: Guide heavy equipment and ensure clear contact with operators.
  • Site preparation & maintenance: Clear debris, prepare trenches and barricades, keep site hazard-free.
  • Trenching & excavation: Manual digging with hand tools and trenching equipment, maintain safety around machinery.
  • Utility installation & repair: Assist in laying, aligning and connecting pipes; support damage repairs.
  • Material & equipment handling: Load/unload, transport tools and materials; store properly.
  • Safety & compliance: Follow PPE requirements and report hazards to supervisors.

Kenntnisse

Teamwork
Communication
Physical fitness
Safety procedures

Ausbildung

High school diploma or GED

Tools

Basic construction tools

Jobbeschreibung

Position Overview

We are seeking a dedicated and safety-conscious Spotter/Laborer to support data center construction. This role involves assisting with the installation, maintenance, and repair of essential infrastructure systems, including water, sewer, gas, and telecommunications. The ideal candidate is physically capable, detail-oriented, and committed to working safely in diverse outdoor environments.

Primary Responsibilities
Spotter Duties
  • Guide heavy equipment and truck operators during backing or tight turns.
  • Maintain clear hand and eye contact with the operator at all times.
  • Prevent collisions with workers, structures, or other vehicles.
  • Check work areas for blind spots and ground hazards.
Site Preparation & Maintenance
  • Clear work areas of debris and prepare trenches and barricades.
  • Maintain a clean, organized, and hazard-free job site.
Trenching & Excavation
  • Perform manual digging using hand tools and trenching equipment.
  • Operate safely around heavy machinery and adhere to trench safety standards.
Utility Installation & Repair
  • Assist in laying, aligning, and connecting utility pipes.
  • Support repair and replacement of damaged underground systems.
Material & Equipment Handling
  • Load, unload, and transport tools, materials, and equipment.
  • Store materials properly to prevent damage or loss.
Safety & Compliance
  • Follow all safety protocols and wear required personal protective equipment (PPE).
  • Identify and report potential hazards to supervisors.
Qualifications
Education & Experience
  • High school diploma or GED preferred.
  • Previous experience in construction or utility work is a plus but not required.
Skills & Competencies
  • Ability to perform physically demanding tasks in various weather conditions.
  • Familiarity with basic construction tools and equipment.
  • Strong teamwork and communication skills.
  • Ability to understand and follow safety procedures and job instructions.
Preferred Certifications
  • OSHA 10 or 30
  • Confined Space Entry
  • Traffic Control/Flagging
Physical Requirements
  • Extended periods of standing, bending, and kneeling.
  • Ability to lift up to 50 pounds regularly.
  • Willingness to work in noisy, dusty, and potentially hazardous environments
Work Environment
  • Outdoor job sites in varying weather conditions.
  • Exposure to heavy machinery, loud noise, and hazardous materials.
Ideal Candidate Profile
  • This position is well-suited for individuals who enjoy hands‑on work, thrive in team settings, and prioritize safety and quality in every task.
Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Laborer – Underground Utilities Construction
Laborer – Underground Utilities Construction

Ella-Sa-Contracting • San Antonio (TX)

Vor Ort
USD 25.000 - 33.000
Laborer – Underground Utilities Construction
Laborer – Underground Utilities Construction

ELLA Contracting, Lp • San Antonio (TX)

Vor Ort
USD 32.000 - 46.000
Field Spotter & Laborer - Safety-Driven, Hands-On
Field Spotter & Laborer - Safety-Driven, Hands-On

ELLA Contracting, Lp • El Paso (TX)

Vor Ort
USD 42.981.000 - 63.039.000
Data Center Installer
Data Center Installer

Essel • Meridian (MS)

Vor Ort
USD 35.000 - 52.000
Competitive pay
Training provided
Safety-focused environment
Spotter - (Duke)
Spotter - (Duke)

Pike Corporation • Charlotte (NC)

Vor Ort
USD 35.000 - 45.000
Construction Laborer/Spotters
Construction Laborer/Spotters

Saulsbury • Town of Texas (WI)

Vor Ort
USD 36.000 - 54.000
Construction Cleaner (Datacenters)
Construction Cleaner (Datacenters)

TalentPartners • Missouri

Vor Ort
USD 19.286.000 - 24.797.000
Safety Coordinator
Safety Coordinator

FootBridge • USA

Vor Ort
USD 34.440 - 44.083
$68/day per diem for meals and incidentals
Shared corporate housing provided
High potential for contract extension
Laborer - Tier 1
Laborer - Tier 1

ADP, Inc. • Columbus (OH), Louisville (OH)

Vor Ort
USD 28.000 - 33.000
Construction Laborer
Construction Laborer

Luck Grove Telecom Inc • Billings (MT)

Vor Ort
USD 28.000 - 34.000