Senior MEP Superintendent - Data Center Construction

Hut 8

St. Francisville (LA)

On-site

USD 110,000 - 170,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Benefits offered by this job

Medical insurance
Dental insurance
Vision insurance
Paid time off

Job summary

Hut 8 seeks an experienced Superintendent, MEP to lead field execution for a new data center build in a high-stakes environment. You will own day-to-day site operations, coordinate trades, and enforce safety and quality from mobilization through turnover.

You will supervise MV/LV distribution, standby generation, UPS, and cooling plants, while driving Level 1-5 commissioning prerequisites and timely turnover documentation.

Qualifications

  • 7+ years supervising electrical and/or mechanical trades on data center, semiconductor, hospital, or heavy industrial projects; mission-critical strongly preferred.
  • Working knowledge of MV/LV power distribution, standby generation, UPS systems, and hydronic/liquid cooling plants, including testing and energization practices.
  • Experience driving Level 1-5 commissioning prerequisites and turnover documentation inside a live Cx program.
  • Strong trade-sequencing instincts in congested, schedule-critical space; fluent in look-ahead planning and manpower loading.
  • Safety leadership including NFPA 70E, LOTO, and energized-facility transitions; OSHA 30 preferred.
  • Pipe cleanliness, flushing, and pressure-test discipline for critical hydronic systems.
  • Comfortable with Procore/ACC, BIM field use, and full MEP drawing packages.
  • Clear documentation habits: dailies, QC records, and test documentation.

Responsibilities

  • Oversee field execution for MEP on a new data center build, owning day-to-day site operations.
  • Drive trade sequencing and BIM-supported field coordination to resolve clashes before installation.
  • Manage commissioning handoff and prerequisites supporting Level 1-5 commissioning milestones.
  • Enforce NFPA 70E safety controls, LOTO, energized-work permits, and quality standards on site.
  • Maintain look-ahead planning, RFIs, field issue closure, and up-to-date as-builts and test records.

Skills

MEP supervision
Electrical/Mechanical trades
Power distribution MV/LV
Standby generation
UPS systems
Hydronic cooling
Commissioning prerequisites
Trade sequencing
NFPA 70E safety
Procore
BIM field use
Documentation (dailies, QC)

Tools

Procore
BIM

Job description

Hut 8 seeks an experienced Superintendent, MEP to lead field execution for a new data center build in a high-stakes environment. You will own day-to-day site operations, coordinate trades, and enforce safety and quality from mobilization through turnover.

You will supervise MV/LV distribution, standby generation, UPS, and cooling plants, while driving Level 1-5 commissioning prerequisites and timely turnover documentation.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Lead MEP Superintendent — Data Center Build
Lead MEP Superintendent — Data Center Build

Hut 8 Corp. • Louisiana (MO), Northern (KY)

Hybrid
USD 90,000 - 130,000
Medical insurance
Dental insurance
Vision insurance
+3
Senior MEP Superintendent — Data Center Build, Equity & PTO
Senior MEP Superintendent — Data Center Build, Equity & PTO

Giga Energy • Houston (TX)

On-site
USD 110,000 - 170,000
Health insurance
Equity
401(k) with employer match
+5
Senior HV Substation Lead – Data Center Build
Senior HV Substation Lead – Data Center Build

Hut 8 • St. Francisville (LA)

On-site
USD 120,000 - 180,000
Medical benefits
Dental benefits
Vision benefits
+3
Senior MEP Superintendent - Data Center Builds
Senior MEP Superintendent - Data Center Builds

Hourigan-Construction • Richmond (VA)

On-site
USD 110,000 - 160,000
Medical
Dental
Vision
+5
HV Substation Field Superintendent – Data Center Build
HV Substation Field Superintendent – Data Center Build

Hut 8 Corp. • Louisiana (MO), Northern (KY)

Hybrid
USD 150,000 - 210,000
Medical insurance
Dental insurance
Vision insurance
+3
Senior MEP Superintendent - Mission-Critical Data Center
Senior MEP Superintendent - Mission-Critical Data Center

Blue Signal Search • Lubbock (TX)

On-site
USD 140,000 - 180,000
Lead Data Center MEP Superintendent
Lead Data Center MEP Superintendent

Hourigan-Construction • Richmond (VA)

On-site
USD 90,000 - 130,000
Medical insurance
Dental insurance
Vision insurance
+3
MEP Superintendent
MEP Superintendent

Scott Humphrey Corporation • Missouri

On-site
USD 85,000 - 120,000
Senior MEP Superintendent, Data Centers — Midwest Travel
Senior MEP Superintendent, Data Centers — Midwest Travel

LVI Associates • Lansing (MI)

On-site
USD 158,000 - 193,000
Base salary up to $175,000
Annual performance bonus
Vehicle allowance or company vehicle
+5
Senior High-Voltage Substation Superintendent
Senior High-Voltage Substation Superintendent

Hut8 • St. Francisville (LA)

On-site
USD 120,000 - 180,000
Medical, Dental, Vision benefits
Life Insurance
Disability Insurance
+1