Duration: 30 months contract
Job Description
Position Summary
The P6 Scheduler is dedicated to the JKS2 Natural Gas Conversion Project and provides end-to-end scheduling and project-controls support to the Lead Project Manager. The role develops, maintains, analyzes, and communicates the integrated Primavera P6 schedule across engineering, procurement, permitting, outage planning, construction, commissioning, testing, and project closeout. The P6 Scheduler establishes the schedule framework, integrates contractor and stakeholder inputs, validates logic and progress, identifies critical and near-critical work, evaluates schedule risk and recovery options, and produces reliable forecasts and reporting for project leadership. This position serves as the central scheduling resource for the gas conversion project, ensuring schedule information is accurate, traceable, aligned with approved scope and execution strategy, and suitable for timely decision-making throughout the project lifecycle.
Tasks & Responsibilities
- Develop, maintain, and control the resource- and logic-loaded integrated master schedule in Oracle Primavera P6 for all phases of the JKS2 Natural Gas Conversion Project.
- Support the Lead Project Manager in translating the approved project scope, execution strategy, contract requirements, outage windows, regulatory commitments, and turnover plan into a complete scheduling framework and measurable baseline.
- Create and maintain the work breakdown structure, activity coding, calendars, milestones, constraints, sequencing logic, responsibility assignments, and schedule-level standards required for consistent project controls.
- Coordinate schedule inputs from engineering, procurement, construction, operations, maintenance, environmental, regulatory, safety, transmission, gas solutions, consultants, original equipment manufacturers, and contractors.
- Integrate contractor schedules and specialty-vendor plans into the project master schedule; verify that deliverables, interfaces, assumptions, calendars, logic, and milestones align with project requirements.
- Facilitate schedule-development sessions, planning workshops, pull-planning meetings, progress reviews, look-ahead meetings, outage coordination sessions, and schedule-risk discussions.
- Establish and maintain the approved schedule baseline and document authorized changes in accordance with project change-control and governance requirements.
- Perform routine schedule updates by collecting status, validating actual dates, assessing remaining durations, confirming forecasts, and reconciling progress with field conditions and responsible stakeholders.
- Apply sound critical path method scheduling practices; identify critical and near-critical paths, float erosion, open ends, out-of-sequence progress, excessive constraints, negative float, lag concerns, and other schedule-quality issues.
- Analyze schedule performance and trends, including milestone variance, total float movement, activity slippage, schedule compression, productivity impacts, and forecast changes; clearly communicate causes, consequences, and decision points to the Lead Project Manager.
- Develop schedule scenarios and what-if analyses to evaluate alternatives, construction sequencing, outage interfaces, acceleration opportunities, recovery plans, and the timing effects of scope or execution changes.
- Prepare and maintain near-term look-ahead schedules for engineering deliverables, procurement activities, site mobilization, construction work fronts, tie-ins, outages, commissioning, testing, and turnover activities.
- Coordinate schedule interfaces for site access, enabling work, temporary facilities, material delivery, system outages, gas infrastructure, electrical and controls modifications, inspections, startup, performance testing, and commercial or operational readiness milestones.
- Review engineering and procurement status to ensure drawings, specifications, vendor data, long-lead equipment, submittals, approvals, fabrication, delivery, and material-availability dates support the construction sequence.
- Support time-impact analyses and evaluation of contractor schedule submissions, change requests, delay notifications, and recovery proposals; maintain clear schedule records and contemporaneous documentation for project management review.
- Develop schedule narratives, milestone reports, critical-path summaries, progress curves, variance analyses, dashboards, and executive-level graphics for weekly, monthly, and oversight-committee reporting.
- Reconcile schedule progress with cost, risk, change, procurement, construction, and commissioning information so project forecasts remain aligned across project-control disciplines.
- Track schedule-related risks, assumptions, dependencies, constraints, and required decisions; provide timely notice when emerging issues may affect key milestones or project completion.
- Maintain schedule files, update records, basis documents, coding dictionaries, calendars, layouts, reports, narratives, and supporting documentation in the designated project repository with appropriate version control.
- Perform schedule quality reviews and periodic health checks using project standards and recognized industry practices; recommend corrective actions and follow through to resolution.
- Provide accurate scheduling data for leadership briefings, contractor performance discussions, project reviews, regulatory or governance updates, and other project communications directed by the Lead Project Manager.
- Support field verification and site coordination as needed to validate actual progress, remaining work, access constraints, work-front readiness, and the reasonableness of contractor forecasts.
- Coordinate commissioning and turnover sequencing by system, subsystem, or area, ensuring construction completion, testing, documentation, training, operating readiness, and final acceptance activities are logically integrated.
- Support project closeout by confirming final actual dates, resolving remaining schedule exceptions, archiving the final schedule history, and documenting lessons learned and schedule-performance outcomes.
- Perform additional project scheduling and project-controls duties as assigned in support of the JKS2 Natural Gas Conversion Project.
Duration: 30 months contract
Job Description
Position Summary
The P6 Scheduler is dedicated to the JKS2 Natural Gas Conversion Project and provides end-to-end scheduling and project-controls support to the Lead Project Manager. The role develops, maintains, analyzes, and communicates the integrated Primavera P6 schedule across engineering, procurement, permitting, outage planning, construction, commissioning, testing, and project closeout. The P6 Scheduler establishes the schedule framework, integrates contractor and stakeholder inputs, validates logic and progress, identifies critical and near-critical work, evaluates schedule risk and recovery options, and produces reliable forecasts and reporting for project leadership. This position serves as the central scheduling resource for the gas conversion project, ensuring schedule information is accurate, traceable, aligned with approved scope and execution strategy, and suitable for timely decision-making throughout the project lifecycle.
Tasks & Responsibilities
- Develop, maintain, and control the resource- and logic-loaded integrated master schedule in Oracle Primavera P6 for all phases of the JKS2 Natural Gas Conversion Project.
- Support the Lead Project Manager in translating the approved project scope, execution strategy, contract requirements, outage windows, regulatory commitments, and turnover plan into a complete scheduling framework and measurable baseline.
- Create and maintain the work breakdown structure, activity coding, calendars, milestones, constraints, sequencing logic, responsibility assignments, and schedule-level standards required for consistent project controls.
- Coordinate schedule inputs from engineering, procurement, construction, operations, maintenance, environmental, regulatory, safety, transmission, gas solutions, consultants, original equipment manufacturers, and contractors.
- Integrate contractor schedules and specialty-vendor plans into the project master schedule; verify that deliverables, interfaces, assumptions, calendars, logic, and milestones align with project requirements.
- Facilitate schedule-development sessions, planning workshops, pull-planning meetings, progress reviews, look-ahead meetings, outage coordination sessions, and schedule-risk discussions.
- Establish and maintain the approved schedule baseline and document authorized changes in accordance with project change-control and governance requirements.
- Perform routine schedule updates by collecting status, validating actual dates, assessing remaining durations, confirming forecasts, and reconciling progress with field conditions and responsible stakeholders.
- Apply sound critical path method scheduling practices; identify critical and near-critical paths, float erosion, open ends, out-of-sequence progress, excessive constraints, negative float, lag concerns, and other schedule-quality issues.
- Analyze schedule performance and trends, including milestone variance, total float movement, activity slippage, schedule compression, productivity impacts, and forecast changes; clearly communicate causes, consequences, and decision points to the Lead Project Manager.
- Develop schedule scenarios and what-if analyses to evaluate alternatives, construction sequencing, outage interfaces, acceleration opportunities, recovery plans, and the timing effects of scope or execution changes.
- Prepare and maintain near-term look-ahead schedules for engineering deliverables, procurement activities, site mobilization, construction work fronts, tie-ins, outages, commissioning, testing, and turnover activities.
- Coordinate schedule interfaces for site access, enabling work, temporary facilities, material delivery, system outages, gas infrastructure, electrical and controls modifications, inspections, startup, performance testing, and commercial or operational readiness milestones.
- Review engineering and procurement status to ensure drawings, specifications, vendor data, long-lead equipment, submittals, approvals, fabrication, delivery, and material-availability dates support the construction sequence.
- Support time-impact analyses and evaluation of contractor schedule submissions, change requests, delay notifications, and recovery proposals; maintain clear schedule records and contemporaneous documentation for project management review.
- Develop schedule narratives, milestone reports, critical-path summaries, progress curves, variance analyses, dashboards, and executive-level graphics for weekly, monthly, and oversight-committee reporting.
- Reconcile schedule progress with cost, risk, change, procurement, construction, and commissioning information so project forecasts remain aligned across project-control disciplines.
- Track schedule-related risks, assumptions, dependencies, constraints, and required decisions; provide timely notice when emerging issues may affect key milestones or project completion.
- Maintain schedule files, update records, basis documents, coding dictionaries, calendars, layouts, reports, narratives, and supporting documentation in the designated project repository with appropriate version control.
- Perform schedule quality reviews and periodic health checks using project standards and recognized industry practices; recommend corrective actions and follow through to resolution.
- Provide accurate scheduling data for leadership briefings, contractor performance discussions, project reviews, regulatory or governance updates, and other project communications directed by the Lead Project Manager.
- Support field verification and site coordination as needed to validate actual progress, remaining work, access constraints, work-front readiness, and the reasonableness of contractor forecasts.
- Coordinate commissioning and turnover sequencing by system, subsystem, or area, ensuring construction completion, testing, documentation, training, operating readiness, and final acceptance activities are logically integrated.
- Support project closeout by confirming final actual dates, resolving remaining schedule exceptions, archiving the final schedule history, and documenting lessons learned and schedule-performance outcomes.
- Perform additional project scheduling and project-controls duties as assigned in support of the JKS2 Natural Gas Conversion Project.
Minimum Qualifications
- High school diploma or GED.
- Five to ten years of progressively responsible project scheduling or project-controls experience supporting engineering, construction, utility, industrial, or large capital projects.
- Demonstrated proficiency developing and maintaining detailed critical path method schedules in Oracle Primavera P6.
- Working knowledge of schedule baselines, work breakdown structures, activity coding, calendars, logic relationships, constraints, milestones, progress measurement, float, critical-path analysis, forecasting, and change control.
- Ability to integrate multiple contractor and stakeholder schedules into a coordinated master schedule and to evaluate schedule quality and completeness.
- Strong proficiency in Microsoft Excel, PowerPoint, Word, Outlook, Teams, and SharePoint.
- Ability to independently organize competing priorities, meet recurring update cycles, and produce accurate work in a fast-paced project environment.
- Strong analytical, written, verbal, and facilitation skills, including the ability to explain complex schedule information to technical and nontechnical audiences.
- Ability to work professionally and effectively with project leadership, engineering teams, contractors, consultants, plant personnel, operations, and support functions.
Preferred Qualifications
- Associate or bachelor's degree in Construction Management, Engineering, Project Management, Business, or a related field.
- Seven or more years of scheduling or project-controls experience with power generation, natural gas conversion, utility infrastructure, industrial construction, EPC, outage, or commissioning projects.
- Advanced Primavera P6 experience, including schedule integration, resource or cost loading, global change, layouts, reporting, import/export, baseline administration, and contractor schedule review.
- Experience supporting brownfield construction in an operating power plant, including system tie-ins, outage windows, work-area interfaces, startup, commissioning, and turnover sequencing.
- Experience evaluating contractor schedule updates, time-impact analyses, delay claims, recovery schedules, and change-order impacts.
- Familiarity with schedule-quality assessment practices such as DCMA-style checks, schedule risk analysis, earned value concepts, progress curves, and performance trending.
- Professional certification such as PMI-SP, AACE PSP, PMP, or equivalent scheduling/project-controls credential.
- Experienced project controls, capital governance, reporting processes, workflows, and terminology.
US Tech Solutions is a global staff augmentation firm providing a wide range of talent on-demand and total workforce solutions. To know more about US Tech Solutions, please visit www.ustechsolutions.com.
US Tech Solutions is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, colour, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran.
By applying, you acknowledge that AI-assisted tools may be used during hiring.
IND01