Panel Operator – Commissioning & Plant Startups

Midrex Technologies, Inc.

Charlotte (NC)

Hybrid

USD 65,000 - 95,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Benefits effective Day 1
Dollar-for-dollar 401(k) matching
Profit sharing with 401(k) kicker
Overtime pay
4 weeks paid vacation
Tuition reimbursement
Raffles for sports tickets
Half-day Fridays
Flexible home/office work
Volunteer time
Employee recognition awards

Job summary

Midrex Technologies, Inc. is hiring a Panel Operator in North Carolina to join the Operations team. The role involves directing field tasks, adjusting control parameters, and supporting commissioning with the Operations Lead in both the control room and on site.

You will collaborate with engineers, prepare manuals, and train client personnel while supporting startup activities and shift handovers. Travel is required to support projects globally.

Qualifications

  • Associates degree required.
  • Bachelor's degree preferred.
  • Trade certification in mechanical, electrical or instrumentation preferred.
  • Experience with process plants or operations is a plus.
  • Willingness to work overtime and flexible shifts.

Responsibilities

  • Interface with engineers and field operators to fulfill project tasks.
  • Assist in development of training materials and manuals.
  • Prepare operating instructions, maintenance manuals and commissioning procedures.
  • Participate in training programs and provide on-the-job instruction.
  • Conduct pre-operations checks on electrical, mechanical and instrumentation systems.
  • Support startup activities for new plants during commissioning.
  • Adjust process parameters in the control system to optimize performance.
  • Monitor parameter changes during handover to clients' teams.
  • Maintain logs of plant conditions for shift transitions.
  • Travel on business or field assignments as needed.
  • Support mechanical, electrical, and process departments during design phases.

Education

Associates degree
Bachelors degree
Trade certification

Tools

MS Office

Job description

Midrex Technologies, Inc. is hiring a Panel Operator in North Carolina to join the Operations team. The role involves directing field tasks, adjusting control parameters, and supporting commissioning with the Operations Lead in both the control room and on site.

You will collaborate with engineers, prepare manuals, and train client personnel while supporting startup activities and shift handovers. Travel is required to support projects globally.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Panel Operator – Commissioning & Startup Specialist
Panel Operator – Commissioning & Startup Specialist

Midrex Technologies Inc • Charlotte (NC)

On-site
USD 70,000 - 95,000
401(k) matching
Profit sharing
Paid vacation
+4
Global Commissioning Panel Operator - Travel-Heavy
Global Commissioning Panel Operator - Travel-Heavy

Midrex Technologies • Charlotte (NC)

On-site
USD 60,000 - 90,000
Benefits from Day 1
401(k) matching up to 6%
Profit sharing with 401(k) kicker
+8
Commissioning Panel Operator
Commissioning Panel Operator

Midrex Technologies • Charlotte (NC)

On-site
USD 60,000 - 90,000
Benefits from Day 1
401(k) matching up to 6%
Profit sharing with 401(k) kicker
+8
Commissioning Panel Operator
Commissioning Panel Operator

Midrex Technologies, Inc. • Charlotte (NC)

Hybrid
USD 65,000 - 95,000
Benefits effective Day 1
Dollar-for-dollar 401(k) matching
Profit sharing with 401(k) kicker
+8
Commissioning Panel Operator
Commissioning Panel Operator

Midrex Technologies Inc • Charlotte (NC)

On-site
USD 70,000 - 95,000
401(k) matching
Profit sharing
Paid vacation
+4
Remote Nuclear Commissioning & Startup Engineer
Remote Nuclear Commissioning & Startup Engineer

Hidden Jobs • United States

Hybrid
USD 120,000 - 180,000
Remote Power Plant Commissioning Engineer
Remote Power Plant Commissioning Engineer

Rise Technical Recruitment Limited • Orlando (FL)

Remote
USD 110,000 - 125,000
Benefits
401k
PTO
Substation Automation Commissioning Engineer - Remote/Travel
Substation Automation Commissioning Engineer - Remote/Travel

PDS • North Carolina

Remote
USD 90,000 - 120,000
Lead Control Room Operator: Start-up & Safety
Lead Control Room Operator: Start-up & Safety

Reworld Waste • York

On-site
USD 74,000 - 101,000
Health insurance
PTO (Paid Time Off)
Retirement savings plan
+1
Senior P&C Commissioning Engineer – Remote/Travel Ready
Senior P&C Commissioning Engineer – Remote/Travel Ready

Hitachi Energy Ltd. • Raleigh (NC)

Remote
USD 90,000 - 120,000
401(k) match
Life Insurance
Disability Insurance
+1