Material Planner

Whirlpool Corporation

United States

On-site

USD 55,000 - 75,000

Full time

8 days ago
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Paid training
Paid time off
Medical insurance
Dental insurance
Vision insurance
401k
Holidays
Bonus opportunities
Tuition reimbursement
Apprenticeship programs

Job summary

Whirlpool Corporation is seeking a Materials Planner to manage material requirements, schedule deliveries, and expedite material flow on the manufacturing floor. This role collaborates across purchasing, production, and engineering to ensure on-time materials and optimal inventory levels.

The position emphasizes accuracy in records, adherence to specifications, and effective coordination with internal teams to support production goals and continuous improvement.

Qualifications

  • High school diploma or GED.
  • 2-4 years material management experience.
  • Working knowledge of SAP, MRP, EDI, ASN, MPS, WMCS, APS, Excel.

Responsibilities

  • Requirements Planning & Scheduling: Determine material requirements based on engineering and production schedules.
  • Workflow & Expediting: Accelerate the flow of equipment, materials, and assemblies according to priorities.
  • Inventory & Quality Control: Maintain inventory records and verify conformance to specs and PO terms.
  • Coordination: Confer with department heads to determine current and future needs and coordinate material movement.

Education

Bachelor’s degree in supply chain management or related field

Tools

SAP
MRP
EDI
ASN
MPS
WMCS
APS
Excel

Job description

Requisition ID: 73414

About Whirlpool Corporation

Whirlpool Corporation (NYSE: WHR) is a leading home appliance company, in constant
pursuit of improving life at home. As the only major U.S.-based manufacturer of kitchen
and laundry appliances, the company is driving meaningful innovation to meet the evolving
needs of consumers through its iconic brand portfolio, including Whirlpool , KitchenAid ,
JennAir, Maytag , Amana, Brastemp , Consul , and InSinkErator . In 2025, the company reported
approximately $16 billion in annual net sales - close to 90% of which were in the Americas -
41,000 employees, and 35 manufacturing and technology research centers. Additional
information about the company can be found at WhirlpoolCorp.com .

Your responsibilities will include
  • - Requirements Planning & Scheduling: Determine material requirements based on engineering and production schedules. Compute the exact amount of material needed for specific jobs and establish sequential delivery dates based on urgency and availability.
  • - Workflow & Expediting: Arrange and accelerate the flow of equipment, materials, and assemblies according to priorities. Identify and track overdue materials and arrange for immediate transfer or repair to prevent bottlenecks.
  • - Inventory & Quality Control: Maintain precise manual or computerized records, including inventory levels and material locations. Examine incoming materials to verify strict conformance to specifications and purchase orders.
  • - Coordination: Confer with department heads and internal teams to determine current and future needs, as well as coordinate the efficient movement of materials with purchasing, production, and engineering.

The Materials Planner serves as the strategic 'air traffic controller' for the entire inventory lifecycle of equipment, parts, and assemblies, ensuring seamless material flow to meet production goals. This role is responsible for comprehensive requirements planning, scheduling, expediting overdue materials, maintaining precise inventory and quality control records, and coordinating all material movement across purchasing, production, and engineering teams.

The Materials Planner role operates primarily in a professional office environment but requires regular presence on the manufacturing floor. Standard physical requirements include:

  • - Ability to walk and stand for extended periods while monitoring material flow and inventory locations throughout the production facility.
  • - Sharp focus required for reading engineering schedules, computer screens, and verifying small part numbers or specifications on labels.
  • - Frequent use of hands and fingers to operate computer systems, scan inventory, and occasionally handle small parts or equipment assemblies.
  • - Occasional lifting or moving of materials up to 25 pounds when verifying inventory or arranging material flow.
  • - Environment: Must be able to work in a manufacturing environment which may include exposure to noise, varying temperatures, and moving mechanical parts, necessitating the use of proper PPE.
Minimum requirements
  • - High school diploma or GED
  • - 2-4 years material management experience
  • - Working knowledge of computer based software and scheduling tools: (SAP, MRP, EDI, ASN, MPS, WMCS, APS, Excel)
Preferred skills and experiences
  • - Bachelor’s degree in supply chain management or related field is preferred
Why should you apply?
  • - Up to 80+ hours of paid training
  • - Up to 120 hours of paid time off (prorated based on start date)
  • - Medical, dental, vision, 401k, paid holidays, and other benefits available immediately
  • - Quarterly bonus opportunities!
  • - Tuition reimbursement
  • - Apprenticeship Program(s)
  • - Career growth opportunities and development

Connect with us and learn more about Whirlpool Corporation

See what it's like to work at Whirlpool by visiting Whirlpool Careers . Additional information about the company can be found on Facebook , Twitter , LinkedIn , Instagram and YouTube .

Whirlpool Corporation is committed to equal employment opportunity and prohibits any discrimination on the basis of race or ethnicity, religion, sex, pregnancy, gender expression or identity, sexual orientation, age, physical or mental disability, veteran status, or any other category protected by applicable law.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Material Planner
Material Planner

Whirlpool Corporation • Greenville (OH)

On-site
USD 60,000 - 90,000
Up to 80+ hours of paid training
Up to 120 hours of paid time off (pror
Medical, dental, vision, 401k and more
Material Planner
Material Planner

Whirlpool Corporation • Perrysburg (OH)

On-site
USD 60,000 - 85,000
Paid training
Paid time off
Medical & dental
+3
Material Planner
Material Planner

Whirlpool, Inc. • Greenville (OH)

On-site
USD 60,000 - 80,000
Paid training
Paid time off
Benefits package
+3
Material Planner
Material Planner

Whirlpool, Inc. • Perrysburg (OH)

On-site
USD 52,000 - 76,000
Paid training
Paid time off
Benefits from start
+2
Material Planner
Material Planner

Whirlpool, Inc. • Greenville (OH)

On-site
USD 60,000 - 90,000
Materials Technician - Perrysburg, Ohio
Materials Technician - Perrysburg, Ohio

Whirlpool Corporation • Perrysburg (OH)

On-site
USD 30,000 - 41,000
Paid training
Paid time off
Benefits package
+2
Materials Technician - Perrysburg, Ohio
Materials Technician - Perrysburg, Ohio

Whirlpool, Inc. • Perrysburg (OH)

On-site
USD 65,000 - 90,000
Paid training
Paid time off
Benefits package
+2
Analyst, Material Management -Findlay
Analyst, Material Management -Findlay

Whirlpool Corporation • Findlay (OH)

On-site
USD 60,000 - 80,000
Employee discount
Education reimbursement
Fitness programs
+1
Maintenance Electrical Planner - (Day Shift)
Maintenance Electrical Planner - (Day Shift)

Whirlpool Corporation • Clyde (OH)

On-site
USD 34,000 - 42,000
Healthcare: Medical, Dental, Vision
401(k) Retirement Plan
Tuition Reimbursement
Senior Analyst, Materials Lead- Perrysburg
Senior Analyst, Materials Lead- Perrysburg

Whirlpool, Inc. • Clyde (OH)

On-site
USD 90,000 - 130,000
Always On Flexibility
Sabbatical after 5 years