P6 Construction Scheduler – Los Angeles

Vanir Construction Management, Inc.

Los Angeles (CA)

Sur place

USD 102 000 - 123 000

Plein temps

14 jours+

Obtenez une réponse de cet employeur

Votre CV et votre lettre de motivation, adaptés exactement à ce que l’employeur recherche.

Passez les filtres ATS

Avantages offerts par ce poste

401(k) with employer match
Medical, dental, vision insurance
HSA contributions
Life insurance
Disability benefits
Paid time off
Teladoc
Employee referral program
EAP

Résumé du poste

Vanir Construction Management, Inc. is seeking a skilled Scheduler to review and analyze contractor schedules using Primavera P6, create earned value curves, and QA/QC schedule submittals for educational facilities and public works projects in the Los Angeles area.

You will prepare reports, develop filters and layouts, and support scheduling management with timely, data-driven insights. A degree in architecture/engineering/construction management and 3 years of scheduling experience are required.

Qualifications

  • Bachelor's degree in architecture, engineering, construction management, construction engineering or related field.
  • Three (3) years full-time paid professional experience responsible in Scheduling for an Owner or General Contractor.
  • Proficiency in Primavera Latest Version and MS Office Suite.
  • Ability to read and interpret architectural plans, drawings and contract specifications.
  • Excellent written and verbal communication skills.
  • Superior organizational and planning skills.

Responsabilités

  • Review Contractor P6 initial Baseline Construction Schedules and identify missing scope, logic or milestones; identify and analyze the critical path; review the required cost loading and provide written technical schedule review comments based on the structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on the structured review templates.
  • Create various activity schedule filters, layouts, and bar-charts utilizing P6 Primavera Schedule Software to assist the project management team in analyzing critical path construction schedule issues.
  • Perform QA/QC on contractor's schedule submittals for conformance with contract scope and terms for projects; P6 program schedules and validate logic ties to ensure conformance with scheduling guidelines for various project types.
  • Ensure proper use of program-level standard codes, layouts and reports necessary to ensure data integrity.
  • Create Earned Value Curves based on template guidelines.
  • Prepare reports as needed and assist scheduling management in reporting projects as necessary.

Connaissances

Primavera P6
MS Office
Reading plans
Communication
Organizational skills

Formation

Bachelor's degree in architecture, engineering, construction management, construction engineering or related field

Outils

Primavera P6

Description du poste

Vanir Construction Management, Inc. is seeking a skilled Scheduler to review and analyze contractor schedules using Primavera P6, create earned value curves, and QA/QC schedule submittals for educational facilities and public works projects in the Los Angeles area.

You will prepare reports, develop filters and layouts, and support scheduling management with timely, data-driven insights. A degree in architecture/engineering/construction management and 3 years of scheduling experience are required.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Senior Primavera P6 Scheduler – Public Construction Programs
Senior Primavera P6 Scheduler – Public Construction Programs

gobravvo • Los Angeles (CA)

Sur place
USD 120 000 - 170 000
Construction Scheduler – P6, EVA & Schedule Analytics
Construction Scheduler – P6, EVA & Schedule Analytics

DESTINATION ENTERPRISES INC • Los Angeles (CA)

Sur place
USD 90 000 - 120 000
401(k)
Dental insurance
Health insurance
+1
Regional Construction Scheduler Lead: Drive Timelines
Regional Construction Scheduler Lead: Drive Timelines

Vanir Construction Management, Inc. • Los Angeles (CA)

Sur place
USD 140 000 - 159 000
401(k) match
Medical insurance
Dental insurance
+11
Senior Construction Scheduler - Primavera P6 & EV Mastery
Senior Construction Scheduler - Primavera P6 & EV Mastery

McKissack & McKissack • Los Angeles (CA)

Sur place
USD 135 000 - 150 000
Medical Insurance
Dental Insurance
Vision Insurance
+3
Senior Construction Scheduler - Primavera P6 Expert, Onsite LA
Senior Construction Scheduler - Primavera P6 Expert, Onsite LA

Energy Jobline ZR • Los Angeles (CA)

Sur place
USD 171 000 - 191 000
PTO 120 hours/year
8 paid holidays per year
Medical/Dental/Vision insurance
+3
Senior Construction Scheduler (P6) – Schedule & EV Analysis
Senior Construction Scheduler (P6) – Schedule & EV Analysis

Vanir Construction Management, Inc. • Los Angeles (CA)

Sur place
USD 130 000 - 147 000
401(k) with employer matching contributions
Medical, dental, and vision benefits
Paid time off
+1
Junior Scheduler - Construction & PMCM
Junior Scheduler - Construction & PMCM

Vanir Construction Management, Inc. • Los Angeles (CA)

Sur place
USD 95 000 - 109 000
401(k) matching
Medical, dental, vision
Paid time off
+1
Construction Scheduler / Project Scheduler in Los Angeles
Construction Scheduler / Project Scheduler in Los Angeles

Energy Jobline ZR • Los Angeles (CA)

Sur place
USD 171 000 - 191 000
PTO 120 hours/year
8 paid holidays per year
Medical/Dental/Vision insurance
+3
Senior Construction Scheduler | Primavera & Planning
Senior Construction Scheduler | Primavera & Planning

AVSAR Construction Development, Inc. • Los Angeles (CA)

Sur place
USD 156 000 - 179 000
401(k) Retirement Plan
Comprehensive Health Benefits
Paid Time Off
+2
Construction Scheduler (P6) for Public Education Projects
Construction Scheduler (P6) for Public Education Projects

gobravvo • Los Angeles (CA)

Sur place
USD 90 000 - 135 000