Senior Battery Storage EPC Design Lead

Redwood Materials Inc.

Reno (NV)

On-site

USD 120,000 - 180,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Redwood Materials is seeking a Senior Battery Energy Storage Design Manager within the EPC team to own and drive the full design and engineering efforts for BESS infrastructure from concept to production. The role demands expertise in electrical, construction, and project management, with a track record of coordinating multi-disciplinary teams in fast-paced programs.

The ideal candidate holds a degree in electrical engineering and has EPC or multi‑disciplinary design experience, with a passion

Qualifications

  • Deep understanding of grid-scale energy storage technologies and balance-of-plant equipment such as inverters, transformers, switchgear, HVAC, fire suppression.
  • Strong knowledge of electrical system design, interconnection requirements, and utility-scale project execution.
  • Knowledge of battery systems, electrical protection, power conversion, medium and high voltage systems, communications and control systems.
  • Familiarity with relevant standards and codes (UL 9540/1973/1741, IEEE, NEC, NFPA, IEC).
  • Bachelor’s degree in Electrical Engineering; PE or RA license preferred.

Responsibilities

  • Manage greenfield and brownfield infrastructure projects from concept through IFC and construction.
  • Coordinate internal and external stakeholders and maintain clear communications across teams.
  • Oversee permitting and construction document flow.
  • Own design funding and scheduling for assigned projects.
  • Coordinate with procurement and construction partners to meet overall project schedules.
  • Identify resource gaps and align cross-functional teams.
  • Apply lean construction and BIM in integrated design across disciplines.
  • Support feasibility studies, value engineering, and option analyses.

Skills

Grid-scale storage
Balance-of-plant
Electrical design
Interconnection
Utility-scale
Battery systems
Electrical protection
Power conversion
Medium/high voltage
Control systems
Project management
EPC experience
Communication skills
Regulatory knowledge

Education

B.S. Electrical Engineering
PE or RA license preferred

Tools

BIM
Electrical design tools

Job description

Redwood Materials is seeking a Senior Battery Energy Storage Design Manager within the EPC team to own and drive the full design and engineering efforts for BESS infrastructure from concept to production. The role demands expertise in electrical, construction, and project management, with a track record of coordinating multi-disciplinary teams in fast-paced programs.

The ideal candidate holds a degree in electrical engineering and has EPC or multi‑disciplinary design experience, with a passion

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Battery Energy Storage Design Lead - EPC
Senior Battery Energy Storage Design Lead - EPC

Redwood Materials • Reno (NV)

On-site
USD 170,000 - 210,000
Senior Design Manager — Grid-Scale Energy Storage
Senior Design Manager — Grid-Scale Energy Storage

Redwood Materials, Inc. • San Francisco (CA)

On-site
USD 132,500 - 175,000
Senior BESS Project Engineer: End-to-End Delivery
Senior BESS Project Engineer: End-to-End Delivery

Redwood Materials • San Francisco (CA)

On-site
USD 160,000 - 252,000
Senior Battery Energy Storage Design Manager, EPC
Senior Battery Energy Storage Design Manager, EPC

Redwood Materials • Reno (NV)

On-site
USD 170,000 - 210,000
Senior Battery Energy Storage Design Manager, EPC
Senior Battery Energy Storage Design Manager, EPC

Redwood Materials Inc. • Reno (NV)

On-site
USD 120,000 - 180,000
BESS Program Lead — End-to-End Energy Storage
BESS Program Lead — End-to-End Energy Storage

Redwood Materials Inc. • San Francisco (CA)

Hybrid
USD 160,000 - 252,000
Senior BESS Electrical Design Engineer – Utility-Scale
Senior BESS Electrical Design Engineer – Utility-Scale

Redwood Materials • San Jose (CA)

On-site
USD 120,000 - 160,000
Senior Energy Storage Engineer – Remote BESS Design Lead
Senior Energy Storage Engineer – Remote BESS Design Lead

SB Energy • Redwood City (CA)

On-site
USD 100,000 - 140,000
Medical, Dental & Vision (company-paid
401(k) with company match
Paid time off & holidays
+2
Staff BESS Electrical Engineer - Utility-Scale
Staff BESS Electrical Engineer - Utility-Scale

Redwood Materials Inc. • San Francisco (CA)

On-site
USD 190,000 - 252,500
Electrical Design Lead for Battery Storage (BESS)
Electrical Design Lead for Battery Storage (BESS)

Black & Veatch • Overland Park (KS)

On-site
USD 156,000 - 261,000