Naval Shipyard Scheduler: Critical-Path Planning

General Dynamics

Bremerton (WA)

In loco

USD 44.000 - 57.000

Tempo pieno

14 giorni+

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro

Il tuo curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Vantaggi offerti da questo lavoro

Medical Insurance
Dental Insurance
Vision Insurance
Life Insurance
401(k) matching

Descrizione del lavoro

General Dynamics NASSCO seeks a Scheduler to produce critical path, resource-loaded production schedules and integrate with AIT and subcontractors. You will develop production reports for management and lead schedule activities aboard Navy ship programs.

Typically, a BA/BS or AA/AS plus related experience is expected; Primavera P6, AIM, Concerto and EP experience is preferred. Travel to shipyards and on vessels is required, and Bremerton, WA is the primary location.

Competenze

  • Typically has a BA/BS in a related field, or AA/AS plus two years' directly related experience, or six years’ directly related experience.
  • Experience with P6 Primavera, AIM, Concerto and EP preferred.
  • Proficient in activity definition, sequencing, critical path analysis, resource loading and resource leveling.
  • Familiar with Government contracting and NASSCO policies.
  • Ability to travel and work aboard vessels.

Mansioni

  • Provides flat file copies of multi-craft, integrated schedules on a pre-determined schedule to the Trades and Production departments, as well as to the customer for advance planning and execution projects.
  • Provides schedule insight during the planning and execution phases of all projects and incorporates changes in work schedule or scope to the overall project.
  • Attends/leads progress meetings on a pre-determined schedule.
  • Produces Gantt, PERT, and manpower charts for submission both internally and externally.
  • Understands delays/impacts to schedule.
  • Follows Condition Found Report/Request for Contract Change (CFR/RCC’s) change management process.
  • Compares submitted progress to actual work completion as seen in production areas and provides feedback to production and trades as to schedule adherence.
  • Provides feedback to production and trades as to possible schedule impacts due to material or RCC delay.
  • Provides schedules to material control to determine material needs by dates. Analyzes material requirements and impact on the integrated schedule to determine if work can be accomplished.
  • Provides technical guidance to subcontractors for work definition, scheduling, and progressing.
  • Assists Senior Scheduler in problem resolution, and determines difference between base line contract work, change order work and new work.
  • Attends Production Support Review (PSR) and customer meetings as required.

Conoscenze

Primavera P6
Scheduling software
Critical path analysis
Resource loading
Resource leveling
MS Office
WBS knowledge
Coordination

Formazione

BA/BS in a related field or AA/AS + 2 years related experience or 6 years related experience

Strumenti

AIM
Concerto
EP

Descrizione del lavoro

General Dynamics NASSCO seeks a Scheduler to produce critical path, resource-loaded production schedules and integrate with AIT and subcontractors. You will develop production reports for management and lead schedule activities aboard Navy ship programs.

Typically, a BA/BS or AA/AS plus related experience is expected; Primavera P6, AIM, Concerto and EP experience is preferred. Travel to shipyards and on vessels is required, and Bremerton, WA is the primary location.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Naval Scheduler (P6) – Ship Repair Planning & Scheduling
Naval Scheduler (P6) – Ship Repair Planning & Scheduling

General Dynamics Corporation • Bremerton (WA)

Ibrido
USD 44.000 - 57.000
Medical, dental, vision insurance
401(k) match
Paid time off
+1
Shipyard Scheduler: Master Plans & Critical Path
Shipyard Scheduler: Master Plans & Critical Path

NASSCO • Bremerton (WA)

In loco
USD 44.000 - 57.000
Lead Scheduler – Naval Ship Repair & Modernization
Lead Scheduler – Naval Ship Repair & Modernization

General Dynamics Corporation • Norfolk (VA)

In loco
USD 68.000 - 91.000
Master Production Scheduler – Ship Repair & Naval Projects
Master Production Scheduler – Ship Repair & Naval Projects

Nassco • Bremerton (WA)

Ibrido
USD 44.000 - 57.000
Lead Scheduler - Naval Ship Repair & Production
Lead Scheduler - Naval Ship Repair & Production

General Dynamics NASSCO • Norfolk (VA)

In loco
USD 68.000 - 91.000
Scheduler 3: Naval Ship Repair & Production
Scheduler 3: Naval Ship Repair & Production

Nassco • Norfolk (VA)

In loco
USD 68.000 - 91.000
Scheduler 3
Scheduler 3

General Dynamics NASSCO • Norfolk (VA)

In loco
USD 68.000 - 91.000
Scheduler 3
Scheduler 3

General Dynamics Corporation • Norfolk (VA)

In loco
USD 68.000 - 91.000
Shipyard CPM Scheduler | Production Planning Pro
Shipyard CPM Scheduler | Production Planning Pro

Ingalls Shipbuilding, a Division of HII • Pascagoula (MS)

In loco
USD 80.000 - 110.000
Ship Project Integration & Scheduling Lead
Ship Project Integration & Scheduling Lead

General Dynamics Corporation • Bremerton (WA)

In loco
USD 79.000 - 104.000