Marine Project Engineer — Lead Construction & Scheduling

Russell Marine LLC

Ingleside (TX)

In loco

USD 75.000 - 95.000

Tempo pieno

14 giorni+

Una candidatura completa in un minuto

Curriculum e lettera di presentazione personalizzati, pronti da inviare.

Supera i filtri ATS

Descrizione del lavoro

A marine construction company in Ingleside seeks a Project Engineer to coordinate marine, heavy civil, and railroad projects. The role involves managing project schedules, preparing estimates, and ensuring safety standards. Candidates should have a Bachelor's degree in Construction Management or Engineering and 3-4 years of relevant experience. Proficiency in project management software is preferred. This position may involve some travel and long hours.

Competenze

  • 3-4 years of experience in project engineering, preferably in marine construction.
  • Must obtain Transportation Worker Identification Credential (TWIC) or be eligible.
  • Valid Driver’s License required.

Mansioni

  • Manage bidding process and develop estimates.
  • Assist project team with safety documentation.
  • Prepare project schedules and monitor costs.
  • Create quality control plans and facilitate project productivity.

Conoscenze

Excel
Strong written communication
Strong verbal communication
Problem-solving

Formazione

Bachelor’s in Construction Management or Engineering

Strumenti

HCSS
Heavy Bid
Primavera P6

Descrizione del lavoro

A marine construction company in Ingleside seeks a Project Engineer to coordinate marine, heavy civil, and railroad projects. The role involves managing project schedules, preparing estimates, and ensuring safety standards. Candidates should have a Bachelor's degree in Construction Management or Engineering and 3-4 years of relevant experience. Proficiency in project management software is preferred. This position may involve some travel and long hours.
Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Marine Project Engineer - Cost, Scheduling & Procurement
Marine Project Engineer - Cost, Scheduling & Procurement

ORION • Tampa (FL)

In loco
USD 70.000 - 100.000
Medical, including Prescription Drugs
Dental
Vision
+5
Marine Project Engineer — Field Coordination & Safety
Marine Project Engineer — Field Coordination & Safety

ESR Healthcare • Long Beach (CA)

In loco
USD 85.000 - 110.000
Marine Project Engineer - Field-Based (80% Travel)
Marine Project Engineer - Field-Based (80% Travel)

J.F. Brennan Company Inc. • West La Crosse (WI)

Ibrido
USD 60.000 - 75.000
Marine Project Engineer | Field Coor & Safety Lead
Marine Project Engineer | Field Coor & Safety Lead

5 Star Recruitment • Long Beach (CA)

In loco
USD 80.000 - 100.000
Marine Project Engineer - Field-Based (80% Travel)
Marine Project Engineer - Field-Based (80% Travel)

J.F. Brennan Company Inc. • Ottawa (IL)

Ibrido
USD 60.000 - 75.000
Marine Project Engineer - Field Leadership & Scheduling
Marine Project Engineer - Field Leadership & Scheduling

Manson-Construction • Richmond (CA)

In loco
USD 120.000 - 190.000
Full medical/dental/vision
Paid time off
ESOP
+1
Marine Field Engineer & Site Leader
Marine Field Engineer & Site Leader

Weeks Marine, Inc. • New London (CT)

In loco
USD 66.000 - 77.000
Field Engineer — Marine Construction Lead
Field Engineer — Marine Construction Lead

Weeks Marine, Inc. • Houston (TX)

In loco
USD 66.000 - 77.000
Health benefits
Paid time off
Retirement matching
+1
Marine Construction Project Engineer - Field & Safety Oversight
Marine Construction Project Engineer - Field & Safety Oversight

NoHat Staffing • Long Beach (CA)

In loco
USD 111.000 - 130.000
Field Engineer: Marine Construction Leader
Field Engineer: Marine Construction Leader

Weeks Marine, Inc. • New York (NY)

In loco
USD 66.000 - 77.000
Top-tier medical, dental and vision
Wellness & employee assistance
Life insurance
+3