Quality Control Inspector - Data Center Construction

WEITZ-ABITAT MISSION CRITICAL

Des Moines (IA)

On-site

USD 55,000 - 75,000

Full time

31 hours ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Competitive Pay
Benefits package

Job summary

The Weitz Company is seeking a Quality Control Inspector for data center projects in Des Moines, IA. This full-time role requires coordinating inspections, understanding contract documents, and ensuring adherence to quality plans.

The ideal candidate will have construction-related experience, strong communication skills, and familiarity with Procore and Bluebeam. This position emphasizes LEAN principles and close collaboration with safety and project teams.

Qualifications

  • Excellent verbal and written communication.
  • Detail-oriented and highly organized.
  • Ability to balance and prioritize projects with deadlines.

Responsibilities

  • Understand project scope and quality requirements; ensure project is constructed accordingly.
  • Schedule and conduct site inspections and surveillance of daily work.
  • Prepare inspection and test plans; document testing, measurements and reports.

Skills

Communication skills
Attention to detail
Project prioritization
Relationship-building

Tools

Procore
Bluebeam
Microsoft Office
Apple devices

Job description

QUALITY CONTROL INSPECTOR - DATA CENTER CONSTRUCTION

Des Moines, Iowa


Full time


Job Description

The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA.


What You’ll Do


  • Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly

  • Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in)

  • Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner

  • Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports

  • Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings

  • Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes

  • Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards

  • Ensure inspections, observations and punch list are documented and stored in accordance to company policy

  • Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review

  • Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity

  • Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to

  • Perform other duties as assigned


What We’re Looking For


  • Experience: A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environment. LEAN principles experience is desirable. Data center experience is strongly preferred.

  • Skills: Excellent verbal and written communication. Ability to balance and prioritize projects with impending deadlines. Detail-oriented and highly organized. Business acumen and relationship-building skills.

  • Technology: Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software. Solid systems experience with Procore and Bluebeam is preferred. Training will be provided on company standards.


What We Offer


  • Competitive Pay

  • Rewarding Bonus Program

  • Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings

  • Employer-Paid Short- and Long-Term Disability Programs

  • Employer-Paid Life Insurance

  • Generous Paid Time Off Provisions

  • 401K Retirement Savings Plan with Company Match

  • Tuition Reimbursement

  • Fully Paid Parental Leave

  • Critical Illness Insurance

  • Accident Insurance

  • Corporate Wellness Program with Wellness Time Off and Rewards


Equal Opportunity Employer

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws).


Visa Sponsorship

Visa sponsorship is not available for this position at this time.


Background Checks

The Company is a drug and alcohol-free workplace and background checks are required if applicable.


Privacy Notice

Review our Privacy Notice.


SMS Consent & Communication

By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2-4 messages per month. Message and data rates may apply according to your mobile carrier plan. You may reply \"STOP\" to opt out or \"HELP\" for assistance at any time. Consent to receive SMS messages is not a condition of employment.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Quality Control Inspector - Data Center Construction
Quality Control Inspector - Data Center Construction

The Weitz Company • Des Moines (IA), Northern (KY)

Hybrid
USD 52,000 - 76,000
Competitive Pay
Bonus Program
Benefits Package
+7
Safety Manager I - Industrial Construction (Traveling)
Safety Manager I - Industrial Construction (Traveling)

The Weitz Company • North Dakota

Hybrid
USD 85,000 - 115,000
Competitive Pay
Rewarding Bonus Program
Comprehensive Benefits with HSA/FSA
+8
Project Engineer - Mechanical
Project Engineer - Mechanical

Weitz • Des Moines (IA)

On-site
USD 70,000 - 90,000
Competitive Pay
Bonus Program
Comprehensive Benefits
+6
Senior Preconstruction Manager - Mission Critical
Senior Preconstruction Manager - Mission Critical

Weitz • Des Moines (IA)

On-site
USD 120,000 - 180,000
Competitive Pay
Bonus Program
Comprehensive Benefits Package
+3
Senior Project Manager - Data Center Construction (Traveling)
Senior Project Manager - Data Center Construction (Traveling)

The Weitz Company • Des Moines (IA)

Hybrid
USD 130,000 - 170,000
Competitive Pay
Bonus Program
Benefits with HSA/FSA
+8
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

Weitz • Phoenix (AZ)

On-site
USD 95,000 - 125,000
Competitive Pay
Rewarding Bonus Program
Benefits Package with Tax-Advantaged H
+1
Safety Manager I (Traveling)
Safety Manager I (Traveling)

EPI Power • Cedar Rapids (IA)

On-site
USD 85,000 - 120,000
Competitive Pay
Benefits Package
Disability Insurance
+6
Electrical Assistant Project Manager
Electrical Assistant Project Manager

EPI Power • Des Moines (IA), Northern (KY)

Hybrid
USD 80,000 - 110,000
Competitive pay
Health benefits
401K with company match
+5
Scheduling Manager I (Traveling)
Scheduling Manager I (Traveling)

Weitz • Cedar Rapids (IA)

On-site
USD 90,000 - 120,000
Competitive Pay
Bonus Program
401K with Company Match
+1
Internships - Nationwide
Internships - Nationwide

The Weitz Company • Des Moines (IA)

On-site
USD 21,000 - 34,000
Competitive Pay
Bonus Program
Benefits Package (HSA/FSA)
+8