Senior BESS Electrical Design Engineer – Grid-Ready Storage

Redwood Materials

Reno (NV)

On-site

USD 120,000 - 160,000

Full time

2 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Redwood Materials seeks a Battery Energy Storage Systems (BESS) Electrical Engineer to lead utility-scale BESS design for EPC projects. You will size layouts, interface with utilities, and ensure compliance with NEC 705/706, IEEE 1547, UL 9540 and NFPA 855, while coordinating with cross-disciplinary teams.

The role demands 5+ years in solar/energy storage, with 3+ years focused on BESS design, and a Nevada PE license or eligibility with rapid licensure plans.

Qualifications

  • Bachelor’s or Master’s degree in Electrical Engineering from ABET-accredited program.
  • Licensed Professional Engineer in Nevada or eligible for reciprocity; must obtain Nevada PE and SC reciprocity within 2 months.
  • Minimum 5 years in solar, energy storage, or microgrid sectors with at least 3 years in BESS design/deployment.
  • Proven interconnection and regulatory compliance expertise for BESS systems.
  • SME in NEC 705, NEC 706, IEEE 1547, UL 9540, NFPA 855; strong modeling/analysis experience.

Responsibilities

  • Lead electrical engineering efforts for utility-scale BESS projects from concept to construction.
  • Interface with utilities/ISO/RTOs for interconnection studies, permitting, and compliance.
  • Serve as SME for BESS technical challenges; design AC/DC systems and specify long-lead equipment.
  • Develop schematics, single-line diagrams, wiring, grounding, protection strategies.
  • Coordinate with civil/structural/SCADA/geo tech teams to produce IFC packages and specs.
  • Lead R&D on MV DC distribution for BESS integration; provide project cost estimates and QA/QC.

Skills

Strong communication
Project leadership
Analytical thinking
Detail oriented

Education

ABET-accredited Electrical Eng. degree
Professional Engineer license (Nevada)

Tools

ETAP
SKM
HOMER
PSSE
PSLF
PSCAD
SEL AcSELerator

Job description

Redwood Materials seeks a Battery Energy Storage Systems (BESS) Electrical Engineer to lead utility-scale BESS design for EPC projects. You will size layouts, interface with utilities, and ensure compliance with NEC 705/706, IEEE 1547, UL 9540 and NFPA 855, while coordinating with cross-disciplinary teams.

The role demands 5+ years in solar/energy storage, with 3+ years focused on BESS design, and a Nevada PE license or eligibility with rapid licensure plans.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Senior BESS Electrical Design Engineer – Utility-Scale
Senior BESS Electrical Design Engineer – Utility-Scale

Redwood Materials • San Jose (CA)

On-site
USD 120,000 - 160,000
Senior BESS Electrical Design Engineer — Utility-Scale
Senior BESS Electrical Design Engineer — Utility-Scale

Redwood Materials • Carson City (NV)

On-site
USD 120,000 - 160,000
Senior BESS Electrical Design Engineer (Utility-Scale)
Senior BESS Electrical Design Engineer (Utility-Scale)

Redwood Materials • Nevada (IA)

On-site
USD 120,000 - 190,000
Senior BESS Electrical Design Engineer – Utility-Scale
Senior BESS Electrical Design Engineer – Utility-Scale

Redwood Materials • Sparks (NV)

On-site
USD 120,000 - 190,000
Senior BESS Electrical Design Engineer – Grid-Scale Storage
Senior BESS Electrical Design Engineer – Grid-Scale Storage

Gilder Search Group • Sparks (NV)

On-site
USD 150,000 - 195,000
Lead BESS Electrical Engineer - Grid-Scale Storage
Lead BESS Electrical Engineer - Grid-Scale Storage

Redwood Materials • Oakland (CA)

On-site
USD 140,000 - 190,000
Lead BESS Electrical Design Engineer – Grid-Scale Storage
Lead BESS Electrical Design Engineer – Grid-Scale Storage

NextGenEnergyJobs • San Francisco (CA)

On-site
USD 140,000 - 210,000
Staff BESS Electrical Design Engineer, EPC
Staff BESS Electrical Design Engineer, EPC

NextGenEnergyJobs • San Francisco (CA)

On-site
USD 140,000 - 210,000
Lead Electrical Engineer, Grid-Scale Energy Storage
Lead Electrical Engineer, Grid-Scale Energy Storage

Redwood Materials Inc. • San Francisco (CA), Northern (KY)

Hybrid
USD 190,000 - 252,000
Lead BESS Electrical Design Engineer — Grid-Scale Storage
Lead BESS Electrical Design Engineer — Grid-Scale Storage

MiconeStaffing • Carson City (NV)

On-site
USD 150,000 - 195,000