Enable job alerts via email!
Boost your interview chances
Create a job specific, tailored resume for higher success rate.
An innovative aerospace firm is seeking a Manufacturing Engineer to join their dynamic team. In this remote role, you will focus on work breakdown structures, reviewing engineering drawings, and developing manufacturing work plans to ensure timely aircraft assembly. Your expertise in manufacturing engineering and proficiency with tools like Microsoft Office will be essential. This position offers a competitive hourly rate and a comprehensive benefits package, including medical, dental, and vision insurance. If you're passionate about aerospace manufacturing and ready to make an impact, this is the perfect opportunity for you.
Location: Remote
Job ID: #70922
Pay Range: $50-62.50 an hour
Application Deadline: 05/19/25
Citizenship Requirement: US Person
Security Clearance Level: None/Clearable/Clearance Required: None
Experience: Minimum 5 years with degree, 8 years without
Degree Requirements: ABET-accredited technical degree (e.g., Engineering, Engineering Technology) preferred or equivalent combination of education and related work experience
Join a manufacturing engineering team focused on work breakdown structure. Review engineering drawings and parts lists, develop manufacturing work plans following customer guidance and judgment. Structure plans to manage customer timelines and aircraft build sequence.
401K, medical, dental, and vision insurance, sick time as per state law.
Butler America Aerospace, LLC. is an equal opportunity employer committed to diversity and inclusion. Employment decisions are made without regard to race, color, religion, gender, national origin, veteran status, disability, age, sexual orientation, gender identity, gender expression, marital status, or any other protected status.