Get more replies from employers
Send a job-specific resume in minutes.
The University of North Carolina Greensboro seeks a Project Manager within Facilities Design and Construction to lead multiple capital projects from design through construction. You will prepare budgets, schedules, scope declarations, and oversee contractor delivery to meet quality, schedule, and budget targets.
Ideal candidates have 3–5 years in building design and project management, with NC licensure possible. A related engineering degree and professional certifications are preferred.
Located in North Carolina’s third largest city, UNC Greensboro is among the most diverse, learner-centered public research universities in the state, with 18,000 students in eight colleges and schools pursuing more than 150 areas of undergraduate and over 200 areas of graduate study. UNCG continues to be recognized nationally for academic excellence, access, and affordability. UNCG is ranked No. 1 most affordable institution in North Carolina for net cost by the N.Y. Times and No. 1 in North Carolina for social mobility by The Wall Street Journal — helping first-generation and lower-income students find paths to prosperity. Designated an Innovation and Economic Prosperity University by the Association of Public and Land-grant Universities, UNCG is a community-engaged research institution with a portfolio of more than $67M in research and creative activity. The University’s 2,600 staff help create an annual economic impact for the Piedmont Triad region in excess of $1B.
Primary Purpose of the Organizational Unit
Facilities Design and Construction ( FDC ) provides overall planning, design, and construction management of both new and renovation capital improvement and non-capital projects for the University of North Carolina at Greensboro ( UNCG ). Through assessment of existing facilities and direction from senior administrative officers, the department manages the budget, design, and construction of these projects. The goal of the department is to ensure that the University obtains what is needed, at the desired quality, and the project is constructed within the determined schedule and budget. FDC actively manages approximately 90+ projects simultaneously with total funding of over $400 million dollars annually from State appropriations, State R&R funds or self-liquidated monies. The department directly interfaces with all university divisions, State Construction Office administrators, UNC System Administration, external design firms, contractors and vendors.
Additional Required Certifications, Licensures, and Certificates
Preferred Qualifications
If time-limited, please specify end date for appointment.
Number of Months per Year
Number of Months per Year 12
FLSA
FLSA Exempt
________________________________________________________________________________________________________________________
Percentage Of Time
Percentage Of Time 75%
Key Responsibility
Project Manager
This position will be responsible for managing multiple capital projects through the design and construction of the project.
Percentage Of Time
Percentage Of Time 10%
Key Responsibility
Reporting
Percentage Of Time
Percentage Of Time 10%
Key Responsibility
Employee Engagement
Percentage Of Time
ADA Checklist
R for Rare (0-30%), O for Occasional (30-60%), F for Frequent (60-90%), C for Constant (90-100%).
Physical Effort
Physical Effort Hand Movement-Repetitive Motions - C, Hand Movement-Grasping - C, Holding - F, Finger Dexterity - R, Vision-Skilled Trades - C, Reading - C, Writing - C, Eye-hand coordination - C, Vision-Color Distinction - C, Vision-Preparing/Analyzing figures - C, Vision-Visual inspection - C, Vision-Measuring/Assembling at distance close to eye - C, Hearing - C, Talking - C, Standing - C, Sitting - C, Walking - C, Lifting-0-30 lbs. - C, Pushing/Pulling - F, Climbing-Stairs - C, Climbing-Ladders - R, Bending - O, Squatting - O, Crawling - R, Reaching - C
Work Environment Driving - Car/Truck - O, Extreme noise levels - R, Extreme temperatures - R, Inside - C, Outside - O
Required Documents
Required fields are indicated with an asterisk (*).
(Open Ended Question)