Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.
Senior CSA Superintendent position in Austin, TX for a client in the advanced manufacturing sector. You will lead civil, structural, and architectural construction on large-scale projects, coordinating with engineering and project controls to drive schedules and ensure quality and safety on site.
Requirements include 12+ years of construction experience (5+ years as Superintendent on industrial projects), design-build delivery, OSHA 30, and ability to read civil/structural drawings.
Senior CSA Superintendent position in Austin, TX for a client in the advanced manufacturing sector. You will lead civil, structural, and architectural construction on large-scale projects, coordinating with engineering and project controls to drive schedules and ensure quality and safety on site.
Requirements include 12+ years of construction experience (5+ years as Superintendent on industrial projects), design-build delivery, OSHA 30, and ability to read civil/structural drawings.