Outage Project Manager - Field Ops & Scheduling

John H. Carter Company

Sulphur (LA)

On-site

USD 90,000 - 120,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

John H. Carter Co., Inc. in the United States is seeking an experienced outage planner and site lead to manage complex outage campaigns across our territory. You will oversee scope, budget, schedule, resources, and status updates, and travel to multiple sites as required.

The role requires 6+ years in industrial plant operations and maintenance, 2+ years in leadership, and strong knowledge of startup/shutdown sequences, process control, and software tools like SAP and Primavera.

Qualifications

  • Experience leading outage planning and scheduling teams.
  • Ability to communicate clearly under pressure and time constraints.
  • Proven knowledge of startup/shutdown sequences in industrial plants.
  • Strong understanding of process control equipment and instrumentation.
  • Experience reading electrical schematics and P&ID diagrams.

Responsibilities

  • Lead outage planning with budget, schedule, and resource oversight.
  • Coordinate field activities and observe safety and quality standards.
  • Provide written and verbal communications of technical concepts.
  • Ensure milestones align with project plans and budgets.
  • Travel to multiple sites for extended periods; support 12‑hour shifts when needed.
  • Enforce company policies and continuous improvement initiatives.
  • Identify gaps in performance and drive corrective actions.
  • Complete pre-outage walkdowns and risk assessments.

Skills

Outage planning
Scheduling
Startup/shutdown sequences
Process control equipment
Electrical schematics & P&ID
Office365 (Excel, Teams, OneDrive)
SAP
Maximo
Primavera P6
MS Project

Education

Bachelor's degree or higher
Community College/Vo-Tech or better
Technical/Other Training or better

Tools

SAP
Maximo
Primavera P6
Microsoft Project

Job description

John H. Carter Co., Inc. in the United States is seeking an experienced outage planner and site lead to manage complex outage campaigns across our territory. You will oversee scope, budget, schedule, resources, and status updates, and travel to multiple sites as required.

The role requires 6+ years in industrial plant operations and maintenance, 2+ years in leadership, and strong knowledge of startup/shutdown sequences, process control, and software tools like SAP and Primavera.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Outage Project Manager – Valve & Shutdowns
Outage Project Manager – Valve & Shutdowns

John H. Carter Company, Inc. • Sulphur (LA)

On-site
USD 110,000 - 170,000
Outage E&I Planner & Scheduling Lead
Outage E&I Planner & Scheduling Lead

Hargrove Engineers + Constructors • Martinez (CA)

On-site
Medical insurance
Dental insurance
Vision insurance
+1
Project Coordinator
Project Coordinator

NES Fircroft • New Roads (LA)

On-site
USD 85,000 - 115,000
Project Manager - Valve Services
Project Manager - Valve Services

John H. Carter Company, Inc. • Sulphur (LA)

On-site
USD 110,000 - 170,000
Senior Outage Lead - Gas Turbines & Generators
Senior Outage Lead - Gas Turbines & Generators

FieldCore • United States

On-site
USD 103,000 - 172,000
Insurance (medical, dental, vision, F1
Retirement savings
Wellness reimbursement
+1
Power Plant Outage Coordinator (On-Site)
Power Plant Outage Coordinator (On-Site)

GAI Consultants Inc. • Homestead

On-site
USD 80,000 - 110,000
Outage Project Lead I - Specialty Power Projects
Outage Project Lead I - Specialty Power Projects

PowerToFly • Belle Isle (FL)

On-site
USD 90,000 - 130,000
Health benefits
401(k) matching
Tuition reimbursement
+1
Lead E&I Outage Planner – Scheduling & Cost Control
Lead E&I Outage Planner – Scheduling & Cost Control

Hargrove Engineers & Constructors • Martinez (CA)

On-site
USD 62,000 - 74,000
Paid holidays
Personal paid time off
Medical insurance
+5
Outage Scheduler: Primavera P6 & Maximo Expert
Outage Scheduler: Primavera P6 & Maximo Expert

NES Fircroft • New Roads (LA)

On-site
USD 85,000 - 115,000
Lead Project Scheduler – Complex Outage Planning
Lead Project Scheduler – Complex Outage Planning

Revel IT • Oologah (OK)

On-site
USD 85,000 - 120,000