Material Planner

Whirlpool, Inc.

Greenville (OH)

On-site

USD 60,000 - 80,000

Full time

4 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Paid training
Paid time off
Benefits package
Quarterly bonus
Tuition reimbursement
Apprenticeship program

Job summary

Whirlpool Corporation is seeking a Materials Planner to manage the inventory lifecycle of equipment, parts, and assemblies, ensuring smooth material flow to meet production goals. You will perform requirements planning, scheduling, expediting overdue materials, and maintain precise inventory records across purchasing, production, and engineering teams.

This role requires on-site presence on the manufacturing floor and the ability to read schedules, verify part numbers, and manage material

Qualifications

  • High school diploma or GED required.
  • 2–4 years material management experience.
  • Working knowledge of computer based software and scheduling tools: SAP, MRP, EDI, ASN, MPS, WMCS, APS, Excel.

Responsibilities

  • Requirements Planning & Scheduling: determine material requirements based on schedules and establish delivery dates.
  • Workflow & Expediting: accelerate material flow and address overdue items.
  • Inventory & Quality Control: maintain records and verify material conformance to specs and PO’s.
  • Coordination: align with purchasing, production, and engineering on material needs.

Skills

Material planning
Inventory control
Cross-functional collaboration

Education

High school diploma or GED
Bachelor’s degree in supply chain management (preferred)

Tools

SAP
MRP
EDI
ASN
MPS
WMCS
APS
Excel

Job description

About Whirlpool Corporation

Whirlpool Corporation (NYSE: WHR) is a leading home appliance company, in constant pursuit of improving life at home. As the only major U.S.-based manufacturer of kitchen and laundry appliances, the company is driving meaningful innovation to meet the evolving needs of consumers through its iconic brand portfolio, including Whirlpool, KitchenAid, JennAir, Maytag, Amana, Brastemp, Consul, and InSinkErator. In 2025, the company reported approximately $16 billion in annual net sales - close to 90% of which were in the Americas - 41,000 employees, and 35 manufacturing and technology research centers. Additional information about the company can be found at WhirlpoolCorp.com.

This role in summary

The Materials Planner serves as the strategic 'air traffic controller' for the entire inventory lifecycle of equipment, parts, and assemblies, ensuring seamless material flow to meet production goals. This role is responsible for comprehensive requirements planning, scheduling, expediting overdue materials, maintaining precise inventory and quality control records, and coordinating all material movement across purchasing, production, and engineering teams.

Your responsibilities will include
  • Requirements Planning & Scheduling: Determine material requirements based on engineering and production schedules. Compute the exact amount of material needed for specific jobs and establish sequential delivery dates based on urgency and availability.
  • Workflow & Expediting: Arrange and accelerate the flow of equipment, materials, and assemblies according to priorities. Identify and track overdue materials and arrange for immediate transfer or repair to prevent bottlenecks.
  • Inventory & Quality Control: Maintain precise manual or computerized records, including inventory levels and material locations. Examine incoming materials to verify strict conformance to specifications and purchase orders.
  • Coordination: Confer with department heads and internal teams to determine current and future needs, as well as coordinate the efficient movement of materials with purchasing, production, and engineering.

The Materials Planner role operates primarily in a professional office environment but requires regular presence on the manufacturing floor. Standard physical requirements include:

  • Ability to walk and stand for extended periods while monitoring material flow and inventory locations throughout the production facility.
  • Sharp focus required for reading engineering schedules, computer screens, and verifying small part numbers or specifications on labels.
  • Frequent use of hands and fingers to operate computer systems, scan inventory, and occasionally handle small parts or equipment assemblies.
  • Occasional lifting or moving of materials up to 25 pounds when verifying inventory or arranging material flow.
  • Environment: Must be able to work in a manufacturing environment which may include exposure to noise, varying temperatures, and moving mechanical parts, necessitating the use of proper PPE.
Minimum requirements
  • High school diploma or GED
  • 2-4 years material management experience
  • Working knowledge of computer based software and scheduling tools: SAP, MRP, EDI, ASN, MPS, WMCS, APS, Excel
Preferred skills and experiences
  • Bachelor’s degree in supply chain management or related field is preferred
Why should you apply?
  • Up to 80+ hours of paid training
  • Up to 120 hours of paid time off (prorated based on start date)
  • Medical, dental, vision, 401k, paid holidays, and other benefits available immediately
  • Quarterly bonus opportunities!
  • Tuition reimbursement
  • Apprenticeship Program(s)
  • Career growth opportunities and development

Connect with us and learn more about Whirlpool Corporation

See what it's like to work at Whirlpool by visiting Whirlpool Careers. Additional information about the company can be found on Facebook, Twitter, LinkedIn, Instagram and YouTube.

Whirlpool Corporation is committed to equal employment opportunity and prohibits any discrimination on the basis of race or ethnicity, religion, sex, pregnancy, gender expression or identity, sexual orientation, age, physical or mental disability, veteran status, or any other category protected by applicable law.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Material Planner
Material Planner

Whirlpool, Inc. • Perrysburg (OH)

On-site
USD 52,000 - 76,000
Paid training
Paid time off
Benefits from start
+2
Material Planner
Material Planner

Whirlpool, Inc. • Greenville (OH)

On-site
USD 60,000 - 90,000
Material Planner
Material Planner

Whirlpool Corporation • Perrysburg (OH)

On-site
USD 60,000 - 85,000
Paid training
Paid time off
Medical & dental
+3
Materials Technician - Perrysburg, Ohio
Materials Technician - Perrysburg, Ohio

Whirlpool, Inc. • Perrysburg (OH)

On-site
USD 65,000 - 90,000
Paid training
Paid time off
Benefits package
+2
Senior Analyst, Material Management
Senior Analyst, Material Management

Whirlpool Corporation • Tennessee

On-site
USD 110,000 - 150,000
Always On Flexibility
Two-Week Work from Anywhere
Sabbatical
Senior Analyst, Materials Lead- Perrysburg
Senior Analyst, Materials Lead- Perrysburg

Whirlpool, Inc. • Clyde (OH)

On-site
USD 90,000 - 130,000
Always On Flexibility
Sabbatical after 5 years
Senior Analyst, Materials Lead- Perrysburg
Senior Analyst, Materials Lead- Perrysburg

Whirlpool, Inc. • Perrysburg (OH)

On-site
USD 85,000 - 110,000
Always On Flexibility
Sabbatical
Analyst, Material Management -Findlay
Analyst, Material Management -Findlay

Whirlpool, Inc. • Findlay (OH)

On-site
USD 65,000 - 85,000
Materials Technician - Perrysburg, Ohio
Materials Technician - Perrysburg, Ohio

Whirlpool Corporation • Perrysburg (OH)

On-site
USD 30,000 - 41,000
Paid training
Paid time off
Benefits package
+2
Analyst, Material Management -Findlay Findlay,Ohio,USA Manufacturing (20000008) Posted 12 hours ago
Analyst, Material Management -Findlay Findlay,Ohio,USA Manufacturing (20000008) Posted 12 hours ago

Whirlpool, Inc. • Findlay (OH), Northern (KY)

On-site
USD 60,000 - 80,000
Generous benefits package
Employee discount
Educational reimbursement