Senior CSA Superintendent - Data Center Construction

Hut 8

Corpus Christi (TX)

On-site

USD 120,000 - 180,000

Full time

6 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Medical, dental, vision insurance
Paid time off
Disability insurance

Job summary

Hut 8 seeks an experienced Superintendent, CSA to lead civil, structural, and architectural field execution for a new data center build. You will own day-to-day site operations, drive schedule, coordinate trades, and enforce safety and quality through mobilization to turnover.

Responsibilities include supervising earthwork, foundations, structural erection, and building envelope, while ensuring alignment with MEP milestones.

Qualifications

  • 7+ years of field supervision on heavy civil, structural concrete, or large industrial projects; data center/mission-critical experience preferred.
  • Deep knowledge of earthwork operations, foundation systems, concrete placement, tilt-wall/precast erection, and structural steel QA/QC requirements.
  • Proven ability to sequence sitework and vertical construction to protect downstream milestones.
  • Strong command of three-week look-ahead planning, manpower review, and subcontractor coordination.
  • Safety leadership on high-risk CSA work: excavation, cranes, and work at height; OSHA 30 preferred.
  • Quality discipline on embeds, anchor bolts, and tolerances affecting steel/equipment landings.
  • Experience with construction management platforms and full drawing packages (Procore/ACC).
  • Clear daily reporting and documentation habits.

Responsibilities

  • Oversee civil, structural, and architectural field execution for a new data center build.
  • Drive schedule, coordinate trades, and enforce safety and quality from mobilization through turnover.
  • Supervise mass grading, utilities, and site improvements; manage QA/QC and inspection points.
  • Lead deep/shallow foundations, tilt-wall/precast erection, and structural steel activities.
  • Drive building envelope, roofing, doors and hardware, and interior finishes in coordination with MEP milestones.
  • Own three-week look-ahead planning and resolve constraints with CSA subs.
  • Maintain daily reports, progress quantities, and issue RFIs with project engineers.

Skills

Field supervision
Earthwork operations
Foundations & concrete placement
QA/QC
Three-week look-ahead planning
Subcontractor coordination
Safety leadership

Tools

Procore
ACC

Job description

Hut 8 seeks an experienced Superintendent, CSA to lead civil, structural, and architectural field execution for a new data center build. You will own day-to-day site operations, drive schedule, coordinate trades, and enforce safety and quality through mobilization to turnover.

Responsibilities include supervising earthwork, foundations, structural erection, and building envelope, while ensuring alignment with MEP milestones.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Lead Data Center CSA Construction Superintendent
Lead Data Center CSA Construction Superintendent

Socket.dev • Corpus Christi (TX)

On-site
USD 120,000 - 180,000
Medical, dental, vision insurance
Paid time off
Disability insurance
Lead CSA Superintendent — Data Center Construction
Lead CSA Superintendent — Data Center Construction

Hut 8 Corp. • Corpus Christi (TX), Northern (KY)

Hybrid
USD 120,000 - 180,000
Medical insurance
Dental insurance
Vision insurance
+2
Senior MEP Superintendent - Data Center Construction
Senior MEP Superintendent - Data Center Construction

Hut 8 • St. Francisville (LA)

On-site
USD 110,000 - 170,000
Medical insurance
Dental insurance
Vision insurance
+1
Senior MEP Superintendent, Data Center Build
Senior MEP Superintendent, Data Center Build

Socket.dev • St. Francisville (LA)

On-site
USD 90,000 - 130,000
Medical insurance
Dental insurance
Vision insurance
+3
CSA Lead - Data Center Civil/Structural Architect
CSA Lead - Data Center Civil/Structural Architect

Huxley • Austin (TX)

On-site
USD 120,000 - 170,000
Medical, dental, and vision coverage
Paid leave where required by law
Senior HV Substation Lead – Data Center Build
Senior HV Substation Lead – Data Center Build

Hut 8 • St. Francisville (LA)

On-site
USD 120,000 - 180,000
Medical benefits
Dental benefits
Vision benefits
+3
Superintendent, CSA Corpus Christi, TX
Superintendent, CSA Corpus Christi, TX

Hut 8 Corp. • Corpus Christi (TX), Northern (KY)

Hybrid
USD 120,000 - 180,000
Medical insurance
Dental insurance
Vision insurance
+2
Superintendent, CSA
Superintendent, CSA

Socket.dev • Corpus Christi (TX)

On-site
USD 120,000 - 180,000
Medical, dental, vision insurance
Paid time off
Disability insurance
Senior Mechanical Superintendent – Data Center Build
Senior Mechanical Superintendent – Data Center Build

Hut 8 Corp. • Corpus Christi (TX), Northern (KY)

Hybrid
USD 90,000 - 120,000
Senior CSA Construction Manager – Civil/Structural
Senior CSA Construction Manager – Civil/Structural

Fleet Data Centers • Sparks (NV)

On-site
USD 175,000 - 215,000