Senior HV QA/QC Inspector – Data Center Construction

Iren Group

Sweetwater (TX)

Sur place

USD 76 000 - 90 000

Plein temps

Il y a 7 jours
Soyez parmi les premiers à postuler

Obtenez une réponse de cet employeur

Votre CV et votre lettre de motivation, adaptés exactement à ce que l’employeur recherche.

Passez les filtres ATS

Avantages offerts par ce poste

Health insurance
Disability insurance
401(k) match
Paid time off
Professional development

Résumé du poste

IREN Group in Sweetwater, TX is seeking a Construction High Voltage QA/QC Inspector. You will verify HV substations and distribution systems, perform QA/QC inspections, and coordinate turnover to 24/7 operations with field teams and contractors. This onsite role demands safety focus and detailed documentation.

Responsibilities include witnessing tests, reviewing ITPs, and ensuring compliance with NEC/NESC, IFC drawings, and project quality plans. Rotation schedule and on-site work are required.

Qualifications

  • Must have high school diploma or equivalent.
  • Minimum 5 years HV construction experience.
  • Journeyman or Master Electrician license preferred.
  • OSHA 30, NFPA 70E or HV safety training preferred.
  • Ability to read IFC drawings, test reports and wiring diagrams.

Responsabilités

  • Perform QA/QC inspections for HV construction activities.
  • Verify installations comply with IFC drawings and standards.
  • Witness and document electrical testing activities.
  • Review ITPs, procedures and hold points.
  • Generate punch lists and track closure to turnover.
  • Maintain QA/QC documentation and turnover packages.
  • Coordinate with utilities and third-party testers.
  • Provide field guidance to improve workmanship.
  • Ensure compliance with safety policies and OSHA requirements.

Connaissances

QA/QC inspections
Read IFC drawings
Electrical testing
Documentation
Communication

Formation

High school diploma

Description du poste

IREN Group in Sweetwater, TX is seeking a Construction High Voltage QA/QC Inspector. You will verify HV substations and distribution systems, perform QA/QC inspections, and coordinate turnover to 24/7 operations with field teams and contractors. This onsite role demands safety focus and detailed documentation.

Responsibilities include witnessing tests, reviewing ITPs, and ensuring compliance with NEC/NESC, IFC drawings, and project quality plans. Rotation schedule and on-site work are required.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Onsite Electrical QA/QC Technician - Data Center Builds
Onsite Electrical QA/QC Technician - Data Center Builds

Iren Group • Sweetwater (TX)

Sur place
USD 67 000 - 96 000
Health insurance
401(k) retirement plan with company 1%
Paid time off
+2
Lead HV Construction Supervisor - Data Center, 24/7 Power
Lead HV Construction Supervisor - Data Center, 24/7 Power

Iren Group • Sweetwater (TX)

Sur place
USD 165 312 000 - 179 088 000
Health Insurance
401(k) match
Paid PTO
Electrical QA/QC Technician — Data Center Construction
Electrical QA/QC Technician — Data Center Construction

Iris Energy • Sweetwater (TX)

Sur place
USD 72 000 - 91 000
Health insurance
Disability insurance
401(k) with company match
+1
HV Substation Technician — Data Center Reliability
HV Substation Technician — Data Center Reliability

Iris Energy • Childress (TX)

Sur place
USD 85 000 - 120 000
Health insurance
401(k) plan with match
Paid PTO & holidays
+1
Construction High Voltage (HV) QA/QC Inspector
Construction High Voltage (HV) QA/QC Inspector

Iren Group • Sweetwater (TX)

Sur place
USD 76 000 - 90 000
Health insurance
Disability insurance
401(k) match
+2
Senior Mechanical QA/QC Lead for Data Center Cooling
Senior Mechanical QA/QC Lead for Data Center Cooling

Iren Group • Sweetwater (TX)

Sur place
USD 96 000 - 103 000
Health & wellness benefits
401(k) with company match
Paid professional development
+2
Data Center QA/QC Manager – Onsite Electrical Quality
Data Center QA/QC Manager – Onsite Electrical Quality

Ies Co • Pecos (TX)

Hybride
USD 75 000 - 120 000
401(k) plan
Health insurance
Disability insurance
+3
Construction Electrical QA/QC Technician
Construction Electrical QA/QC Technician

Iren Group • Sweetwater (TX)

Sur place
USD 67 000 - 96 000
Health insurance
401(k) retirement plan with company 1%
Paid time off
+2
Data Center QA/QC Lead – Electrical Systems
Data Center QA/QC Lead – Electrical Systems

IES Holdings • Pecos (TX)

Sur place
USD 90 000 - 120 000
401(k) Retirement Plan with company
flexible medical-dental-vision
short-term/long-term disability
+3
Electrical Construction Supervisor Onsite Data Center
Electrical Construction Supervisor Onsite Data Center

Iren Group • Sweetwater (TX)

Sur place
USD 69 000 - 94 000
Health insurance
Disability insurance
401(k) with company match
+1