Senior IMS Lead: Onsite Critical Path & Risk Scheduling

ARA

Indian Head (MD)

On-site

USD 135,000 - 150,000

Full time

10 days ago

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Applied Research Associates, Inc. seeks a Senior Integrated Master Scheduler to create and maintain a master schedule spanning technical, schedule, cost, and risk activities for the program.

The role is onsite at a high-activity facility and requires US citizenship with resides in the US. Candidates must have a degree in engineering (8–10 years) or a master’s degree (6–8 years) and be familiar with Oracle Primavera.

Qualifications

  • Bachelor’s degree in engineering with 8–10 years of related experience or Master’s degree with 6–8 years of related experience.
  • Familiarity and/or working experience using Oracle Primavera.
  • Ability to work effectively in high-pressure, dynamic environments, managing rapid changes in program scope, funding, and priorities.
  • Strong written and oral communication skills, with the ability to tailor presentations and reports to diverse technical and non-technical audiences.
  • Ability to undergo and pass a Department of Transportation compliant medical physical exam.
  • Ability to undergo and pass a drug screening.

Responsibilities

  • Consolidate inputs from contractors, internal teams, and program offices to generate an overall IMS.
  • Develop a Risk Management Plan and incorporate program risks into the schedule for mitigation purposes.
  • Conduct critical path analysis and provide schedule performance reports to senior management.
  • Collaborate with project managers, department heads, and stakeholders to ensure alignment of schedules and resources.
  • Prepare project documentation, PowerPoint presentations, and inputs for Program Management Reviews.

Skills

Project management
Critical path analysis
Schedule reporting
Stakeholder collaboration
Technical communication

Education

Bachelor’s degree in engineering
Master’s degree in engineering

Tools

Oracle Primavera

Job description

Applied Research Associates, Inc. seeks a Senior Integrated Master Scheduler to create and maintain a master schedule spanning technical, schedule, cost, and risk activities for the program.

The role is onsite at a high-activity facility and requires US citizenship with resides in the US. Candidates must have a degree in engineering (8–10 years) or a master’s degree (6–8 years) and be familiar with Oracle Primavera.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Senior Integrated Master Scheduler
Senior Integrated Master Scheduler

ARA • Indian Head (MD)

On-site
USD 135,000 - 150,000
Senior Program Scheduler for Mission-Critical Programs
Senior Program Scheduler for Mission-Critical Programs

Intra Management Solutions, Inc. • Denver (CO)

On-site
USD 70,000 - 90,000
Senior Program Scheduler — IMS Master Plan Expert
Senior Program Scheduler — IMS Master Plan Expert

Raytheon • Tewksbury (MA)

On-site
USD 87,000 - 165,000
Benefits package
Equal Opportunity Employer
Senior IMS Scheduler - Secret Clearance (Onsite)
Senior IMS Scheduler - Secret Clearance (Onsite)

Raytheon • Woburn (MA)

On-site
USD 87,000 - 165,000
Medical
Dental
Vision
+10
Senior IMS Lead - Program Planning & Schedule Risk
Senior IMS Lead - Program Planning & Schedule Risk

Raytheon • Tucson (AZ)

On-site
USD 107,000 - 205,000
Relocation assistance
Medical, dental, vision benefits
401(k) match
Senior IMS Scheduler | Remote Federal Schedule Mastery
Senior IMS Scheduler | Remote Federal Schedule Mastery

A3 Consulting, LLC • Abbeyville (CO)

On-site
USD 135,000 - 150,000
Medical, Dental, Vision
401k match
Paid time off
+1
Senior IMS Scheduling Lead - Risk & Analysis Expert
Senior IMS Scheduling Lead - Risk & Analysis Expert

Sierra Space • Centennial (CO)

On-site
USD 116,000 - 161,000
Medical, dental, and vision plans
401(k) with 150% match up to 6%
Three weeks paid time off
Space Program IMS Lead & Risk Analyst
Space Program IMS Lead & Risk Analyst

Amentum • Arlington (VA)

On-site
USD 120,000 - 140,000
Health insurance
401(k) matching
Paid time off
Onsite IMS Master Planner – Integrated Scheduling Leader
Onsite IMS Master Planner – Integrated Scheduling Leader

Boeing • Albuquerque (NM)

On-site
USD 118,000 - 171,000
Senior Program Scheduler - IMS & Risk Lead
Senior Program Scheduler - IMS & Risk Lead

Teledyne Brown Engineering • Huntsville (AL)

On-site
USD 100,000 - 150,000