Naval Shipyard Scheduler | Critical Path & Planning

General Dynamics NASSCO

Bremerton (WA)

On-site

USD 48,000 - 63,000

Full time

8 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical insurance
Paid vacations
401(k) match
Tuition reimbursement
Paid holidays

Job summary

National Steel and Shipbuilding Com is seeking a Scheduler to produce critical path, resource-loaded schedules and integrate with AIT and subcontractors. You will develop and deliver production reports to management and support planning across multiple departments.

The role requires a BA/BS or related experience, strong knowledge of WBS, and proficiency with scheduling tools (Primavera P6, AIM, Concerto, EP). Travel to vessels and adherence to safety policies are expected.

Qualifications

  • Typically requires BA/BS in a related field or AA/AS plus 2 years related experience.
  • Six years related experience acceptable.
  • P6 Primavera, AIM, Concerto and EP experience strongly preferred.
  • Deep knowledge of ship repair and modernization processes.
  • Strong knowledge of WBS philosophy and scheduling fundamentals.
  • Proficient in activity definition, sequencing, critical path analysis, and resource leveling.
  • Able to follow instructions and learn quickly.
  • Familiar with Estimating, and Contractual methods in a Government environment.
  • NASSCO safety and environmental policies.

Responsibilities

  • Provide flat-file copies of multi-craft, integrated schedules to Trades and Production and to the customer for planning.
  • Provide schedule insight during planning and execution phases.
  • Lead progress meetings on a pre-determined schedule.
  • Produce Gantt, PERT and manpower charts for internal and external use.
  • Identify delays/impacts to schedule.
  • Follow CFR/RCC change management process.
  • Compare progress to actual work and advise on schedule adherence.
  • Provide material control with schedule-driven material needs.
  • Guide subcontractors on work definition, scheduling, progress.
  • Assist Senior Scheduler in problem resolution and distinguishing baseline work, change order work and new work.
  • Attend PSR and customer meetings as required.

Skills

Ship repair
WBS knowledge
MS Office
Scheduling software
Critical path
Resource loading
Master schedules
Estimating methods
Govt contracts
Instruction following
Safety policies
NASSCO policies

Education

BA/BS or AA/AS
Related experience
Two years experience
Six years experience
P6 Primavera experience
AIM/Concerto/EP

Tools

Primavera P6
AIM
Concerto
EP
Microsoft Office

Job description

National Steel and Shipbuilding Com is seeking a Scheduler to produce critical path, resource-loaded schedules and integrate with AIT and subcontractors. You will develop and deliver production reports to management and support planning across multiple departments.

The role requires a BA/BS or related experience, strong knowledge of WBS, and proficiency with scheduling tools (Primavera P6, AIM, Concerto, EP). Travel to vessels and adherence to safety policies are expected.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Naval Shipyard Scheduler: Critical-Path Planning
Naval Shipyard Scheduler: Critical-Path Planning

General Dynamics Corporation • Bremerton (WA)

On-site
USD 44,000 - 57,000
Medical Insurance
Dental Insurance
Vision Insurance
+2
Lead Scheduler - Naval Ship Repair & Production
Lead Scheduler - Naval Ship Repair & Production

General Dynamics NASSCO • Norfolk (VA)

On-site
USD 68,000 - 91,000
Shipyard Scheduler: Master Plans & Critical Path
Shipyard Scheduler: Master Plans & Critical Path

NASSCO • Bremerton (WA)

On-site
USD 44,000 - 57,000
Naval Scheduler (P6) – Ship Repair Planning & Scheduling
Naval Scheduler (P6) – Ship Repair Planning & Scheduling

General Dynamics Corporation • Bremerton (WA)

Hybrid
USD 44,000 - 57,000
Medical, dental, vision insurance
401(k) match
Paid time off
+1
Scheduler 3: Naval Ship Repair & Production
Scheduler 3: Naval Ship Repair & Production

Nassco • Norfolk (VA)

On-site
USD 68,000 - 91,000
Senior Project Scheduler – Steel Fabrication & Shipyard
Senior Project Scheduler – Steel Fabrication & Shipyard

Colonna's Shipyard • Norfolk (VA)

On-site
USD 70,000 - 82,000
Medical/Dental/Vision
401k with match
Disability insurance
+2
Engineering Planner I: Shipbuilding & Growth Path
Engineering Planner I: Shipbuilding & Growth Path

General Dynamics NASSCO • San Diego (CA)

On-site
USD 72,000 - 147,000
Shipyard Production Scheduler & Planner
Shipyard Production Scheduler & Planner

Colonna's Shipyard, INC • Norfolk (VA)

On-site
USD 68,000 - 86,000
Senior Project Scheduler
Senior Project Scheduler

Bollinger Shipyards • Lockport (LA)

On-site
USD 90,000 - 120,000
Senior Project Scheduler
Senior Project Scheduler

Bollinger Shipyards • Lockport (LA)

On-site
USD 90,000 - 130,000