Project Engineer - Heavy Civil Construction & Scheduling

IOC Company

Mission (TX)

On-site

USD 70,000 - 100,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

IOC Company LLC is seeking a Project Engineer for Heavy Civil Construction in the Edinburg/Mission, TX area. The role requires coordinating drawings, specifications, and contract terms while tracking costs and preparing bid packages.

The candidate should hold a four-year degree (or equivalent experience), have a valid license, and be able to lead cross-functional teams and manage multiple projects, including occasional after-hours work. Bilingual English/Spanish skills are a big plus.

Qualifications

  • Must have a 4-year degree, or 5 years of related field experience preferred.
  • Valid driver's license.
  • Ability to manage multiple projects in a fast-paced environment.
  • Work beyond normal hours when needed, including weekends.
  • Superior communication and organizational skills.
  • Strong interpersonal skills for cross-functional teams.
  • Experience with MS Office, Primavera P6 and HCSS HeavyJob preferred, plus Trimble/Propeller tools.

Responsibilities

  • Coordinate contractual requirements, design drawings, and project specs.
  • Handle construction billings and cost tracking for job cost analysis.
  • Maintain records/logs and communicate with vendors, subcontractors, owners.
  • Prepare RFQ and bid packages.
  • Develop and follow a two-week look-ahead schedule.
  • Participate in subcontractor and owner meetings.
  • Prepare and deliver close-out documents and owner's manuals.

Skills

Bilingual English/Spanish
Strong communication
Organizational skills
Multi-project management
Cross-functional collaboration

Education

Bachelor's degree in related field

Tools

Primavera P6
HCSS HeavyJob
Trimble survey equipment
Triple business center
Machine control
Propeller

Job description

IOC Company LLC is seeking a Project Engineer for Heavy Civil Construction in the Edinburg/Mission, TX area. The role requires coordinating drawings, specifications, and contract terms while tracking costs and preparing bid packages.

The candidate should hold a four-year degree (or equivalent experience), have a valid license, and be able to lead cross-functional teams and manage multiple projects, including occasional after-hours work. Bilingual English/Spanish skills are a big plus.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Field & Office Engineer - Heavy Civil & Highway
Field & Office Engineer - Heavy Civil & Highway

IOC Company • Edinburg (TX)

On-site
USD 60,000 - 90,000
Medical, Dental, Vision
401K
Paid Time Off
Project Engineer-Heavy Civil Construction (Req #: 1121)
Project Engineer-Heavy Civil Construction (Req #: 1121)

IOC Company • Mission (TX)

On-site
USD 70,000 - 100,000
Office/Field Engineer – Heavy Civil, Highway and Construction (Req #: 1120)
Office/Field Engineer – Heavy Civil, Highway and Construction (Req #: 1120)

IOC Company • Edinburg (TX)

On-site
USD 60,000 - 90,000
Medical, Dental, Vision
401K
Paid Time Off
Project Engineer: Civil Construction & Safety Lead
Project Engineer: Civil Construction & Safety Lead

Posillico Inc. • Edinburg (TX)

On-site
USD 60,000 - 80,000
Medical, dental, and vision coverage
Life insurance
401(k)
+1
Project Engineer, Heavy Civil (Roads & Bridges) — Growth Ready
Project Engineer, Heavy Civil (Roads & Bridges) — Growth Ready

Urban Infraconstruction • Laredo (TX)

On-site
USD 60,000 - 90,000
Competitive Salary
Career advancement
Company Bonus Plan
+3
Project Engineer
Project Engineer

Phillips Infrastructure Holdings, Inc. • Angleton (TX)

On-site
USD 70,000 - 100,000
Field Project Manager - Safety-Driven Construction Leader
Field Project Manager - Safety-Driven Construction Leader

IOC Company • Edinburg (TX)

Hybrid
USD 95,000 - 135,000
Top-tier medical, dental and vision
401K
Paid time off
Project Engineer - Heavy Construction & Building Projects
Project Engineer - Heavy Construction & Building Projects

IHC Construction Companies LLC • Elgin (IL)

On-site
USD 65,000 - 90,000
E&I Field Engineer / Coordinator
E&I Field Engineer / Coordinator

SII Saulsbury Industries, Inc • Odessa (TX)

On-site
USD 80,000 - 110,000
Project Engineer - Heavy Civil Construction
Project Engineer - Heavy Civil Construction

Webuildidaho • Dallas (TX)

On-site
USD 105,000 - 115,000
Medical, dental, and vision insurance
401(k) with match
Generous PTO
+1